Applications for LAMP Fellowship 2025-26 are now open. Apply here. The last date for submitting applications is December 21, 2024
The Civil Damage for Nuclear Liability Bill, 2010 has been criticised on many grounds (Also click here), including (a) capping liability for the operator, (b) fixing a low cap on the amount of liability of the operator, and (c) making the operator solely liable. We summarise the main principles of civil nuclear liability mentioned in IAEA's Handbook on Nuclear Law: Strict Liability of the Operator: The operator is held liable regardless of fault. Those claiming compensation do not need to prove negligence or any other type of fault on the part of the operator. The operator is liable merely by virtue of the fact that damage has been caused. Legal channeling of liability on the operator: "The operator of a nuclear installation is exclusively liable for nuclear damage. No other person may be held liable, and the operator cannot be held liable under other legal provisions (e.g. tort law)...This concept is a feature of nuclear liability law unmatched in other fields of law." The reason for this has been quoted in the Handbook as:
"...Firstly, it is desirable to avoid difficult and lengthy questions of complicated legal cross-actions to establish in individual cases who is legally liable. Secondly, such channelling obviates the necessity for all those who might be associated with construction or operation of a nuclear installation other than the operator himself to take out insurance also, and thus allows a concentration of the insurance capacity available.”
Limiting the amount of liability: "Limitation of liability in amount is clearly an advantage for the operator. Legislators feel that unlimited liability, or very high liability amounts, would discourage people from engaging in nuclear related activities. Operators should not be exposed to financial burdens that could entail immediate bankruptcy....Whatever figure is established by the legislator will seem to be arbitrary, but, in the event of a nuclear catastrophe, the State will inevitably step in and pay additional compensation. Civil law is not designed to cope with catastrophes; these require special measures." Limitation of liability in time: "In all legal systems there is a time limit for the submission of claims. In many States the normal time limit in general tort law is 30 years. Claims for compensation for nuclear damage must be submitted within 30 years in the event of personal injury and within 10 years in the event of other damage. The 30 year period in the event of personal injury is due to the fact that radiation damage may be latent for a long time; other damage should be evident within the 10 year period." Insurance coverage: "The nuclear liability conventions require that the operator maintain insurance or provide other financial security covering its liability for nuclear damage in such amount, of such type and in such terms as the Installation State specifies....This ensures that the liability amount of the operator is always covered by an equal amount of money. The congruence principle is to the advantage both of the victims of a nuclear incident and of the operator. The victims have the assurance that their claims are financially covered, and the operator has funds available for compensation and does not need to convert assets into cash.
On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary. It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019. The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management. In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.
Nation-wide sanitation programmes in past
According to the Census, the rural sanitation coverage in India was only 1% in 1981.
The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas. Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC). While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.
By 2001, only 22% of the rural families had access to toilets. It increased further to 32.7% by 2011. In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).
In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation. In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets. Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations. In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.
On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively. While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs. In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.
Swachh Bharat Mission – Gramin (SBM-Gramin)
The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live. Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).
Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation.
Sources: Union Budgets 2014-15 to 2021-22; PRS.
The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years. Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%. However, every year since 2018-19, there has been some under-utilisation of the allocated amount.
As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2). However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”. The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.
Figure 2: Toilet coverage for rural households
Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.
The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line. It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.
In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore. ODF Plus includes sustaining the ODF status, and solid and liquid waste management. Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.
Swachh Bharat Mission – Urban (SBM-Urban)
SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country. One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019. However, this target was then lowered to 59 lakh IHHLS by 2019. This target was achieved by 2020 (see Table 1).
Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)
Targets |
Original Target |
Revised Target |
Actual Constructed |
Individual Household Latrines |
66,42,000 |
58,99,637 |
62,60,606 |
Community and Public Toilets |
5,08,000 |
5,07,587 |
6,15,864 |
Sources: Swachh Bharat Mission Urban - Dashboard; PRS.
Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.
Sources: Union Budget 2014-15 to 2021-22; PRS.
The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance. Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene. Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme.
The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing. The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21. In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).
Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)
Targets |
Target |
Progress |
Progress |
Door to Door Waste Collection (Wards) |
86,284 |
81,535 (96%) |
83,435 (97%) |
Source Segregation (Wards) |
86,284 |
64,730 (75%) |
67,367 (78%) |
Waste Processing (in %) |
100% |
65% |
68% |
Sources: Standing Committee on Urban Development (2021); PRS.
In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched. Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites. On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.