Discussion Paper

Power Distribution Sector

Key insights

  • Private sector participation in the distribution sector remains minimal, with 93% of the electricity by both volume and revenue sold through state government-owned distribution utilities.
  • Distribution utilities have persistently witnessed poor financial performance.  Key reasons include high technical and commercial losses and underpricing of tariffs.
  • Only six states achieved the renewable purchase obligation (RPO) target of 17.5% in 2019-20.
  • Adoption of open access has been below potential due to high surcharges levied to protect cross-subsidy.  It has been observed that discoms create operational barriers, as they may lose high-paying consumers.

The electricity sector requires significant investments in creating the necessary infrastructure such as generating stations, transmission and distribution lines.  It also requires significant planning to ensure adequate capacity building in advance to cater to demand.  Unlike most other goods, electricity cannot be stored at scale.  This requires supply and demand to be matched at all instances.  Mismatch may lead to issues of grid safety and availability of power, hence, continued coordination between all players in the value chain is required.  These are key considerations for the regulation of the sector.

For regulation, the electricity sector has been demarcated into three sub-sectors, i.e., generation, transmission, and distribution.[1]  Generation is the process of producing power using various sources of energy.  Transmission refers to carrying high voltage power from generation plants to distribution sub-stations through a transmission grid.   Distribution refers to transferring electricity from sub-stations to individual consumers via a distribution network.  Generation was delicensed and opened to private investment in 1991.[2]  Transmission and Distribution are licensed activities as per the Electricity Act, 2003.  In August 2022, the Electricity (Amendment) Bill, 2022 was introduced in Lok Sabha to amend the 2003 Act.[3]  The Bill seeks to introduce certain changes in the way the distribution sector is governed.  In this light, we discuss the market structure and financial position of distribution utilities and some of the underlying issues.  We also discuss the experience with open access and renewable purchase obligation, two important provisions in the 2003 Act, to promote consumer choice and energy transition, respectively.

Distribution Sector: Market Structure and Competition

Since the enactment of the Electricity Act, 2003, generation, transmission, and distribution activities of the erstwhile state electricity boards in many states have been entrusted with separate state government-owned companies (Table 6 in Annexure).  In almost all parts of the country, electricity distribution is a local monopoly business, i.e., a single company, typically a state government-owned entity, serves all consumers in a given area.  These companies have long-term bilateral contracts with generators which are government as well as private companies, to meet a majority of its expected demand.  Tariffs for power procured from generators are regulated by Regulatory Commissions, except where the tie-up is through competitive bidding.  The Act provides for the regulation of the tariff for retail sales through State Electricity Regulatory Commissions.  Coal is the major source of electricity generation (about 75% in 2021-22).  80% of the coal is produced by Coal India Limited (CIL), a major portion of which is sold at notified prices.[4],[5]  

Although private participation is permitted, their presence among discoms is limited.  In 2019-20, the state government-owned enterprises and power departments taken together had a 93% share in the electricity distribution sector by both revenue earned and volume of energy sold.[6]  The experience with private sector participation in distribution has been mixed.  The distribution segment in Delhi was privatised in 2002, with the wire and supply business transferred to privately-owned companies.[7]  Delhi saw a reduction in its aggregate technical and commercial (AT&C) losses and an improvement in the financial health of discoms.  Between 2001-02 and 2018-19, AT&C losses reduced from 45% to 9%, and discoms started earning profits.7  AT&C losses refer to the ratio of power for which the discom did not receive any payment to the total electricity procured by the utility.  Note that the consumer base in Delhi is largely urban, where consumers are densely populated.  In 1999, discoms in Odisha were also privatised, but it was reversed in 2015 due to failure in reducing AT&C losses, and the continued financial stress of discoms.7  Mumbai is one notable area where two discoms operate in the same area.9

Considerations for promoting competition

The Act permits multiple distribution licensees to compete and provide electricity in a given area, through their ‘own network’.  This means that each discom operating in an area would require to lay its own network of wires from the sub-station to the consumer.   This would lead to a replication of network, and a rise in costs for end-consumers as capital costs would be passed on directly or indirectly.2,[8],[9]

The distribution business can be further demarcated into: (i) wire – the physical network which brings electricity from a high-voltage transmission system to the local area or the point of consumption, and (ii) supply- the business of procuring power from generators and supplying it to end-consumer, billing, and collection.   Wire business is a natural monopoly, whereas supply business is considered more suitable for a competitive multi-player market.[10]  Competition in supply is expected to provide improvement in efficiency and loss reduction by a clearer demarcation of responsibilities, i.e., network improvement in the case of the wire company, and efficiency in power procurement and consumer interface in case of the supply company.10  Further, it is expected to enable choice for consumers to switch between suppliers, which would put pressure for better quality of supply, lower tariff, and improved customer service.10

The Forum of Regulators (2013) had observed that for competition in the retail supply business, the following are key pre-requisites: (i) development of a wholesale power market with the presence of multiple players, and avoiding dominant players, (ii) cost-reflective tariffs, (iii) distinct ownership of wire and supply segment to avoid conflict of interest, (iv) plan for treatment of existing distribution and financial losses, (v) suitable supply infrastructure including advanced metering, (vi) ease of switching between suppliers.10  

Since 2014, at multiple instances, amendments to the Electricity Act, 2003 have been proposed to provide for such segregation (see Table 5 in annexure).[11],[12],[13]   In August 2022, the Electricity (Amendment) Bill, 2022 was introduced in Lok Sabha to amend the 2003 Act.3  The Bill seeks to remove the requirement to own a network to distribute electricity.3

Financial Losses of Distribution Utilities

The distribution segment is the interface between consumers and the entire value chain of the power sector, and thus, is key to revenue realisation for the entire sector.  Discoms have continued to register financial losses, and have required government support from time to time to be bailed out from these situations (Table 1).  In four years between 2017-18 and 2020-21, discoms have accumulated losses worth about three lakh crore rupees (Figure 1).  Total borrowings of discoms have increased from Rs 4.6 lakh crore in 2017-18 to Rs 5.9 lakh crore in 2020-21 (Table 2).6  As per the Power Finance Corporation, the net worth of these utilities continues to be negative.6  Persistent financial problems result in delays in payments and non-payment of outstanding dues to generators, which in turn also impacts their fuel suppliers, i.e., coal companies.

Table 1: Key government schemes for the turnaround of the distribution sector over the years

Year

Scheme

Details

2002

Bailout Package

States take over the debt of state electricity boards worth Rs 35,000 crore, 50% waiver of interest payable by state electricity boards to central PSUs

2012

Financial Restructuring Package

States take over 50% of the outstanding short-term liabilities worth Rs 56,908 crore

2015

Ujwal Discom Assurance Yojana (UDAY)

States take over 75% of the debt of discoms worth Rs 2.3 lakh crore and also provide grants for any future losses

2020

Liquidity Infusion Scheme

Discoms get loans worth Rs 1.35 lakh crore from Power Finance Corporation and REC Limited to settle outstanding dues of generators, state governments provide guarantee

2022

Revamped Distribution Sector Scheme

Central government to provide result-linked financial assistance worth Rs 97,631 crore for strengthening of supply infrastructure

Sources: NITI Aayog, Press Releases of the Ministry of Power; PRS.

Figure 1: Cumulative losses of distribution utilities (in Rs crore)

 image
Note: Figures correspond to Profit/(Loss) with Tariff Subsidy Received Excluding Revenue Grant under UDAY and Regulatory Income.
Source: Reports on Performance of Power Utilities, Power Finance Corporation; PRS.

Table 2: Total outstanding debt of distribution utilities (in Rs crore)

Year

Outstanding Debt

Of which Borrowings 
 from State Government

2017-18

4,64,849

1,30,098

2018-19

4,93,045

99,343

2019-20

5,05,246

76,021

2020-21

5,86,194

67,848

Note: Borrowings from state governments have seen a decline, as debt has been converted into equity by multiple states.
Source: Reports on Performance of Power Utilities, Power Finance Corporation; PRS.

Figure 2In 2019-20, in most states, revenue realisation by discoms was lower than the cost of supply 

image

Note: ACS: Average Cost of Supply; ARR: Average Revenue Realisation.  Although the latest figures are available up to 2020-21, figures for the previous year 2019-20 have been shown here, as 2020-21 was a non-standard year due to the impact of COVID-19 and related lockdowns.
Sources: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 3: Cost Structure of Distribution Utilities in 2019-20 (in Rs/kWh)

Cost Head

State Sector

Private Sector

Cost of Power

4.70

5.17

Employee Cost

0.51

0.49

Interest Cost

0.41

0.57

Depreciation

0.21

0.30

Other Costs

0.26

0.47

Total

6.09

6.99

Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 4: Revenue Structure of Distribution Utilities in 2019-20 (in Rs/kWh)

Revenue Head

State Sector

Private Sector

Revenue from Operations

4.24

6.79

Tariff Subsidy Billed

1.01

0.35

Regulatory Income

0.08

0.31

Revenue Grants under UDAY

0.13

0

Other Income and Revenue Grants

0.34

0.12

Total

5.80

7.56

Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Some key underlying reasons for such a financial situation are discussed below.

  • Technical and Commercial Losses: In 2019-20, on aggregate, distribution utilities could bill only 85% of the electricity they injected into the grid.  Further, they collected only 93% of the amount they billed.6  This amounted to aggregate technical and commercial losses of 21%.6  AT&C losses range between as low as 8% in Delhi (mostly urban area), and as high as 60% and 65% in Jammu and Kashmir and Nagaland, respectively.6  These losses can be attributed to: (i) technical losses which include some unavoidable loss in energy transfer, (ii) inefficiencies in energy transfer due to the sub-optimal condition of the network, and (iii) commercial losses such as theft by tapping in and bypassing metering, inadequate metering, and payment default by consumers.  The Revamped Distribution Sector Scheme, launched in 2021, seeks to bring down AT&C losses to 12%-15% by 2024-25.[14]
  • Figure 3: In some states, AT&C losses are above 50%, more than double the national average at 21%

image

Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

  • Under-pricing of tariff:  Tariffs charged to consumers are regulated by State Electricity Regulatory Commissions.  Often, tariffs are designed on a multi-year basis.  At times, they are designed such that the tariff is lower than the cost in initial years, and cost recovery is offloaded to upcoming years.  These costs, recoverable in future, are termed regulatory income.  For instance, in 2020-21, West Bengal discoms booked a regulatory income of Rs 4,061 crore, about 15% of their expected revenue.6  In the same year, Delhi discoms booked a regulatory income of Rs 2,743 crore, about 12% of their expected revenue.6  However, non-recovery of costs would add up as annual losses for discoms.  This would also require discoms to incur costs on working capital loans.  Tamil Nadu discom TANGEDCO, which observes lower AT&C losses than the national average, has been the among the highest loss-making discoms in the country for four consecutive years (see Table 7 in annexure).   This situation is likely due to under-pricing of tariffs.  A white paper released by the Tamil Nadu government (2021) had observed that electricity tariffs were not revised in Tamil Nadu for seven years.[15]  The 2022 Bill seeks to provide that tariff should recover all prudent costs incurred for supply of electricity.3 

  • Power Procurement CostPower procurement costs constitute about 70%-80% of the total costs of discoms.  Power procurement cost varies significantly across states, from as low as about Rs 3-3.5 per kWh in Kerala and Himachal Pradesh, to as high as Rs 5.5-6 per kWh in states such as Delhi and Manipur.  A study report for NITI Aayog (2021) observed that discoms have entered into expensive and long-term thermal PPAs based on incorrect estimates of power demand.[16]   Fixed costs of the excess capacity must be paid, even if power is not generated by the generation company.  In many states, a high percentage of power demand is tied up in long-term contracts.16  Gujarat, Karnataka and Rajasthan have almost 100% of their maximum demand tied up.16  While these arrangements give security in planning supply, they limit the discoms’ ability to take advantage of lower power costs in short-term markets.   Fixed costs, which are roughly 47% of the cost will still have to be paid under these long-term contracts if the discom looks for alternative cheaper sources for procuring power.7 

Figure 4: Power procurement cost in 2019-20 (Rs/kWh)  

image

Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

  • Recovery of fixed costs:  Tariffs charged by generators to discoms have a two-part structure: (i) fixed cost which covers factors such as return on equity, depreciation of assets, tax liabilities of generators, and operation and maintenance costs, (ii) variable cost, which primarily covers fuel costs.7  A report released by NITI Aayog (2019) observed that retail tariffs charged to consumers also follow the two-part structure, however, their fixed charges component does not adequately cover fixed costs payable to generators.7  It determined that while payments on account of fixed costs were in the range of 40%-74% of the total costs, recovery from consumers on account of fixed charges was in the range of only 13%-27% of the total revenue.7  This results in a cashflow mismatch for discoms, which requires them to incur expenses on working capital loans.
  • Government subsidy:  The state government may choose to provide subsidies to keep prices lower for certain categories of consumers.  In the last few years, government subsidy has contributed about 15%-20% of discoms’ revenue.   While determining the retail tariff, the regulators make adjustments for the subsidy.  However, states may not pay all the subsidies booked by discoms in the same financial year.  For example, in 2020-21, discoms received only 85% of the subsidy they billed.6  The corresponding percentage for 2018-19 and 2019-20 was 90% and 95%, respectively.6  There may be delays in payments on a month-on-month basis, which require discoms to fill the gap through working capital loans.7   Interest paid on such loans adds to the costs.  Direct benefit transfer of subsidy has been proposed to address some of the issues with subsidy targeting and disbursement.13

  • Cross-subsidyCross-subsidy is a tariff mechanism where some consumer categories pay a higher price to subsidise the consumption of other consumer categories.  Typically, industrial and commercial consumers cross-subsidise the consumption of residential and agricultural consumers.  In many states, cross-subsidies have been higher than the long-term policy goal of limiting it within ± 20% of the average cost of supply.7  Higher electricity prices may make industries uncompetitive.  This may create an incentive for them to look for direct procurement from generators or set up their own power plants.  In turn, this may make discoms lose out on consumers with higher consumption levels and higher paying capacity.  This would adversely affect their revenue prospects.  Cross-subsidy could also incentivise theft of power.  Cross-subsidy along with explicit government subsidy pay for the provisioning of unmetered free power in many parts of the country.   Not metering consumption may encourage injudicious use of electricity, and also leads to accounting issues for discoms.  It has been observed that unmetered free power to farms has had an adverse impact on groundwater levels due to the injudicious use of tube wells.[17]  

Figure 5: Consumer category-wise share in sales and revenue in 2019-20

image
Note: Others includes public utilities, railway traction, inter-state, and bulk supply.
Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Open Access

As per the Electricity Act, consumers with a demand of 1 MW and above are permitted to procure electricity from sources other than the local discom.[18]  Discoms and transmission companies are mandated to provide such consumers with non-discriminatory access to their network.  Wheeling charges and certain other charges such as cross-subsidy surcharge are payable for such access.  This mechanism is commonly referred to as open access.  Open access aims to: (i) induce efficiency improvement in electricity distribution companies through healthy competition in the power market, (ii) provide choice to consumers for procuring power from their preferred supplier.[19]  Consumers would opt for open access to benefit from lower prices elsewhere.

Various reports have highlighted that adoption of open access has been below potential.10,[20]  One of the key reasons has been high surcharges levied by regulatory commissions to protect the prevailing cross-subsidy level.  If large consumers move away from the local discom, the cross-subsidy level for other consumers of that discom gets adversely impacted.  Hence, a cross-subsidy surcharge was envisaged under the Electricity Act to protect the subsidy level.  However, these high charges lead to open access becoming financially unattractive.  A 2019 study for NITI Aayog also highlighted some operational barriers observed with open access: (i) distribution and transmission licensees denying access citing capacity constraints, (ii) onerous conditions regarding the minimum level of drawl and advance scheduling of power despatch (citing grid discipline), and (iii) delay in executing maintenance requests.7

Renewable Purchase Obligation

To promote clean energy transition, the Electricity Act, 2003 empowers SERCs to specify a renewable purchase obligation (RPO).  RPO refers to a minimum percentage of electricity that discoms are required to purchase from renewable sources such as solar, wind, and biomass.   In 2019-20, the uniform RPO target mandated by the Union Ministry of Power was 17.5%.[21]  Against this, the achievement at all India level was 10.8%.21  In 2019-20, six states met this RPO target.  These are Karnataka, Andhra Pradesh, Rajasthan, Tamil Nadu, Himachal Pradesh, and Sikkim.21  The Ministry of Power had noted that the reasons for non-compliance include the perception of some discoms that: (i) renewable energy costs more than other energy sources, and (ii) additional costs associated with renewable energy integration may be very high.21  It further observed that these are largely associated with system inertia.21

The 2022 Bill adds that RPO should not be below a minimum percentage prescribed by the central government.3  The failure to meet RPO will be punishable with a penalty between 25 and 50 paise per kilowatt of the shortfall.3  In July 2022, the Union Ministry of Power prescribed RPO target for the period between 2022-23 and 2029-30.[22]  The RPO target is set to rise from 24.6% in 2022-23 to 43.3% in 2029-30.22

Figure 6: RPO Compliance level in 2019-20 against the target

Note: Data not available for certain states – Himachal Pradesh, Sikkim, Jammu and Kashmir, and Uttarakhand.  The above chart refers to compliance against the target of 17.5% of the total power requirement to be met from renewable energy sources.
Source: 17th Report: Action Plan for Achievement of 175 GW Renewable Energy Target, Standing Committee on Energy, March 2021; PRS.

Annexure

Table 5: Comparison of the 2014 Bill, the 2018 Draft Bill, the 2020 Draft Bill, and the 2022 Bill to amend the Electricity Act, 2003

2003 Act

2014 Bill

2018 Draft Bill

2020 Draft Bill

2022 Bill

Distribution Market Structure

  • Distribution market structure: More than one distribution licensee can supply electricity in the same area through their own network.
  • Segregation of wire and supply: Separate license for distribution network and supply, only one license to be given for network, there may be more than one supplier, at least one supply licensee should be a government company.
  • Provider of last resort: One company to be designated as a provider of last resort
  • Power procurement:  All existing PPAs of incumbent discoms will be vested in an intermediary company.
  • Segregation of wire and supply: Separate license for distribution network and supply, there could be more than one distribution as well as supply licensees, the requirement for government supply company removed.
  • Power procurement:  Provision regarding intermediary company same as 2014 Bill.     All power procurement should be through PPAs.
  • Distribution sub-licensee:  A discom may appoint a distribution sub-licensee to distribute electricity on its behalf, with prior permission from SERC
  • Distribution license without own network requirement:     A distribution licensee need not own a network to supply electricity, it will be given open access to a network owned by other discoms on payment of wheeling charges  
  • CERC to issue distribution license: CERC is empowered to issue a license for distribution licensee to operate in more than one state
  • Power procurement:  All existing PPAs will be shared among the incumbent and new discoms.  SERC to specify arrangements, and the central government to frame rules in this regard

Retail Tariff and Subsidies

  • Tariff determination: In case of more than one discom in the same area, SERC may specify a ceiling tariff
  • Cost-reflective tariff: Tariff should progressively reflect the cost of supply.
  • Cross-subsidy: Cross-subsidy should be progressively reduced in accordance with the trajectory determined by SERC, and as per the guidance under National Tariff Policy
  • Retail Tariff determination: Supply tariff open to competition but subject to a ceiling tariff decided by SERC, distribution tariff to be determined by SERC
  • Recovery of prudent costs: Tariff should recover prudent costs of supply
  • Cross-subsidy: Reduce cross-subsidy in accordance with the National Tariff Policy
  • Retail Tariff determination: same as the 2014 Bill
  • Cross-subsidy: Eliminate cross-subsidy within three years of enactment
  • DBT of government subsidy: Government subsidy should be disbursed through direct benefit transfer to consumers
  • Cost-reflective tariff: Tariff must reflect the cost of supply.
  • Cross-subsidy: Reduce cross-subsidy in accordance with the National Tariff Policy
  • DBT of government subsidy: Similar to the 2018 Draft Bill
  • Retail Tariff determination: Supply tariff open to competition but subject to a ceiling and a floor tariff decided by SERC
  • Cross-subsidy: Progressively reduce cross-subsidy in accordance with the regulations of CERC

Sources: The Electricity (Amendment) Bill, 2014 and The Electricity (Amendment) Bill, 2022 as introduced in Lok Sabha, Draft Amendments to the Electricity Act, 2003 released in September 2018 and April 2020.

Table 6: Distribution Utility Ownership Structure (2020-21)

Supplier

States/UTs

Power Department

Arunachal Pradesh

Goa

Jammu and Kashmir

Mizoram

Nagaland

Sikkim

State Government-owned Distribution Company 

Andhra Pradesh

Assam

Bihar

Chhattisgarh

Gujarat

Haryana

Jharkhand

Karnataka

Madhya Pradesh 

Maharashtra

Meghalaya

Odisha

Rajasthan

Telangana

Uttar Pradesh

Uttarakhand

West Bengal

State Government-owned Company (integrated generation and distribution utility)

Himachal Pradesh

Kerala

Manipur

Punjab

Tamil Nadu

Tripura

Joint venture between Private Company and State

Delhi

Uttar Pradesh#

Private Sector*

Gujarat

Maharashtra
 West Bengal

Note: #Only in Noida city. *Presence limited to a few cities – Ahmedabad in Gujarat, Mumbai in Maharashtra, and Asansol and Kolkata in West Bengal.
Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 7: Profit After Tax (+) /Loss (-) registered by discoms (Rs crore)

State

2017-18

2018-19

2019-20

2020-21

State Sector

-59,997

-84,622

-65,049

-88,500

Andhra Pradesh

-546

-16,831

-266

-7,350

Arunachal Pradesh

-429

-420

-467

-569

Assam

-259

311

1,141

-107

Bihar

-1,872

-1,845

-2,913

-2,470

Chhattisgarh

-739

-814

163

-219

Goa

26

-121

-276

-215

Gujarat

426

184

314

446

Haryana

412

281

331

637

Himachal Pradesh

-44

132

43

-154

Jammu & Kashmir

-2,999

-2,902

-3,460

-3,274

Jharkhand

-212

-730

-1,111

-2,556

Karnataka

-2,439

-4,889

-2,501

-5,382

Kerala

-784

-135

-270

-1,822

Madhya Pradesh

-5,802

-9,713

-5,034

-9,883

Maharashtra

-3,927

2,549

-5,018

-6,824

Manipur

-8

-42

-30

-15

Meghalaya

-287

-202

-456

-425

Mizoram

87

-260

-51

-440

Nagaland

-62

-94

-94

-143

Odisha

-792

-1,539

-842

-928

Puducherry

5

-39

-306

-11

Punjab

-2,760

363

-975

49

Rajasthan

-11,314

-12,524

-12,277

-5,994

Sikkim

-29

-3

-179

-74

Tamil Nadu

-12,541

-17,186

-16,528

-17,970

Telangana

-6,697

-9,525

-6,966

-6,686

Tripura

28

38

-104

1

Uttar Pradesh

-5,269

-5,902

-3,866

-11,155

Uttarakhand

-229

-808

-323

-152

West Bengal

-871

-1,171

-1,867

-4,261

Private Sector

1,523

2,057

1,100

0

Delhi

109

657

-975

-1,374

Gujarat

574

307

612

655

Maharashtra

-

590

912

-12

Uttar Pradesh

182

126

172

333

West Bengal

658

377

379

398

All-India

-58,474

-82,565

-63,949

-88,500

Note: Figures reported as per actual government subsidy received, and after excluding regulatory income and revenue grant under UDAY.
Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 8: Cost structure in 2020-21 (Rs/kWh)

State

Cost of Power (including own
 generation)

Employee Cost

Interest Cost

Depreciation

Other Costs

Total

State Sector

4.7

0.5

0.4

0.2

0.3

6.2

Andhra Pradesh

4.9

1.0

0.3

0.2

0.1

6.5

Arunachal Pradesh

3.7

2.9

-

-

0.5

7.0

Assam

5.3

0.6

0.2

0.3

0.5

6.8

Bihar

5.1

0.3

0.2

0.4

0.2

6.2

Chhattisgarh

4.3

0.4

0.1

0.1

0.0

4.9

Goa

3.6

0.8

0.0

0.2

0.3

4.8

Gujarat

4.6

0.2

0.0

0.2

0.1

5.2

Haryana

4.4

0.5

0.1

0.2

0.1

5.2

Himachal Pradesh

3.0

1.4

0.4

0.3

0.1

5.1

Jammu & Kashmir

3.5

-

-

-

0.6

4.1

Jharkhand

4.5

0.2

0.3

0.8

0.3

6.1

Karnataka

5.4

0.6

0.4

0.3

0.3

7.1

Kerala

3.1

2.0

0.7

0.4

0.4

6.5

Madhya Pradesh

4.6

0.4

0.4

0.2

0.3

5.9

Maharashtra

4.8

0.4

0.4

0.3

0.5

6.4

Manipur

5.7

0.6

0.0

0.2

0.2

6.7

Meghalaya

4.1

0.8

0.4

0.1

0.2

5.6

Mizoram

5.7

2.6

0.0

0.6

2.2

11.2

Nagaland

5.4

1.8

-

1.8

0.4

9.3

Odisha

3.1

0.6

0.1

0.1

0.5

4.4

Puducherry

4.2

0.4

0.2

0.1

0.1

5.0

Punjab

4.1

0.8

0.3

0.2

0.2

5.7

Rajasthan

4.8

0.3

1.0

0.3

0.3

6.7

Sikkim

2.6

1.5

-

0.3

0.2

4.4

Tamil Nadu

4.5

1.0

1.2

0.3

0.1

7.2

Telangana

5.2

0.6

0.4

0.2

0.0

6.5

Tripura

3.9

0.6

0.1

0.1

0.2

4.8

Uttar Pradesh

5.5

0.2

0.6

0.2

0.4

6.9

Uttarakhand

4.0

0.3

0.1

0.2

0.2

4.7

West Bengal

4.8

0.4

0.4

0.3

0.3

6.1

Private Sector

4.9

0.6

0.6

0.4

0.5

7.0

Delhi

5.1

0.5

1.0

0.3

0.4

7.3

Gujarat

5.4

0.2

0.3

0.4

0.3

6.6

Maharashtra

4.6

0.9

0.2

0.5

0.9

7.1

Uttar Pradesh

4.9

0.2

0.1

0.3

0.3

5.8

West Bengal

4.0

0.9

0.5

0.5

0.8

6.7

All-India

4.7

0.5

0.5

0.2

0.3

6.2

Note: Figures reported based on gross input energy.
Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 9: Revenue structure in 2020-21 (Rs/kWh)

State

Revenue from Operations

Tariff Subsidy

Billed

Regulatory
 Income

Revenue Grant under UDAY for loan
 takeover

Other Income and Revenue
 Grants

Total

(on Tariff Subsidy Billed
 basis)

Tariff Subsidy Received

Total

(on Tariff
 Subsidy
 received
 (excluding
 Regulatory
 Income and
 Revenue
 Grant under
 UDAY for loan
 takeover)

State Sector

4.1

1.1

0.1

0.1

0.4

5.7

0.9

5.4

Andhra Pradesh

4.6

1.5

0.0

-

0.5

6.5

0.6

5.6

Arunachal Pradesh

2.0

-

0.0

-

0.0

2.0

0.0

2.0

Assam

4.9

0.4

0.0

-

1.2

6.5

0.6

6.7

Bihar

3.1

1.8

0.0

-

0.8

5.7

1.6

5.5

Chhattisgarh

3.3

1.2

0.0

-

0.3

4.8

1.2

4.9

Goa

3.5

0.8

0.0

-

0.1

4.3

0.8

4.3

Gujarat

4.4

0.7

0.0

-

0.1

5.2

0.7

5.2

Haryana

4.1

1.0

0.0

-

0.2

5.3

1.0

5.3

Himachal Pradesh

4.4

0.4

0.0

-

0.2

5.0

0.4

5.0

Jammu & Kashmir

1.7

0.7

0.0

-

0.0

2.3

0.7

2.3

Jharkhand

2.6

1.0

0.0

-

0.9

4.4

0.8

4.2

Karnataka

4.3

1.9

0.0

-

0.2

6.5

1.7

6.3

Kerala

5.4

0.2

0.0

-

0.3

5.8

0.2

5.8

Madhya Pradesh

2.5

2.4

0.0

-

0.4

5.3

1.7

4.6

Maharashtra

4.9

0.7

0.2

0.1

0.4

6.3

0.6

5.9

Manipur

4.1

2.5

0.0

-

0.1

6.6

2.5

6.6

Meghalaya

3.7

0.1

0.0

-

0.2

3.9

0.1

3.9

Mizoram

5.0

1.2

-

-

0.1

6.3

0.0

5.1

Nagaland

2.6

-

-

-

5.0

7.5

0.0

7.5

Odisha

3.9

-

0.0

-

0.1

4.0

0.0

4.0

Puducherry

4.9

0.0

-

-

0.0

4.9

0.0

4.9

Punjab

3.6

1.9

-

-

0.4

5.9

1.7

5.7

Rajasthan

4.0

1.9

-

-

0.5

6.4

1.5

6.0

Sikkim

3.8

0.0

-

-

0.0

3.9

0.0

3.8

Tamil Nadu

3.4

0.9

-

0.5

0.8

5.7

0.9

5.1

Telangana

4.2

0.9

-

-

0.3

5.4

0.9

5.4

Tripura

4.6

0.2

-

-

0.1

4.9

0.1

4.9

Uttar Pradesh

4.8

0.7

-

-

0.4

5.9

0.7

5.9

Uttarakhand

4.4

-

-

-

0.2

4.7

0.0

4.7

West Bengal

4.6

0.3

0.9

-

0.2

6.1

0.3

5.2

Private Sector

6.4

0.5

0.6

-

0.1

7.6

0.5

7.0

Delhi

5.7

1.0

0.9

-

0.1

7.8

1.0

6.8

Gujarat

7.1

-

-

-

0.1

7.2

0.0

7.2

Maharashtra

7.1

-

0.7

-

0.0

7.8

0.0

7.1

Uttar Pradesh

7.2

-

-1.0

-

0.1

6.3

0.0

7.3

West Bengal

6.9

-

0.4

-

0.2

7.5

0.0

7.0

All-India

4.2

1.1

0.1

0.0

0.4

5.8

0.9

5.5

Note: Figures reported based on gross input energy.
Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.

Table 10:Billing Efficiency, Collection Efficiency, and AT&C Losses

State

2019-20

2020-21

Billing Efficiency

Collection Efficiency

AT&C Losses

Billing Efficiency

Collection Efficiency

AT&C Losses

State Sector

85%

92%

22%

84%

92%

23%

Andhra Pradesh

92%

97%

11%

92%

79%

27%

Arunachal Pradesh

60%

100%

40%

55%

100%

45%

Assam

81%

95%

23%

81%

100%

19%

Bihar

75%

80%

40%

75%

86%

35%

Chhattisgarh

82%

100%

18%

83%

96%

20%

Goa

89%

100%

11%

88%

99%

13%

Gujarat

90%

98%

12%

88%

100%

12%

Haryana

84%

98%

18%

83%

100%

17%

Himachal Pradesh

88%

99%

13%

86%

100%

14%

Jammu & Kashmir

50%

79%

60%

47%

87%

59%

Jharkhand

78%

81%

37%

65%

90%

41%

Karnataka

88%

94%

18%

88%

96%

15%

Kerala

91%

95%

13%

92%

100%

8%

Madhya Pradesh

80%

87%

30%

77%

76%

41%

Maharashtra

87%

92%

19%

85%

87%

27%

Manipur

81%

95%

23%

86%

93%

20%

Meghalaya

70%

97%

32%

69%

100%

31%

Mizoram

79%

100%

21%

71%

89%

37%

Nagaland

47%

75%

65%

51%

77%

60%

Odisha

79%

90%

29%

76%

93%

29%

Puducherry

87%

93%

18%

88%

91%

20%

Punjab

88%

97%

14%

89%

93%

18%

Rajasthan

83%

85%

30%

81%

91%

26%

Sikkim

71%

100%

29%

71%

100%

29%

Tamil Nadu

86%

99%

15%

88%

98%

14%

Telangana

92%

85%

22%

92%

94%

13%

Tripura

70%

92%

36%

72%

88%

37%

Uttar Pradesh

82%

86%

30%

79%

91%

27%

Uttarakhand

87%

92%

20%

86%

98%

15%

West Bengal

81%

98%

20%

79%

100%

21%

Private Sector

93%

99%

8%

92%

98%

9%

Delhi

93%

99%

8%

92%

99%

9%

Gujarat

95%

100%

5%

95%

99%

6%

Maharashtra

93%

98%

9%

92%

99%

9%

Uttar Pradesh

92%

98%

10%

92%

99%

10%

West Bengal

91%

100%

9%

92%

94%

13%

All-India

85%

93%

21%

84%

92%

22%

Source: Report on Performance of Power Utilities 2020-21, Power Finance Corporation; PRS.  

 

[1] The Electricity Act, 2003, https://cercind.gov.in/Act-with-amendment.pdf.

[2]. “Introducing Competition in Retail Electricity Supply in India”, Forum of Regulators, July 2013, http://www.forumofregulators.gov.in/Data/Reports/6_9_13.pdf

[3] The Electricity (Amendment) Bill, 2022 as introduced in Lok Sabha, https://prsindia.org/files/bills_acts/bills_parliament/2022/Electricity%20(A)%20Bill,%202022.pdf.

[5] File No. 11/2019-O/o DDG, Ministry of Coal, March 4, 2021, https://coal.gov.in/sites/default/files/2021-03/05-03-2021a-nci.pdf

[8] “Roll out Plan for Introduction of Competition in Retail Sale of Electricity”, Forum of Regulators, July 2015, http://www.forumofregulators.gov.in/Data/study/Retail.pdf

[10] “Introducing Competition in Retail Electricity Supply in India”, Forum of Regulators, July 2013, http://www.forumofregulators.gov.in/Data/Reports/6_9_13.pdf. 

[11] The Electricity (Amendment) Bill, 2014, as introduced in Lok Sabha on December 19, 2014, https://prsindia.org/billtrack/the-electricity-amendment-bill-2014.

[12] Draft Amendments to the Electricity Act, 2003, Ministry of Power, September 2018, https://prsindia.org/files/bills_acts/bills_parliament/1970/Draft%20Electricity%20Bill%202018.pdf.

[13] The Draft Electricity (Amendment) Bill, 2020, Ministry of Power, April 17, 2020, https://prsindia.org/billtrack/draft-electricity-amendment-bill-2020.

[14] Revamped Distribution Sector Scheme, Website of REC as accessed on November 20, 2022, https://recindia.nic.in/revamped-distribution-sector-scheme

[15] White Paper on Tamil Nadu Government’s Finances, Finance Department, Government of Tamil Nadu, https://tnbudget.tn.gov.in/tnweb_files/white_paper_2021_english.pdf

[16] Turning Around the Power Distribution Sector, NITI Aayog, August 2021, https://www.niti.gov.in/sites/default/files/2021-08/Electricity-Distribution-Report_030821.pdf.

[17] “Energy-Water-Agriculture Nexus: Grow Solar, Save Water, Double the Farm Income“, Report on Workshop Organised by NITI Aayog and World Bank, December 2019, https://www.niti.gov.in/sites/default/files/2020-01/NITI-Aayog-%26-World-Bank-Energy-Water-Agriculture-Nexus.pdf.

[18] Section 42, The Electricity Act, 2003, https://cercind.gov.in/Act-with-amendment.pdf

[19] Review of Status of Open Access in Distribution, Forum of Regulators, September 2019, http://www.forumofregulators.gov.in/Data/Reports/FOR%20Status%20of%20Open%20Access-13-01-2020.pdf.

[20] 26th Report: Review of Power Tariff Policy, Standing Committee on Energy, August 2022, http://164.100.47.193/lsscommittee/Energy/17_Energy_26.pdf

[21]. 17th Report: Action Plan for Achievement of 175 GW Renewable Energy Target, Standing Committee on Energy, March 2021, https://eparlib.nic.in/bitstream/123456789/800881/1/17_Energy_17.pdf

[22] F. No. 09/13/2021-RCM, Ministry of Power, July 22, 2022, https://powermin.gov.in/sites/default/files/Renewable_Purchase_Obligation_and_Energy_Storage_Obligation_Trajectory_till_2029_30.pdf.

DISCLAIMER: This document is being furnished to you for your information.  You may choose to reproduce or redistribute this report for non-commercial purposes in part or in full to any other person with due acknowledgement of PRS Legislative Research (“PRS”).  The opinions expressed herein are entirely those of the author(s).  PRS makes every effort to use reliable and comprehensive information, but PRS does not represent that the contents of the report are accurate or complete.  PRS is an independent, not-for-profit group.   This document has been prepared without regard to the objectives or opinions of those who may receive it.