In the late 1960s and 70s, defections (elected legislators changing parties after the election) in Parliament and State Legislatures became very frequent, so frequent in fact, that the epithet "Aaya Ram Gaya Ram" was coined to describe the same.  To curb this problem which created instability in our legislatures, Parliament amended the Constitution.  They inserted the Tenth Schedule to the Constitution "to curb the evil of political defections".  As a result, we currently have an anti-defection law with the following features: 1.  If an MP/MLA who belongs to a political party voluntarily resigns from his party or, disobeys the party "whip" (a direction given by the party to all MPs/ MLAs to vote in a certain manner), he is disqualified.   The party may however condone the MP/ MLA within 15 days. 2.  An independent MP/ MLA cannot join a political party after the election. 3.  An MP/ MLA who is nominated (to the Rajya Sabha or upper houses in state legislatures) can only join a party within 6 months of his election. 4.  Mergers of well-defined groups of individuals or political parties are exempted from disqualification if certain conditions are met. 5.  The decision to disqualify is taken by the Speaker/ Chairman of the House. The table below summarizes provisions of anti-defection law in some other countries.  (For more, click here).  As one may note, a number of developed countries do not have any law to regulate defection.

Regulation of defection in some countries

Country Experi-ence Law on defection The Law on Defection
Bangladesh Yes Yes The Constitution says a member shall vacate his seat if he resigns from or votes against the directions given by his party.  The dispute is referred by the Speaker to the Election Commission.
Kenya Yes Yes The Constitution states that a member who resigns from his party has to vacate his seat.  The decision is by the Speaker, and the member may appeal to the High Court.
Singapore Yes Yes Constitution says a member must vacate his seat if he resigns, or is expelled from his party.  Article 48 states that Parliament decides on any question relating to the disqualification of a member.
South Africa Yes Yes The Constitution provides that a member loses membership of the Parliament if he ceases to be a member of the party that nominated him.
Australia Yes No  
Canada Yes No  
France Yes No  
Germany Yes No  
Malaysia Yes No  
United Kingdom Yes No  

Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector.  The Kudankulam power plant will have two reactors.  At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of  total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011.  In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu).  The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12.  The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh.  Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%).  A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators.  To view data in ascending or descending order, simply click the relevant column heading.  (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /]   Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery