As of May 22, 2020, there are 1,18,447 confirmed cases of COVID-19 in India, which is 76% higher than the cases on May 11, 2020 (67,152). Out of total confirmed cases, there are 66,330 active cases, 48,354 patients have been cured/discharged and 3,583 have died (Figure 1). As the spread of COVID-19 has increased across India, the central government has continued to announce several policy decisions to contain the spread, and support citizens and businesses who are being affected by the pandemic.  In this blog post, we summarise some of the key measures taken by the central government in this regard between May 11 and May 22, 2020.

Figure 1: Number of day wise COVID 19 cases as on May 22, 2020

 image

Aatma Nirbhar Bharat Abhiyaan

On May 12, the Prime Minister, Mr. Narendra Modi, announced a special economic package of Rs 20 lakh crore (equivalent to 10% of India’s GDP) aimed towards making the country ready for the tough competition in the global supply chain and empowering the poor, labourers, migrants who have been adversely affected by COVID-19.   Following this announcement, the Finance Minister, Ms. Nirmala Sitharaman, in five press conferences, announced the detailed measures under the economic package.  The economic package includes earlier measures taken by the government to support the citizens and businesses of India.  A break-up of the package is presented in Table 1.

Table 1: Break-up of stimulus from Aatma Nirbhar Bharat Abhiyaan package

Item

Key Topics covered

Amount (in Rs crore)

Stimulus from earlier measures

 Pradhan Mantri Garib Kalyan Yojana, Tax Concessions, and the Prime Minister's announcement for health sector

1,92,800

Part 1

Business including Micro, Small and Medium Enterprises (MSMEs)

5,94,550

Part 2

Poor people including migrants and farmers.

3,10,000

Part 3

Agriculture and allied sectors.

1,50,000

Part 4 and Part 5

Part 4: Coal and mineral sectors, defence sector, civil Aviation, airports and aircraft Maintenance, Repair and Overhaul (MRO), power sector, social infrastructures, space, atomic energy.

Part 5: Government reforms and other provisions including public health and education, additional allocation to MGNREGS

48,100

Sub Total

 

1,295,400

RBI Measures (Actual)

Reduction in Cash Reserve Ratio (CRR), Special Liquidity Facility (SLF) for mutual funds, Special refinance facilities for NABARD, SIDBI and NHB at policy repo rate

8,01,603

Grand Total

 

20,97,053

Note: Part 1, 2, 3, 4, 5 in the table above represents the five press conferences conducted by the Finance Minister to announce the details of the economic package.

Source:   Presentation made by Union Finance & Corporate Affairs Minister Smt. Nirmala Sitharaman under Aatmanirbhar Bharat Abhiyaan to support Indian economy in fight against COVID-19, Ministry of Finance, May 13, 2020, PRS.

For more information on the details of the announcements made under Aatma Nirbhar Bharat Abhiyaan, please see here.

Finance

Following the Prime Minister’s and Finance Minister’s announcements, further announcements were also made. 

  • Cabinet approved the additional funding of Rs three lakh crore to eligible MSMEs and interested MUDRA borrowers under the Emergency Credit Line Guarantee Scheme.  The funding will be covered under 100% guarantee coverage by the National Credit Guarantee Trustee Company Limited in the form of a Guaranteed Emergency Credit Line facility.
     
  • Cabinet also approved the special liquidity scheme for Non-Banking Finance Companies (NBFCs)/Housing Finance Companies (HFCs).  The details of the scheme were shared by the Finance Minister in May 2020 under the Aatma Nirbhar Bharat Abhiyaan.
     
  • Securities and Exchange Board of India (SEBI) revised the post-default curing period for credit rating agencies (CRAs) in their circular dated May 21, 2020.  Now, once the default is cured and payments are regularised, CRAs will upgrade the rating from default to non-investment grade after a period of 90 days based on the satisfactory performance by the company during the period.  As of now, after the entity corrects the default, the CRAs upgrade the rating from default to speculative grade in 90 days and from default to investment grade in 365 days.
     
  • On May 22, the Monetary Policy Committee of Reserve Bank of India (RBI), reduced the policy repo rate under the liquidity adjustment facility (LAF) by 40 bps to 4% from 4.4%.  The marginal standing facility (MSF) and the bank rate have been reduced to 4.25% from 4.65%.  The reverse repo rate has been also reduced from 3.75% to 3.35%.
     
  • The Reserve bank of India (RBI) issued a statement with various development and regulatory policies.  The policies specify details on measures (i) to improve the functioning of market; (ii) to support exports and imports; (iii) to ease financial stress; (iv) for debt management.  The cash reserve ratio (CRR) of all banks will be reduced by 100 basis points to 3%, which will provide a liquidity support of Rs 1,37,000 crore across the banking system. The policy extends the moratorium on payment of instalments of all type of loans as on March 1, 2020 by another three months (up to August 2020).   This is applicable to loans from all commercial banks including Non-Banking Finance Companies (NBFCs) and co-operative banks.   

Lockdown 4.0

The Ministry of Home Affairs (MHA) passed an order extending the lockdown till May 31, 2020. This lockdown will have more relaxations compared to earlier lockdowns.

Zoning of areas

The new guidelines have authorised states/union territories (UTs) to define the red, green and orange zones based on the parameters prescribed by the Health Ministry.  The states/UTs can define a district, or a municipal corporation/ municipality or even smaller administrative units such as sub-divisions, etc. as a red or green or orange zone.

  • Red and Orange Zones: Within red and orange zones, the local authorities will identify containment and buffer zones based on the guidelines from the Health Ministry.  Buffer zones are areas adjacent to containment zones which have a high probability of cases.
     
  • Containment Zones: Movement of individuals will not be allowed in containment zones to ensure strict perimeter control except for medical emergencies and supply of essential goods and services.

The prohibition of certain activities or restrictions in various zones within a state will be at the discretion of the state/union territory as deemed necessary.

Prohibited Activities

Some activities will continue to remain prohibited throughout the country.  These include:

  • all international air travel of passengers, except for domestic medical services, domestic air ambulance and for security purposes or purposes as permitted by MHA;
     
  • metro rail services;
     
  • running of schools, colleges, educational and training/coaching institutions;
     
  • hotels, restaurants and other hospitality services, except for the running of canteens in bus depots, railway stations and airports;
     
  • places of large public gatherings such as cinemas, shopping malls, and gymnasiums entertainment parks;
     
  • social, political, cultural, and similar gatherings and other large congregations; and access to religious places/places of worship for the public. 

Online/ distance learning is encouraged and permitted; and, restaurants will be allowed to operate kitchens for home delivery of food items.

National Directives for COVID Management

The Ministry of Home Affairs issued the National Directives for COVID Management, which apply to public places and work places. As per these guidelines:

  • wearing of face covers is compulsory; 
     
  • spitting will be punishable with fine as may be prescribed in accordance with its laws, rules or regulations by the State/ UT local authority; 
     
  • social distancing is to be followed by all persons in public places and in transport;  
     
  • marriage related gathering has been limited to 50 guests;  
     
  • for funerals/ last rites, the maximum number of persons allowed is 20;  
     
  • consumption of liquor, paan, gutkha and tobacco etc., is not allowed in public places.  

Guidelines for workplaces include:

  • employers will encourage practice of work from home to the extent possible; 
     
  • staggering of work hours will be adopted in respect of all offices and other establishments.  
     
  • there will be provision for thermal scanning, hand wash and sanitizers at all entry and exit points and common areas;
     
  • all work places and other sensitive locations are to be sanitized regularly.  
     
  • social distancing will have to be ensured through adequate distance between workers, adequate gaps between shifts, staggering the lunch break of staff and so on.

Aarogya Setu

The District authorities will ensure installation of the Aarogya Setu application on compatible mobile phones of all individuals and will have to regularly update their health status on the app.

Aarogya Setu Data access and knowledge sharing protocol, 2020

The Ministry of Electronics and Information Technology, Government of India issued a notification on the data access and knowledge sharing protocol, 2020 in reference to the Aarogya Setu mobile application.  The protocol will: (i) ensure secure collection of data by the mobile application, (ii) protect the personal data of individuals, and (iii) ensure efficient use and sharing of personal or non-personal data of the application users.  The protocol provides principles for: (i) collection and processing of response data, (ii) sharing of response data, (iii) obligations of entities with whom the data will be shared, and (iv) sharing of data for research purpose.  A sunset clause is applicable to the protocol subjecting it to a review after 6 months unless there is any extension of sunset clause in wake of the pandemic.

Travel and Movement

  • The Ministry of Railways announced to run Shramik special trains from all districts connected by railways in the country.  The ministry is awaiting details on migrants from each district to operationalise the trains.
     
  • The Ministry of Home Affairs (MHA) has written to Chief Secretaries of all states allowing them to arrange special buses to carry people from railway stations to their home.  This provision is applicable, with condition of maintaining proper social distancing norms, only at places where public or personal transport is not available.
     
  • On May 11, 2020, MHA passed an order permitting movement of individuals by trains.   Following the order, 15 pair of trains are being run   connecting New Delhi to Dibrugarh, Agartala, Howrah, Patna, Bilaspur, Ranchi, Bhubaneswar, Secunderabad, Bengaluru, Chennai, Thiruvananthapuram, Madgaon, Mumbai Central, Ahmedabad and Jammu Tawi.
     
  • The Ministry of Railways in consultation with the MHA and the Ministry of Health & Family Welfare, issued guidelines on partial restoration of train services (other than the Shramik trains) from June 1, 2020.  200 passenger trains with AC, Non-AC and general classes will be operationalised.   Booking for these trains commenced on May 21, 2020.  The guidelines contain detailed information on (i) booking of tickets and charting, (ii) quota permitted, (iii) catering, and (iv) linen and blankets.  All passengers will have to download and use the Aarogya Setu mobile application.
     
  • On May 19, 2020, MHA issued a Standard operating Procedure (SOP) for movement of stranded workers by trains.   As per the SOP, the Ministry of Railways will permit the movement of stranded workers by trains in consultation with MHA.  The Ministry of Railways will finalise the schedules for trains including the stoppages and destinations and will communicated it to state/UTs.  On arrival at the destination, the travelling passengers will have to adhere to the health protocols as prescribed by the destination state/UT.  The inter-state movement of stranded persons by bus and vehicles will be allowed subject to mutual consent of the concerned States/UTs.  The intra-state movement of vehicles will be at the discretion of the states/UTs.
     
  • The MHA amended the order on Lockdown 4.0 to facilitate domestic air travel for stranded persons.  Following the amendment, the Ministry of Civil Aviation issued the order for commencement of domestic air travel of passengers from May 25, 2020.  The passengers will have to show a self-declaration, using the Aarogya Setu mobile application, that they are free of COVID-19 symptoms and those with Red status will not be allowed to travel.  The order contains three annexures with (i) general instructions for commencement of domestic air travel, (ii) the detailed guidelines to be followed by air passengers, and (iii) specific operating guidelines for major stakeholders.

Health

  • The Ministry of Health and Family Welfare issued: (i) updated containment plan on COVID-19, and (ii) updated containment plan for large outbreaks of COVID 19.   These plans provide information on various scenarios of COVID-19 and strategies to control the spread of the disease including definitions, action plans and specific details on (i) identification of containment zones and buffer zones; (ii) perimeter control; (iii) support from various stakeholders such as testing laboratories and hospitals; (iv) pharamaceutical and non-pharmaceutical interventions; and (v) risk communication.

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

By Rohit & Anirudh A modified 'Modernization of State Police Forces' scheme was started by the central government in 2000-01. One of the objectives was to help police forces in meeting the emerging challenges to internal security in the form of terrorism, naxalism etc. The scheme aims to modernize police forces in terms of:

  • Mobility (including purchase of bullet proof and mine proof vehicles)
  • Weaponry
  • Communication Systems
  • Training
  • Forensic Science Laboratory/ Finger Printing Bureau
  • Equipments
  • Buildings

Under this scheme, States have been clubbed into different categories and Centre-State cost sharing is category specific. Since 2005-06, States have been categorized as category ‘A’ and ‘B’ with 100% and 75% Central funding respectively. All the North Eastern States, namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura and Sikkim have been placed in category ‘A’ and thus, are entitled to receive 100% Central assistance for implementation of their annual approved plans. Recently, CAG decided to evaluate the working of the scheme and commissioned ‘performance audit’ reviews covering select general category and special category States. Each review covers a contiguous five year period between 2000 and 2007, but varies across selected states. For the periods under review, each state had a plan outlay (the total amount proposed to be spent in modernizing the state's police forces). However, in most cases, the actual release of funds fell significantly short of this outlay - in some cases the Centre did not contribute its share, in others the States lagged behind. For instance, in the case of Bihar, the Centre released only 56% of its share; while in the case of Rajasthan and West Bengal, the States did not release any funds at all. The graph below shows the actual releases by the Centre and the States (as percentages of their share in the proposed outlays): Further, even the funds that were released were not fully utilized. Thus, the amount finally spent fell significantly short of the initial proposal. The graph below shows the actual expenditure by State: Following are some of the other main findings from the CAG report:

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the MHA were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent money on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan.

c) Jharkhand – District Control rooms remained non-functional because of shortage of manpower.

Weapons

§ Police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the Ministry of Home Affairs (MHA) were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent Rs 32 crore on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones, and no additions were made.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles. 203 ambassador cars were procured, though only 55 were approved by the MHA.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy. Satisfaction levels with the housing provided were also very low.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan, and only 1045 units were completed by 2006.

c) Jharkhand – District Control rooms remained non-functional even after spending Rs 2 crore because of shortage of manpower.

Weapons

§ It was observed that the police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.