The Consumer Protection Bill, 2018 was introduced in Lok Sabha in January 2018. The Bill replaces the Consumer Protection Act, 1986. Previously in 2015, a Bill had been introduced to replace the 1986 Act. The 2015 Bill acknowledged that the rapid change in consumer markets, introduction of practices such as misleading advertisements, and new modes of transactions (online, teleshopping, etc.) had necessitated the need for a new law. The Bill was subsequently referred to a Standing Committee, which recommended several changes to it. The Bill was withdrawn and replaced with the Consumer Protection Bill, 2018. The Bill is listed for passage in the ongoing Monsoon Session. In this post, we analyse the Bill in its current form.

How is the 2018 Bill different from the 1986 Act?

The Bill adds various provisions for consumer protection that were absent in the 1986 Act. Key among them are the provisions on product liability and unfair contracts. Under product liability, when a consumer suffers an injury, property damage or death due to a defect in a product or service, he can file a claim for compensation under product liability. The Bill outlines cases in which the product manufacturer, service provider and seller will be held guilty under product liability. Under the proposed law, to claim product liability, an aggrieved consumer has to prove any one of the conditions mentioned in the Bill with regard to a manufacturer, service provider and seller, as the case may be.

An unfair contract has been defined as a contract between a consumer and manufacturer/ service provider if it causes significant change in consumer rights. Unfair contracts cover six terms, such as payment of excessive security deposits in an arrangement, disproportionate penalty for a breach, and unilateral termination without cause. The consumer courts being set up under the Bill will determine contract terms to be unfair and declare them null and void.

What are the different bodies being set up under the Bill?

The Bill sets up Consumer Protection Councils as advisory bodies, who will advise on protection and promotion of consumer rights. However, it does not make it clear who these Councils will render advise to. Under the 1986 Act, the Consumer Protection Councils have the responsibility to protect and promote consumer rights.

To promote, protect, and enforce consumer rights, the Bill is setting up a regulatory body, known as the Central Consumer Protection Authority. This Authority can also pass orders to prevent unfair and restrictive trade practices, such as selling goods not complying with standards, and impose penalties for false and misleading advertisements.

The Bill also sets up the Consumer Disputes Redressal Commissions (known as consumer courts) at the district, state and national levels. These Commissions will adjudicate a broad range of complaints, including complaints on defective goods and deficient services of varying values. These Commissions are also present under the 1986 Act. However, their pecuniary jurisdiction (amount up to which they can hear complaints) has been revised under the Bill. The Bill also adds a provision for alternate dispute redressal mechanism. As part of this, mediation cells will be attached with the Consumer Disputes Redressal Commissions.

What are the penal provisions under the Bill?

The Bill increases penalties for different offences specified in it. It also adds penalties for offences such as issuing misleading advertisements, and manufacturing and selling adulterated or spurious goods. For example, in case of false and misleading advertisements, the Central Consumer Protection Authority can impose a penalty of up to Rs 10 lakh on a manufacturer or an endorser. For a subsequent offence, the fine may extend to Rs 50 lakh.  The manufacturer can also be punished with imprisonment of up to two years, which may extend to five years for every subsequent offence. The Authority can also prohibit the endorser of a misleading advertisement from endorsing any particular product or service for a period of up to one year.  For every subsequent offence, the period of prohibition may extend to three years.  There are certain exceptions when an endorser will not be held liable for such a penalty.

Are there any issues to think about in the Bill?

The 2018 Bill is a marked improvement over the 2015 Bill and addresses several issues in the 2015 Bill. However, two major issues with regard to the Consumer Disputes Redressal Commissions remain. We discuss them below.

First issue is with regard to the composition of these Commissions. The Bill specifies that the Commissions will be headed by a ‘President’ and will comprise other members.  However, the Bill delegates the power of deciding the qualifications of the President and members to the central government.  It also does not specify that the President or members should have minimum judicial qualifications.  This is in contrast with the existing Consumer Protection Act, 1986, which states that the Commissions at various levels will be headed by a person qualified to be a judge.  The 1986 Act also specifies the minimum qualification of members.

Under the current Bill, if the Commissions were to have only non-judicial members, it may violate the principle of separation of powers between the executive and the judiciary.  Since these Commissions are adjudicating bodies and will look at consumer dispute cases, it is unclear how a Commission that may comprise only non-judicial members will undertake this function.

Second issue is with regard to the method of appointment of members of the Commissions. The Bill permits the central government to notify the method of appointment of members of the Commissions.  It does not require that the selection involve members from the higher judiciary.  It may be argued that allowing the executive to determine the appointment of the members of Commissions could affect the independent functioning of the Commissions.  This provision is also at variance with the 1986 Act.  Under the Act, appointment of members to these Commissions is done through a selection committee.  These section committees comprise a judicial member.

As mentioned previously, the Commissions are intended to be quasi-judicial bodies, while the government is part of the executive.  There may be instances where the government is a party to a dispute relating to deficiency in service provided by a government enterprise, for e.g., the Railways.  In such a case, there would be a conflict of interest as the government would be a party to the dispute before the Commissions and will also have the power to appoint members to the Commission.

Recently, the central government launched the Pradhan Mantri Sahaj Bijli Har Ghar Yojana (or Saubhagya).[i],[ii]  The scheme seeks to ensure universal household electrification (in both rural and urban areas) by providing last mile connectivity.  The scheme is expected to cover three crore households.  Note that currently about four crore households are un-electrified.  A rural electrification scheme has also been under implementation since 2005.  In light of this, we discuss the current situation of, and key issues related to rural electrification in the country.

Regulatory and policy framework

Under the Electricity Act, 2003, the central and state governments have the joint responsibility of providing electricity to rural areas.  The 2003 Act also mandates that the central government should, in consultation with the state governments, provide for a national policy on (i) stand-alone power systems for rural areas (systems that are not connected to the electricity grid), and (ii) electrification and local distribution in rural areas.  Consequently, the Rural Electrification Policy was notified in August 2006.[iii]

The Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY), launched in 2005, was the first scheme on rural electrification.  In December 2014, Ministry of Power launched the Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY), which subsumed the RGGVY.[iv]  Components of DDUGJY include: (i) separation of agricultural and non-agricultural electricity feeders to improve supply for consumers in rural areas, (ii) improving sub-transmission and distribution infrastructure in rural areas, and (iii) rural electrification by carrying forward targets specified under the RGGVY.

The total financial outlay for DDUGJY over the implementation period (until 2021-22) is Rs 82,300 crore which includes budgetary support of Rs 68,900 crore.  The central government provides 60% of the project cost as grant, the state power distribution companies (discoms) raise 10% of the funds, and 30% is borrowed from financial institutions and banks.

Status of rural electrification

As of August 2017, about 1% of the villages in India remain un-electrified (3,146 villages).  However, with regard to households, around 23% (4.1 crore households) are yet to be electrified.  Table 1 at the end of this post shows the status of rural electrification across all states.

Issues with rural electrification

Definition of an electrified village

An electrified village is defined as one that has the following: (i) provision of basic infrastructure such as distribution transformers and lines in the inhabited locality, (ii) provision of electricity in public places like schools, panchayat office, health centers, dispensaries, and community centers, and (iii) at least 10% of the total number of households in the village are electrified.[iv]

Therefore, a village is considered to be electrified if 10% of the total number of households in the village have been electrified.  This is apart from the basic infrastructure and electrification of certain public centers in the village.  The Standing Committee on Energy (2013) had observed that according to this definition, a village would be called electrified even if up to 90% of households in it do not have an electricity connection.[v]  It also noted that the infrastructure being provided under the scheme is highly inadequate, unreliable and unsustainable.  The Committee recommended that the actual electrification requirement of villages must be assessed, and it should be ensured that the state discoms provide electricity to the remaining households in the village.

Supply of electricity

The Standing Committee had also noted that while the rural electrification scheme looks at creating infrastructure, the actual supply of electricity to households rests with the state discoms.[v]  These discoms are already facing huge financial losses and hence are unable to supply electricity to the villages.  Discoms continue to supply subsidised power to agricultural and residential consumers, resulting in revenue losses.  Further, the average technical and commercial losses (theft and pilferage of electricity) (AT&C losses) are at around 25%.  While the Ujjwal Discom Assurance Yojana (UDAY) has eased off some of the financial losses of the discoms, it remains to be seen whether discoms are able to reduce the cost-tariff gap and AT&C losses in the future.

It has been recommended that generation capacity should be augmented so that states can meet the additional demand under the rural electrification schemes. Further, the assistance to financially weaker states should be increased so that they can better implement the scheme.[v]

Electricity to below poverty line (BPL) households

Under the rural electrification scheme, the cost for providing free electricity connection per BPL household is Rs 3,000.  It has been observed that this cost per household may be inadequate.[v]  Due to the low cost, the quantity and the quality of work has been getting compromised leading to poor implementation of the scheme.  It has been recommended that the Ministry should revisit the cost provided under the scheme.[v]

The new electrification scheme: Pradhan Mantri Sahaj Bijli Har Ghar Yojana (or Saubhagya)

The new scheme, Saubhagya, seeks to ensure universal household electrification, that is, in both rural and urban areas.  Under Saubhagya, beneficiaries will be identified using the Socio Economic and Caste Census (SECC) 2011 data.  The identified poor households will get free electricity connections.  Other households not covered under the SECC, will be provided electricity connections at a cost of Rs 500.  This amount will be collected by the electricity distribution companies in 10 instalments.

The total outlay of the scheme will be Rs 16,320 crore, of which the central government will provide Rs 12,320 crore.  The outlay for the rural households will be Rs 14,025 crore, of which the centre will provide Rs 10,588 crore.  For urban households the outlay will be Rs 2,295 crore of which the centre will provide Rs. 1,733 crore.

The state discoms will execute the electrification works through contractors or other suitable agencies.  Information technology (mobile apps, web portals) will be used to organise camps in villages to identify beneficiaries.  In order to accelerate the process, applications for electricity connections will be completed on the spot.

So far the focus of electrification schemes has been on rural areas, where typically last mile connectivity has been difficult to provide.  Saubhagya extends the ambit of electrification projects to urban areas as well.  While DDUGJY has focused on the village as the principal unit to measure electrification, the new scheme shifts the targets to household electrification.  While the target for ensuring electricity connection in each household will be a significant step towards ensuring 24×7 power, the question of continuous and quality supply to these households will still rest on the ability of the discoms to provide electricity.  Further, while the scheme provides for free connections, the ability of these households to pay for the electricity they consume may be a concern.

Table 1: Status of rural electrification across states (as of August 2017)

Fig 1 edit

* all villages in Telangana were declared electrified before the bifurcation of the state.
Sources:  Ministry of Power; PRS.

 

[i] “PM launches Pradhan Mantri Sahaj Bijli Har Ghar Yojana “Saubhagya””, Press Information Bureau, Ministry of Power, September 25, 2017.

[ii] “FAQs on Pradhan Mantri Sahaj Bijli Har Ghar Yojana “Saubhagya””, Press Information Bureau, Ministry of Power, September 27, 2017.

[iii].  Rural Electrification Policy, Ministry of Power, August 23, 2006, http://powermin.nic.in/sites/default/files/uploads/RE%20Policy_1.pdf.

[iv].  “Office memorandum: Deendayal Upadhyaya Gram Jyoti Yojana”, Ministry of Power, December 3, 2014, http://powermin.nic.in/rural_electrification/pdf/Deendayal_Upadhyaya_Gram_Jyoti_Yojana.pdf.

[v].  “41st Report: Implementation of Rajiv Gandhi Grameen Vidyutikaran Yojana”, Standing Committee on Energy, December 13, 2013, http://164.100.47.134/lsscommittee/Energy/15_Energy_41.pdf.