The issue of Non-Performing Assets (NPAs) in the Indian banking sector has become the subject of much discussion and scrutiny. The Standing Committee on Finance recently released a report on the banking sector in India, where it observed that banks’ capacity to lend has been severely affected because of mounting NPAs. The Estimates Committee of Lok Sabha is also currently examining the performance of public sector banks with respect to their burgeoning problem of NPAs, and loan recovery mechanisms available.

Additionally, guidelines for banks released by the Reserve Bank of India (RBI) in February 2018 regarding timely resolution of stressed assets have come under scrutiny, with multiple cases being filed in courts against the same. In this context, we examine the recent rise of NPAs in the country, some of their underlying causes, and steps taken so far to address the issue.

What is the extent and effect of the NPA problem in India?

Banks give loans and advances to borrowers. Based on the performance of the loan, it may be categorized as: (i) a standard asset (a loan where the borrower is making regular repayments), or (ii) a non-performing asset. NPAs are loans and advances where the borrower has stopped making interest or principal repayments for over 90 days.

As of March 31, 2018, provisional estimates suggest that the total volume of gross NPAs in the economy stands at Rs 10.35 lakh crore. About 85% of these NPAs are from loans and advances of public sector banks. For instance, NPAs in the State Bank of India are worth Rs 2.23 lakh crore.

In the last few years, gross NPAs of banks (as a percentage of total loans) have increased from 2.3% of total loans in 2008 to 9.3% in 2017 (Figure 1). This indicates that an increasing proportion of a bank’s assets have ceased to generate income for the bank, lowering the bank’s profitability and its ability to grant further credit.

Escalating NPAs require a bank to make higher provisions for losses in their books. The banks set aside more funds to pay for anticipated future losses; and this, along with several structural issues, leads to low profitability. Profitability of a bank is measured by its Return on Assets (RoA), which is the ratio of the bank’s net profits to its net assets. Banks have witnessed a decline in their profitability in the last few years (Figure 2), making them vulnerable to adverse economic shocks and consequently putting consumer deposits at risk.

Capture

What led to the rise in NPAs?

Some of the factors leading to the increased occurrence of NPAs are external, such as decreases in global commodity prices leading to slower exports. Some are more intrinsic to the Indian banking sector.

A lot of the loans currently classified as NPAs originated in the mid-2000s, at a time when the economy was booming and business outlook was very positive. Large corporations were granted loans for projects based on extrapolation of their recent growth and performance. With loans being available more easily than before, corporations grew highly leveraged, implying that most financing was through external borrowings rather than internal promoter equity. But as economic growth stagnated following the global financial crisis of 2008, the repayment capability of these corporations decreased. This contributed to what is now known as India’s Twin Balance Sheet problem, where both the banking sector (that gives loans) and the corporate sector (that takes and has to repay these loans) have come under financial stress.

When the project for which the loan was taken started underperforming, borrowers lost their capability of paying back the bank. The banks at this time took to the practice of ‘evergreening’, where fresh loans were given to some promoters to enable them to pay off their interest. This effectively pushed the recognition of these loans as non-performing to a later date, but did not address the root causes of their unprofitability.

Further, recently there have also been frauds of high magnitude that have contributed to rising NPAs. Although the size of frauds relative to the total volume of NPAs is relatively small, these frauds have been increasing, and there have been no instances of high profile fraudsters being penalised.

What is being done to address the problem of growing NPAs?

The measures taken to resolve and prevent NPAs can broadly be classified into two kinds – first, regulatory means of resolving NPAs per various laws (like the Insolvency and Bankruptcy Code), and second, remedial measures for banks prescribed and regulated by the RBI for internal restructuring of stressed assets.

The Insolvency and Bankruptcy Code (IBC) was enacted in May 2016 to provide a time-bound 180-day recovery process for insolvent accounts (where the borrowers are unable to pay their dues). Under the IBC, the creditors of these insolvent accounts, presided over by an insolvency professional, decide whether to restructure the loan, or to sell the defaulter’s assets to recover the outstanding amount. If a timely decision is not arrived at, the defaulter’s assets are liquidated. Proceedings under the IBC are adjudicated by the Debt Recovery Tribunal for personal insolvencies, and the National Company Law Tribunal (NCLT) for corporate insolvencies. 701 cases have been registered and 176 cases have been resolved as of March 2018 under the IBC.

What changed recently in the RBI’s guidelines to banks?

Over the years, the RBI has issued various guidelines aimed at the resolution of stressed assets of banks. These included introduction of certain schemes such as: (i) Strategic Debt Restructuring (which allowed banks to change the management of the defaulting company), and (ii) Joint Lenders’ Forum (where lenders evolved a resolution plan and voted on its implementation). In line with the enactment of the IBC, the RBI, through a circular in February 2018, substituted all the specific pre-existing guidelines with a simplified, generic, time-bound framework for the resolution of stressed assets.

In the revised framework which replaced the earlier schemes, the RBI put in place a strict deadline of 180 days during which a resolution plan must be implemented, failing which stressed assets must be referred to the NCLT under IBC within 15 days. The framework also introduced a provision for monitoring of one-day defaults, where incipient stress is identified and flagged immediately when repayments are overdue by a day.

Borrowers whose loans were tagged as NPAs before the release of the circular recently crossed the 180-day deadline for internal resolution by banks. Some of these borrowers, including various power producers and sugar mills, had appealed against the RBI guidelines in various High Courts. A two-judge bench of the Allahabad High Court had recently ruled in favour of the RBI’s powers to issue these guidelines, and refused to grant interim relief to power producers from being taken to the NCLT for bankruptcy. All lawsuits against the circular have currently been transferred to the Supreme Court, which has now issued an order to maintain status quo on the same. This means that these cases cannot be referred to the NCLT until the Supreme Court’s decision on the circular, although the RBI’s 180-day deadline has passed. This effectively provides interim relief to the errant borrowers who had moved to court till the next hearing of the apex court on this matter, which is scheduled for November 2018.

On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary.  It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019.  The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management.  In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.

Nation-wide sanitation programmes in past

According to the Census, the rural sanitation coverage in India was only 1% in 1981.  

The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas.  Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC).  While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.

By 2001, only 22% of the rural families had access to toilets.  It increased further to 32.7% by 2011.  In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).

In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation.  In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets.  Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations.  In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.

On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively.  While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs.  In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.

Swachh Bharat Mission – Gramin (SBM-Gramin)

The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live.  Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).

Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22


Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.  Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation. 
Sources: Union Budgets 2014-15 to 2021-22; PRS.

The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years.  Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%.  However, every year since 2018-19, there has been some under-utilisation of the allocated amount. 

As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2).  However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”.  The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.

Figure 2: Toilet coverage for rural households


Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.

The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line.  It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.

In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore.  ODF Plus includes sustaining the ODF status, and solid and liquid waste management.  Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.

Swachh Bharat Mission – Urban (SBM-Urban)

SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country.  One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019.  However, this target was then lowered to 59 lakh IHHLS by 2019.  This target was achieved by 2020 (see Table 1).

Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)

Targets

Original Target

Revised Target  
(revised in 2019)

Actual Constructed

Individual Household Latrines

66,42,000

58,99,637

62,60,606

Community and Public Toilets

5,08,000

5,07,587

6,15,864

Sources: Swachh Bharat Mission Urban - Dashboard; PRS.

Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)

Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. 
Sources: Union Budget 2014-15 to 2021-22; PRS.

The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance.  Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene.  Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme. 

The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing.  The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21.  In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).

Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)

Targets

Target

Progress
as of March 2020

Progress
as of December 2020

Door to Door Waste Collection (Wards)

86,284

81,535 (96%)

83,435 (97%)

Source Segregation (Wards)

86,284

64,730 (75%)

67,367 (78%)

Waste Processing (in %)

100%

65%

68%

Sources: Standing Committee on Urban Development (2021); PRS.

In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched.  Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites.  On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.