The draft Direct Taxes Code Bill seeks to consolidate and amend the law relating to all direct taxes and will replace the Income Tax Act, 1961.  The draft Bill, along with a discussion paper, was released for public comments in August 2009.[1] Following inputs received, the government proposed revisions to the draft Bill in June 2010. The table below summarises these revisions.  The government has not released the changes proposed in the form of a revised draft bill however, but as a new discussion paper.  The note is based on this discussion paper.[2] The Code had proposed a number changes in the current direct tax regime, such as a minimum alternate tax (MAT) on companies’ assets (currently imposed on book profits), and the taxation of certain types of personal savings at the time they are withdrawn by an investor.  Under the new amendments, some of these changes, such as MAT, have been reversed.  Personal savings in specified instruments (such as a public provident fund) will now continue to remain tax-free at all times.  The tax deduction on home loan interest payments, which was done away with by the Code, has now been restored. However, the discussion paper has not specified whether certain other changes proposed by the Code (such as a broadening of personal income tax slabs), will continue to apply.

Issue Income Tax Act, 1961 Draft Direct Taxes Code (August 09) Revisions Proposed (June 2010)
Minimum Alternate Tax (MAT) MAT currently imposed at 18% of profits declared by companies to shareholders. To be imposed on assets rather than profits of companies.  Tax rate proposed at 2% (0.25% for banks) MAT to be imposed on book profit as is the case currently.  Rate not specified.
Personal Saving / retirement benefits Certain personal savings, such as public provident funds, are not taxed at all. Such savings to be taxed at the time of withdrawal by the investor. Such savings to remain tax-exempt at all stages, as is the case currently.
Income from House Property Taxable rent is higher of actual rent or ‘reasonable’ rent set by municipality(less specified deductions). Rent is nil for one self-occupied property. Taxable rent is higher of actual rent or 6% of cost /value set by municipality (less specified deductions). Rent is nil for one self-occupied property. Taxable rent is no longer presumed to be 6% in case of non-let out property. Tax deductions allowed on interest on loans taken to fund such property.
Interest on Home loans Interest on home loans is tax deductible Tax deductions on home loan interest not allowed. Tax deductions for interest on loans allowed, as is currently the case.
Capital Gains Long term and short term gains taxed at different rates. Distinction between long and short term capital gains removed and taxed at the applicable rate; Securities Transaction Tax done away with. Equity shares/mutual funds held for more than a year to be taxed at an applicable rate, after deduction of specified percentage of capital gains. No deductions allowed for investment assets held for less than a year. Securities Transaction tax to be ‘calibrated’ based on new regime. Income on securities trading of FIIs to be classified as capital gains and not business income.
Non-profit Organisations Applies to organizations set up for ‘charitable purposes’. Taxed (at 15% of surplus) only if expenditure is less than 85% of income. To apply to organizations carrying on ‘permitted welfare activities’. To be taxed at 15% of  income which remains unspent at the end of the year.  This surplus is to be calculated on the basis of cash accounting principles. Definition of ‘charitable purpose’ to be retained, as is the case currently. Exemption limit to be given and surplus in excess of this will be taxed.  Up to 15% of surplus / 10% of gross receipts can be carried forward; to be used within 3 years.
Units in Special Economic Zones Tax breaks allowed for developers of Special Economic Zones and units in such zones. Tax breaks to be done away with; developers currently availing of such benefits allowed to enjoy benefits for the term promised (‘grandfathering’). Grandfathering of exemptions allowed for units in SEZs as well as developers.
Non-resident Companies Companies are residents if they are Indian companies or are controlled and managed wholly out of India. Companies are resident if their place of control and management is situated wholly or partly in India, at any time in the year.  The Bill does not define ‘partly’ Companies are resident if ‘place of effective management’ is in India i.e. place where board make their decisions/ where officers or executives perform their functions.
Double Taxation Avoidance Agreements In case of conflict between provisions of the Act, and those in a tax agreement with another country, provisions which are more beneficial to the taxpayer shall apply The provision which comes into force at a later date shall prevail.  Thus provisions of the Code would override those of existing tax agreements. Provisions which more beneficial shall apply, as is the case currently.  However, tax agreements will not prevail if anti-avoidance rule is used, or in case of certain provisions which apply to foreign companies.
General Anti-Avoidance Rule No provision Commissioner of Income Tax can declare any arrangement by a taxpayer as ‘impermissible’, if in his judgement, its main purpose was to have obtained a tax benefit. CBDT to issue guidelines as to when GAAR can be invoked; GAAR to be invoked only in cases of tax avoidance beyond a specified limit; disputes can be taken to Dispute Resolution Panel.
Wealth Tax Charged at 1% of net wealth above Rs 15 lakh To be charged at 0.25% on net wealth above Rs 50 crore; scope of taxable wealth widened to cover financial assets. Wealth tax to be levied ‘broadly on same lines’ as Wealth Tax Act, 1957. Specified unproductive assets to be subject to wealth tax; nonprofit organizations to be exempt.  Tax rate and exemption limit not specified.
Source: Income Tax Act, 1961, Draft Direct Taxes Code Bill (August 2009), New Discussion Paper (June 2010), PRS

[1] See PRS Legislative Brief on Draft Direct Taxes Code (version of August 2009) at  http://prsindia.org/index.php?name=Sections&id=6 [2] Available at http://finmin.nic.in/Dtcode/index.html

   

Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.