Applications for LAMP Fellowship 2025-26 are now open. Apply here. The last date for submitting applications is December 21, 2024
Recently, there have been reports of price crashes and distress sales in case of farm produce, such as tomatoes, mangoes, and garlic. In some cases, farmers have dumped their produce on roads. Produce such as fruits and vegetables are perishable and therefore have a short shelf life. Further, due to inadequate storage facilities and poor food processing infrastructure farmers have limited options but to sell the produce at prevailing market prices. This can lead to distress sales or roadside discards (in some cases to avoid additional cost of transportation).
Food processing allows raw food to be stored, marketed, or preserved for consumption later. For instance, raw agricultural produce such as fruits may be processed into juices, jams, and pickles. Activities such as waxing (for preservation), packaging, labelling, or ripening of produce also form part of the food processing industry.
Between 2001-02 and 2016-17, production of food grains grew annually at 1.7% on average. Production of horticulture crops surpassed food grains with an average growth rate of 4.8%. While production has been increasing over the years, surplus produce tends to go waste at various stages such as procurement, storage, and processing due to lack of infrastructure such as cold storages and food processing units.
Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.
Losses high among perishables such as fruits and vegetables
Crop losses ranged between 7-16% among fruits and around 5% among cereals in 2015. The highest losses were witnessed in case of guava, followed by mango, which are perishable fruits. Perishables such as fruits and vegetables are more prone to losses as compared to cereals. Such crop losses can occur during operations such as harvesting, thrashing, grading, drying, packaging, transportation, and storage depending upon the commodity.
It was estimated that the annual value of harvest and post-harvest losses of major agricultural products at the national level was Rs 92,651 crore in 2015. The Standing Committee on Agriculture (2017) stated that such wastage can be reduced with adequate food processing facilities.
Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.
Inadequate food processing infrastructure
As previously discussed, perishables such as fruits and vegetables are more prone to damages as compared to cereals. Due to inadequate processing facilities in close proximity, farmers may be unable to hold their produce for a long time. Hence, they may be forced to sell their produce soon after harvest, irrespective of the prevailing market situations. Expert committees have recommended that agri-logistics such as cold chain infrastructure and market linkages should be strengthened.
Cold chain infrastructure: Cold chain infrastructure includes processing units, cold storages, and refrigerated vans. As of 2014, out of a required cold storage capacity of 35 million metric tonnes (MT), almost 90% (31.8 million MT) of the capacity was available (see Table 1). However, cold storage needs to be coupled with logistical support to facilitate smooth transfer of harvested value from farms to distant locations. This includes: (i) pack-houses for packaging and preparing fresh produce for long distance transport, (ii) refrigerated transport such as reefer vehicles, and (iii) ripening chambers to ripen raw produce before marketing. For instance, bananas which are harvested raw may be ripened in these chambers before being marketed.
While there are sufficient cold storages, there are wide gaps in the availability of other associated infrastructure. This implies that even though almost 90% (32 million tonnes) of cold storage capacity is available, only 15% of the required refrigerated transport exists. Further, the shortfall in the availability of infrastructure necessary for safe handling of farm produce, like pack-houses and ripening chambers, is over 90%.
Table 1: Gaps in cold chain infrastructure (2014)
Facility | Required | Available | Gap | % gap |
Cold storage (in million MT) |
35.1 |
31.8 | 3.2 |
9.3% |
Pack-houses |
70,080 |
249 | 69,831 |
99.6% |
Reefer vehicles |
61,826 |
9,000 | 52,826 |
85.4% |
Ripening chambers |
9,131 |
812 | 8,319 |
91.1% |
To minimise post-harvest losses, the Standing Committee (2017) recommended that a country-wide integrated cold chain infrastructure network at block and district levels should be created. It further recommended that a Cold Chain Coordination and Monitoring Committee should be constituted at the district-level. The Standing Committee also recommended that farmers need to be trained in value addition activities such as sorting, grading, and pre-cooling harvested produce through facilities such as freezers and ripening chambers.
Between 2008 and 2017, 238 cold chain projects were sanctioned under the Scheme for Integrated Cold Chain and Value Addition Infrastructure. Grants worth Rs 1,775 crore were approved for these projects. Of this amount, Rs 964 crore (54%) has been released as of January 2018. Consequently, out of the total projects sanctioned, 114 (48%) are completed. The remaining 124 projects are currently under implementation.
Transport Facilities: Currently, majority of food grains and certain quantities of tea, potato, and onion are transported through railways. The Committee on Doubling Farmers Income had recommended that railways needs to upgrade its logistics to facilitate the transport of fresh produce directly to export hubs. This includes creation of adjoining facilities for loading and unloading, and distribution to road transport.
Mega Food Parks: The Mega Food Parks scheme was launched in 2008. It seeks to facilitate setting up of food processing units. These units are to be located at a central processing centre with infrastructure required for processing, packaging, quality control labs, and trade facilitation centres.
As of March 2018, out of the 42 projects approved, 10 were operational. The Standing Committee on Agriculture noted certain reasons for delay in implementation of projects under the scheme. These include: (i) difficulty in getting loans from banks for the project, (ii) delay in obtaining clearances from the state governments and agencies for roads, power, and water at the project site, (iii) lack of special incentives for setting up food processing units in Mega Food Parks, and (iv) unwillingness of the co-promoters in contributing their share of equity.
Further, the Standing Committee stated that as the scheme requires a minimum area of 50 acres, it does not to promote smaller or individual food processing and preservation units. It recommended that smaller agro-processing clusters near production areas must be promoted. The Committee on Doubling Farmers Income recommended establishment of processing and value addition units at strategic places. This includes rural or production areas for pulses, millets, fruits, vegetables, dairy, fisheries, and poultry in public private-partnership mode.
On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary. It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019. The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management. In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.
Nation-wide sanitation programmes in past
According to the Census, the rural sanitation coverage in India was only 1% in 1981.
The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas. Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC). While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.
By 2001, only 22% of the rural families had access to toilets. It increased further to 32.7% by 2011. In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).
In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation. In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets. Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations. In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.
On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively. While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs. In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.
Swachh Bharat Mission – Gramin (SBM-Gramin)
The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live. Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).
Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation.
Sources: Union Budgets 2014-15 to 2021-22; PRS.
The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years. Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%. However, every year since 2018-19, there has been some under-utilisation of the allocated amount.
As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2). However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”. The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.
Figure 2: Toilet coverage for rural households
Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.
The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line. It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.
In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore. ODF Plus includes sustaining the ODF status, and solid and liquid waste management. Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.
Swachh Bharat Mission – Urban (SBM-Urban)
SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country. One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019. However, this target was then lowered to 59 lakh IHHLS by 2019. This target was achieved by 2020 (see Table 1).
Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)
Targets |
Original Target |
Revised Target |
Actual Constructed |
Individual Household Latrines |
66,42,000 |
58,99,637 |
62,60,606 |
Community and Public Toilets |
5,08,000 |
5,07,587 |
6,15,864 |
Sources: Swachh Bharat Mission Urban - Dashboard; PRS.
Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.
Sources: Union Budget 2014-15 to 2021-22; PRS.
The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance. Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene. Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme.
The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing. The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21. In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).
Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)
Targets |
Target |
Progress |
Progress |
Door to Door Waste Collection (Wards) |
86,284 |
81,535 (96%) |
83,435 (97%) |
Source Segregation (Wards) |
86,284 |
64,730 (75%) |
67,367 (78%) |
Waste Processing (in %) |
100% |
65% |
68% |
Sources: Standing Committee on Urban Development (2021); PRS.
In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched. Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites. On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.