Recently, there have been reports of price crashes and distress sales in case of farm produce, such as tomatoesmangoes, and garlic.  In some cases, farmers have dumped their produce on roads.  Produce such as fruits and vegetables are perishable and therefore have a short shelf life.  Further, due to inadequate storage facilities and poor food processing infrastructure farmers have limited options but to sell the produce at prevailing market prices.  This can lead to distress sales or roadside discards (in some cases to avoid additional cost of transportation).

Food processing allows raw food to be stored, marketed, or preserved for consumption later.  For instance, raw agricultural produce such as fruits may be processed into juices, jams, and pickles.  Activities such as waxing (for preservation), packaging, labelling, or ripening of produce also form part of the food processing industry.

Between 2001-02 and 2016-17, production of food grains grew annually at 1.7% on average.  Production of horticulture crops surpassed food grains with an average growth rate of 4.8%.  While production has been increasing over the years, surplus produce tends to go waste at various stages such as procurement, storage, and processing due to lack of infrastructure such as cold storages and food processing units.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Losses high among perishables such as fruits and vegetables

Crop losses ranged between 7-16% among fruits and around 5% among cereals in 2015.  The highest losses were witnessed in case of guava, followed by mango, which are perishable fruits.  Perishables such as fruits and vegetables are more prone to losses as compared to cereals.  Such crop losses can occur during operations such as harvesting, thrashing, grading, drying, packaging, transportation, and storage depending upon the commodity.

It was estimated that the annual value of harvest and post-harvest losses of major agricultural products at the national level was Rs 92,651 crore in 2015.  The Standing Committee on Agriculture (2017) stated that such wastage can be reduced with adequate food processing facilities.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Inadequate food processing infrastructure

As previously discussed, perishables such as fruits and vegetables are more prone to damages as compared to cereals.  Due to inadequate processing facilities in close proximity, farmers may be unable to hold their produce for a long time.  Hence, they may be forced to sell their produce soon after harvest, irrespective of the prevailing market situations.  Expert committees have recommended that agri-logistics such as cold chain infrastructure and market linkages should be strengthened.

Cold chain infrastructure: Cold chain infrastructure includes processing units, cold storages, and refrigerated vans.  As of 2014, out of a required cold storage capacity of 35 million metric tonnes (MT), almost 90% (31.8 million MT) of the capacity was available (see Table 1).  However, cold storage needs to be coupled with logistical support to facilitate smooth transfer of harvested value from farms to distant locations.  This includes: (i) pack-houses for packaging and preparing fresh produce for long distance transport, (ii) refrigerated transport such as reefer vehicles, and (iii) ripening chambers to ripen raw produce before marketing.  For instance, bananas which are harvested raw may be ripened in these chambers before being marketed.

While there are sufficient cold storages, there are wide gaps in the availability of other associated infrastructure.  This implies that even though almost 90% (32 million tonnes) of cold storage capacity is available, only 15% of the required refrigerated transport exists.  Further, the shortfall in the availability of infrastructure necessary for safe handling of farm produce, like pack-houses and ripening chambers, is over 90%.

Table 1:  Gaps in cold chain infrastructure (2014)

Facility Required Available Gap % gap
Cold storage
(in million MT)

35.1

31.8 3.2

9.3%

Pack-houses

70,080

249 69,831

99.6%

Reefer vehicles

61,826

9,000 52,826

85.4%

Ripening chambers

9,131

812 8,319

91.1%

Source: Standing Committee on Agriculture 2018; PRS.

To minimise post-harvest losses, the Standing Committee (2017) recommended that a country-wide integrated cold chain infrastructure network at block and district levels should be created.  It further recommended that a Cold Chain Coordination and Monitoring Committee should be constituted at the district-level.  The Standing Committee also recommended that farmers need to be trained in value addition activities such as sorting, grading, and pre-cooling harvested produce through facilities such as freezers and ripening chambers.

Between 2008 and 2017, 238 cold chain projects were sanctioned under the Scheme for Integrated Cold Chain and Value Addition Infrastructure.  Grants worth Rs 1,775 crore were approved for these projects.  Of this amount, Rs 964 crore (54%) has been released as of January 2018.  Consequently, out of the total projects sanctioned, 114 (48%) are completed.  The remaining 124 projects are currently under implementation.

Transport Facilities:  Currently, majority of food grains and certain quantities of tea, potato, and onion are transported through railways.  The Committee on Doubling Farmers Income had recommended that railways needs to upgrade its logistics to facilitate the transport of fresh produce directly to export hubs.  This includes creation of adjoining facilities for loading and unloading, and distribution to road transport.

Mega Food Parks: The Mega Food Parks scheme was launched in 2008.  It seeks to facilitate setting up of food processing units.  These units are to be located at a central processing centre with infrastructure required for processing, packaging, quality control labs, and trade facilitation centres.

As of March 2018, out of the 42 projects approved, 10 were operational.  The Standing Committee on Agriculture noted certain reasons for delay in implementation of projects under the scheme.  These include: (i) difficulty in getting loans from banks for the project, (ii) delay in obtaining clearances from the state governments and agencies for roads, power, and water at the project site, (iii) lack of special incentives for setting up food processing units in Mega Food Parks, and (iv) unwillingness of the co-promoters in contributing their share of equity.

Further, the Standing Committee stated that as the scheme requires a minimum area of 50 acres, it does not to promote smaller or individual food processing and preservation units.  It recommended that smaller agro-processing clusters near production areas must be promoted.  The Committee on Doubling Farmers Income recommended establishment of processing and value addition units at strategic places.  This includes rural or production areas for pulses, millets, fruits, vegetables, dairy, fisheries, and poultry in public private-partnership mode.

Recently, there have been instances of certain collective investment schemes (CISs) attempting to circumvent regulatory oversight.  In addition, some market participants have not complied with Securities and Exchange Board of India's (SEBI) orders of payment of penalty and refund to investors. In August, the Securities Laws (Amendment) Bill, 2013 was introduced in the Lok Sabha to amend the Securities and Exchange Board of India Act, 1992 (the SEBI Act, 1992), the Securities Contract (Regulation) Act, 1956 (SCRA, 1956) and the Depositories Act, 1996. The Bill replaced the Securities Laws (Amendments) Ordinance, 2013. The Bill makes the following key amendments: a) Definition of Collective Investment Schemes The SEBI Act, 1992 defines CISs as schemes in which the funds of investors are pooled, yield profits or income and are managed on behalf of investors.  It also exempts certain types of investments which are regulated by other authorities. The Bill introduces a proviso to the definition of CIS.  This proviso deems any scheme or arrangement to be a CIS if it meets all three of the following conditions: (a) funds are pooled, (b) it is not registered with SEBI, or it is not exempted by SEBI Act, 1992, and (c) it has a corpus of Rs 100 crore or more.  These provisions could potentially lead to some schemes not conventionally defined as CIS to fall under the definition. For instance, partnership firms operating in the investment business or real estate developers accepting customer advances could be termed as CISs. SEBI has been given the power to specify conditions under which any scheme or arrangement can be defined as a CIS. This raises the question of whether this is excessive delegation of legislative powers - usually the parent act defines the entities to be regulated and the details are entrusted to the regulator. b) Disgorgement (repayment) of unfair gains/ averted losses SEBI has in the past issued orders directing market participants to refund i) profits made or ii) losses averted, through unfair actions.  The Bill deems SEBI to have always had the power to direct a market participant to disgorge unfair gains made/losses averted, without approaching a court.  This power to order disgorgement without approaching a court is in contrast with the provisions of the recently passed Companies Bill, 2011 and the draft Indian Financial Code (IFC) which require an order from a court/tribunal for disgorgement of unfair gains. Further, the Bill specifies that the disgorged amount shall be credited to the Investor Education and Protection Fund (IEPF), and shall be used in accordance with SEBI regulations.  The Bill does not explicitly provide the first right on the disgorged funds to those who suffered wrongful losses due to the unfair actions, unlike the draft IFC. c) Investigation and prosecution The Bill empowers the SEBI chairman to authorise search and seizure operations on a suspect’s premises.  This does away with the current requirement of permission from a Judicial Magistrate.  This provision removes the usual safeguards regarding search and seizure as seen in the Code of Criminal Procedure, 1973, the recently passed Companies Bill, 2011 and the draft Indian Financial Code. The Bill also empowers an authorised SEBI officer to, without approaching a court, attach a person’s bank accounts and property and even arrest and detain the person in prison for non-compliance of a disgorgement order or penalty order.  Most regulators and authorities, with the exception of the Department of Income Tax, do not have powers to such an extent. d) Other Provisions of the Bill The Bill retrospectively validates consent guidelines issued by SEBI in 2007 under which SEBI can settle non-criminal cases through consent orders, i.e., parties can make out-of-court settlements through payment of fine/compensation.  The United States Securities and Exchange Commission settles over 90% of non-criminal cases by consent orders. The Bill retrospectively validates the exchange of information between SEBI and foreign securities regulators through MoUs. The Bill sets up special courts to try cases relating to offences under the SEBI Act, 1992. For a PRS summary of the Bill, here.