Recently, there have been reports of price crashes and distress sales in case of farm produce, such as tomatoesmangoes, and garlic.  In some cases, farmers have dumped their produce on roads.  Produce such as fruits and vegetables are perishable and therefore have a short shelf life.  Further, due to inadequate storage facilities and poor food processing infrastructure farmers have limited options but to sell the produce at prevailing market prices.  This can lead to distress sales or roadside discards (in some cases to avoid additional cost of transportation).

Food processing allows raw food to be stored, marketed, or preserved for consumption later.  For instance, raw agricultural produce such as fruits may be processed into juices, jams, and pickles.  Activities such as waxing (for preservation), packaging, labelling, or ripening of produce also form part of the food processing industry.

Between 2001-02 and 2016-17, production of food grains grew annually at 1.7% on average.  Production of horticulture crops surpassed food grains with an average growth rate of 4.8%.  While production has been increasing over the years, surplus produce tends to go waste at various stages such as procurement, storage, and processing due to lack of infrastructure such as cold storages and food processing units.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Losses high among perishables such as fruits and vegetables

Crop losses ranged between 7-16% among fruits and around 5% among cereals in 2015.  The highest losses were witnessed in case of guava, followed by mango, which are perishable fruits.  Perishables such as fruits and vegetables are more prone to losses as compared to cereals.  Such crop losses can occur during operations such as harvesting, thrashing, grading, drying, packaging, transportation, and storage depending upon the commodity.

It was estimated that the annual value of harvest and post-harvest losses of major agricultural products at the national level was Rs 92,651 crore in 2015.  The Standing Committee on Agriculture (2017) stated that such wastage can be reduced with adequate food processing facilities.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Inadequate food processing infrastructure

As previously discussed, perishables such as fruits and vegetables are more prone to damages as compared to cereals.  Due to inadequate processing facilities in close proximity, farmers may be unable to hold their produce for a long time.  Hence, they may be forced to sell their produce soon after harvest, irrespective of the prevailing market situations.  Expert committees have recommended that agri-logistics such as cold chain infrastructure and market linkages should be strengthened.

Cold chain infrastructure: Cold chain infrastructure includes processing units, cold storages, and refrigerated vans.  As of 2014, out of a required cold storage capacity of 35 million metric tonnes (MT), almost 90% (31.8 million MT) of the capacity was available (see Table 1).  However, cold storage needs to be coupled with logistical support to facilitate smooth transfer of harvested value from farms to distant locations.  This includes: (i) pack-houses for packaging and preparing fresh produce for long distance transport, (ii) refrigerated transport such as reefer vehicles, and (iii) ripening chambers to ripen raw produce before marketing.  For instance, bananas which are harvested raw may be ripened in these chambers before being marketed.

While there are sufficient cold storages, there are wide gaps in the availability of other associated infrastructure.  This implies that even though almost 90% (32 million tonnes) of cold storage capacity is available, only 15% of the required refrigerated transport exists.  Further, the shortfall in the availability of infrastructure necessary for safe handling of farm produce, like pack-houses and ripening chambers, is over 90%.

Table 1:  Gaps in cold chain infrastructure (2014)

Facility Required Available Gap % gap
Cold storage
(in million MT)

35.1

31.8 3.2

9.3%

Pack-houses

70,080

249 69,831

99.6%

Reefer vehicles

61,826

9,000 52,826

85.4%

Ripening chambers

9,131

812 8,319

91.1%

Source: Standing Committee on Agriculture 2018; PRS.

To minimise post-harvest losses, the Standing Committee (2017) recommended that a country-wide integrated cold chain infrastructure network at block and district levels should be created.  It further recommended that a Cold Chain Coordination and Monitoring Committee should be constituted at the district-level.  The Standing Committee also recommended that farmers need to be trained in value addition activities such as sorting, grading, and pre-cooling harvested produce through facilities such as freezers and ripening chambers.

Between 2008 and 2017, 238 cold chain projects were sanctioned under the Scheme for Integrated Cold Chain and Value Addition Infrastructure.  Grants worth Rs 1,775 crore were approved for these projects.  Of this amount, Rs 964 crore (54%) has been released as of January 2018.  Consequently, out of the total projects sanctioned, 114 (48%) are completed.  The remaining 124 projects are currently under implementation.

Transport Facilities:  Currently, majority of food grains and certain quantities of tea, potato, and onion are transported through railways.  The Committee on Doubling Farmers Income had recommended that railways needs to upgrade its logistics to facilitate the transport of fresh produce directly to export hubs.  This includes creation of adjoining facilities for loading and unloading, and distribution to road transport.

Mega Food Parks: The Mega Food Parks scheme was launched in 2008.  It seeks to facilitate setting up of food processing units.  These units are to be located at a central processing centre with infrastructure required for processing, packaging, quality control labs, and trade facilitation centres.

As of March 2018, out of the 42 projects approved, 10 were operational.  The Standing Committee on Agriculture noted certain reasons for delay in implementation of projects under the scheme.  These include: (i) difficulty in getting loans from banks for the project, (ii) delay in obtaining clearances from the state governments and agencies for roads, power, and water at the project site, (iii) lack of special incentives for setting up food processing units in Mega Food Parks, and (iv) unwillingness of the co-promoters in contributing their share of equity.

Further, the Standing Committee stated that as the scheme requires a minimum area of 50 acres, it does not to promote smaller or individual food processing and preservation units.  It recommended that smaller agro-processing clusters near production areas must be promoted.  The Committee on Doubling Farmers Income recommended establishment of processing and value addition units at strategic places.  This includes rural or production areas for pulses, millets, fruits, vegetables, dairy, fisheries, and poultry in public private-partnership mode.

In an Indian express editorial, Mandira Kala discusses the Bills, addressing corruption and good governance, pending in Parliament.  She discusses what their fate may be given that the Monsoon session is widely being viewed as a make or break session  for the government to get its legislative agenda through Parliament. The monsoon session of Parliament started on a stormy note last week. Question hour was disrupted on most days and only one government bill was passed. There are 11 days left in the session and more than 40 bills pending for parliamentary approval. With the 15th Lok Sabha drawing to an end, this session is being viewed as a "make or break" session for the government to get its legislative agenda through Parliament. Since 2010, there has been much debate in Parliament on corruption and an important part of the government's legislative agenda was the introduction of nine bills in the Lok Sabha to address corruption and improve governance through effective delivery of public services. Three of these bills have been passed by the Lok Sabha and are currently pending before the Rajya Sabha. These include legislation to address corruption in public office, enforce standards and accountability in the judiciary, and protect whistleblowers. The government has proposed amendments to each of these bills that the Rajya Sabha will have to consider and pass. If the Rajya Sabha passes these bills with amendments, they will be sent back to the Lok Sabha for approval. It is difficult to assess in what timeframe these bills will become law, given that both Houses need to agree on the amendments. The Lokpal and Lokayuktas Bill creates a process for receiving and investigating corruption complaints against public officials, including the Prime Minister, Ministers and Members of Parliament, and prosecuting these in a timebound manner. The government amendments include allowing states the flexibility to determine their respective Lokayuktas and giving the Lokpal power of superintendence over the CBI, if the case has been referred by him. A mechanism to protect whistleblowers and create a process for receiving and investigating complaints of corruption or wilful misuse of discretion against a public servant are proposed under the Whistleblowers' Protection Bill, 2010. The amendments proposed by the government prohibit whistleblowing if the disclosure of information affects the sovereignty of the country and its strategic, scientific and economic interest. The Judicial Standards and Accountability Bill requires judges to declare their assets, lays down judicial standards and establishes processes for the removal of judges of the Supreme Court and high courts. The bill is not listed in the government's legislative agenda for the monsoon session and media reports suggest that the government intends to make amendments to it. In the arena of strengthening governance and effective delivery of public services, there are three bills currently pending in Parliament. The Citizens' Charter Bill confers the right to timebound delivery of goods and services on every citizen and creates a mechanism for redressing complaints on such matters. The Electronic Delivery of Services Bill mandates that Central and state governments shall deliver public services electronically no later than eight years from the enactment of the law. The parliamentary standing committee had highlighted that the Citizens' Charter Bill and Electronic Delivery of Services Bill have an inherent overlap, which the government would have to resolve. While the former is listed for passing in this session, the government plans to withdraw the latter and replace it with a new bill. This new bill is not part of the list that is up for consideration and passing this session. To create a reliable method of identifying individuals to facilitate their access to benefits and services the National Identification Authority of India Bill was introduced in Parliament to provide unique identification numbers ("aadhaar") to residents of India. This bill has not been listed for parliamentary approval during this session. Two other pending bills do not find place in the government's legislative agenda for the session either. These include legislation that curbs the holding and transfer of benami property and regulates the procurement process in government departments to ensure transparency, accountability and probity. The Prevention of Bribery of Foreign Public Officials Bill, which imposes penalties on Indian companies and individuals who bribe officials of a foreign government or international agency, is listed for passing this session. Each of these nine bills were introduced in the Lok Sabha. If they are not passed by both Houses before the 15th Lok Sabha is dissolved in 2014, no matter where they are in the legislative process, the bills will lapse. This implies that the entire legislative process will have to start all over again, if and when there is political will to legislate on these issues in the 16th Lok Sabha. The challenges in getting legislation passed by Parliament are many, given that its overall productive time, especially time spent on legislation, is decreasing. Typically, Parliament spends about 25 per cent of its time debating legislation, but in the past few years this average has declined to 15 per cent. While the time lost by the House due to frequent adjournments is difficult to make up, parliamentarians will have to cautious about passing bills without the rigours of parliamentary debate. It is uncertain what the trajectory of the anti-corruption legislation in Parliament will be — enacted as law or resigned to a pool of lapsed legislation.