Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
The counting of votes for General Election 2019, which concluded on Sunday, will begin tomorrow, i.e., 23rd May at 8 AM. The election was conducted in 7 phases for 543 constituencies of Lok Sabha. The Election Commission of India (ECI) uses Electronic Voting Machines (EVM) to conduct elections. Since 2000, ECI has conducted 113 assembly elections and three general elections using EVMs.[1] Voter Verified Paper Audit Trail (VVPAT) system was added to EVMs in 2013 to increase transparency and improve voter confidence in the system. The VVPAT system generates a printed paper slip bearing the name and election symbol of the candidate. On April 8, 2019, Supreme Court instructed the ECI that printed VVPAT slips from randomly selected five polling stations in each assembly segment of a parliamentary constituency should be matched with EVMs.[2] In this blog, we explain the election counting process in India.
Who is responsible for counting the votes?
The Returning Officer (RO) is responsible for conducting elections in a constituency, which also includes counting of votes.[3] The RO is an officer of the government or a local authority nominated by the ECI for each constituency in consultation with the state government.[4]
Where does the counting take place?
The RO decides the place where the votes will be counted for the parliamentary constituency. The date and time of counting is fixed by the ECI. Ideally counting of votes for a constituency should be done at one place, preferably at the Headquarter of the RO in that constituency. It should be performed under the direct supervision of the RO. However, each Parliamentary Constituency has multiple assembly segments. In this situation, counting can take place at different locations for various assembly segments under the direct supervision of an Assistant Returning Officer (ARO).
Layout of the Counting Hall
Page 431, Handbook for Returning Officer Document 23 Edition 1, Election Commission of India
Counting of votes for each assembly segment of a parliamentary constituency is performed in a single hall. In each round of counting, votes from 14 EVMs are counted. In case of simultaneous parliamentary and assembly elections, such as Odisha, the first seven tables are used for counting votes for assembly elections, and the rest for parliamentary elections.
In constituencies with a large number of candidates, it may not be possible to count votes for all candidates in a single hall without overcrowding it. In such a situation, the number of counting halls or tables can be increased with the prior permission of the ECI. A hall can also be used for counting votes of another assembly segment after the results of the first segment are declared. However, counting may be done for only one assembly segment in a hall at any point of time.
What is the counting process?
Counting is performed by counting supervisors appointed by the RO. Counting staff is appointed through a three stage randomisation process to ensure impartiality. Candidates along with their counting agents and election agents are also present in the counting hall.
Counting of votes begins with Electronically Transmitted Postal Ballots (ETPB) and Postal Ballots (PB). These votes are counted under the direct supervision of the RO. Counting of EVMs can start 30 minutes after the commencement of PB counting, even if all PBs have not been counted. At the end of each round of counting, the results from 14 EVMs are declared.
What is the process for counting VVPAT slips?
The ECI prescribes the process for randomly selecting one EVM for each assembly segment of a parliamentary constituency for VVPAT matching. The verification of VVPAT paper slips is conducted inside a secured VVPAT Counting Booth in the counting hall with access to authorised personnel only. Any counting table in the hall can be converted into VVPAT Counting Booth after completing EVM vote counting. Parliamentary constituencies generally have between five and ten assembly segments.
The Supreme Court has decided that VVPAT slips of five randomly selected polling stations for each assembly segment shall be matched with the result shown in the respective EVMs. This implies that VVPAT paper slips need to be matched for about 25-50 machines for each parliamentary constituency. This process requires personal supervision of RO/ARO. The ECI has decided that the counting of five VVPATs will be done sequentially.[5] The RO can declare the final result for the constituency after the VVPAT matching process has been completed.
What happens if there is a discrepancy between the VVPAT count and the EVM results?
In such a case, the printed paper slips count is taken as final. The ECI has not clarified whether there would be any further action (such as counting of all VVPATs in a constituency or assembly segment) if there is a discrepancy in the counts of one of the five VVPATs.
[1] https://www.eci.gov.in/files/file/8756-status-paper-on-evm-edition-3/.
[2] N Chandrababu Naidu and Ors. v. Union of India and Anr WP(C). 273/2019 decided on April 8, 2019.
[3] https://www.eci.gov.in/files/file/9400-hand-book-for-returning-officer-february-2019/.
[4] https://www.eci.gov.in/faqs/elections/election-machinery/faqs-election-machinery-r1/.
[5] https://www.eci.gov.in/files/file/10197-mandatory-verification-of-vvpat-paper-slips-regarding/.
In the last decade, the government has implemented several schemes to address issues related to urbanisation and aid the process of urban development. One of the schemes is the Smart Cities Mission, which intends to take advantage of the developments in information technology in developing the urban development strategy, across 100 cities. Last week the government announced the list of 9 new Smart Cities, taking the total to 99. In light of this, we look at the Smart Cities Mission and a few issues with it.
What is a Smart City?
The primary objective of the Mission is to develop cities that provide core infrastructure and give a decent quality of life to its citizens, a clean and sustainable environment, and apply ‘smart’ solutions.
However, the Mission document does not provide one definition of a Smart City. Instead it allows cities to come up with their own solutions of what they identify as a Smart City. The guidelines suggest that the core infrastructure elements in a Smart City will include: (i) adequate water supply, (ii) assured electricity supply, (iii) sanitation, including solid waste management, (iv) efficient urban mobility and public transport, (v) affordable housing, (vi) robust IT connectivity, and (vii) good governance. ‘Smart’ solutions may include (i) energy efficient buildings, (ii) electronic service delivery, (iii) intelligent traffic management, (iv) smart metering, (v) citizen engagement, etc.
How were the Smart Cities selected?
The Mission was introduced in the form of a competition, called the Smart City challenge. The first stage was in July 2015 when states nominated their cities for the competition. In August 2015, the Ministry of Urban Development selected 100 of those cities to participate in the competition. These cities were required to develop their smart city plans (SCPs) and compete against each other. The SCPs were evaluated on the basis of the solutions, the processes followed, the feasibility and cost effectiveness of the plans, and citizen engagement. Over the last 2 years, the Ministry has announced winner cities in batches. So far, 99 cities have been selected under the Mission.
What information do these SCPs contain?
The cities had to prepare their SCPs with two primary strategic components: (i) area-based development, and (ii) pan-city development. The area-based development would cover a particular area of the city, and could have either a redevelopment model, or be a completely new development. Pan-city development would envisage application of certain smart solutions across the city to the existing infrastructure.
Each city had to formulate its own concept, vision, mission and plan for a Smart City that was appropriate to its local context and resources. The Ministry of Urban Development provided technical assistance, through consultancy firms, to cities for helping them prepare these strategic documents.
How will the Mission be implemented?
The Mission will be implemented at the city level by a Special Purpose Vehicle (SPV). The SPV will plan, approve, release funds, implement, manage, monitor, and evaluate the Smart City development projects.
The SPV will be a limited company incorporated under the Companies Act, 2013 at the city-level. It will be chaired by the Collector/ Municipal Commissioner of the Urban Development Authority. The respective state and the Urban Local Body (ULB or municipality) will be the promoters in this company having 50:50 equity shareholding.
How are the Plans getting financed?
The Mission will be operated as a Centrally Sponsored Scheme. The central government will provide financial support of up to Rs 48,000 crore over five years, that is, an average of Rs 500 crore per city. The states and ULBs will have to contribute an equal amount. The central government allocated Rs 4,000 crore towards the Mission in the 2017-18 budget.
Since funding from the government will meet only a part of the funding required, the rest will have to be raised from other sources including: (i) states/ ULBs own resources from collection of user fees, land monetization, etc., (ii) innovative finance mechanisms such as municipal bonds, (iii) leverage borrowings from financial institutions (such as banks), and (iv) the private sector through Public Private Partnerships (PPPs).
The total cost of projects proposed under the various SCPs of the 90 winner cities is Rs 1.9 lakh crore. About 42% of this amount will come from central and state funding, 23% through private investments and PPPs, and 19% through convergence with other schemes (such as HRIDAY, AMRUT, Swachh Bharat-Urban). The remaining will be generated by the cities through the levy of local taxes, and user fees.
What are some of the issues to consider?
Financial capacity of cities: Under the Mission, cities have to generate additional revenue through various sources including market borrowings, PPPs, and land monetization. The High Powered Expert Committee on Indian Urban Infrastructure and Services (HPEC) had observed that ULBs in India are among the weakest in the world, both in terms of capacity to raise resources and financial autonomy. Even though ULBs have been getting higher allocations from the centre and states, and tax devolution to them has increased, their own tax bases are narrow. Further, owing to their poor governance and financial situation, ULBs find it difficult to access external financing.
Such a situation may pose problems when implementing the Mission, where the ULBs have to raise a significant share of the revenue through external sources (PPPs, market borrowings). For example, the Bhubaneswar Smart City Plan has a total project cost of Rs 4,537 crore (over five years), while the city’s annual budget for 2014-15 was Rs 469 crore.
In order to improve the finances of the ULBs, committees have made various recommendations, which include:
The government has recently introduced a few policies and mechanisms to address municipal financing. Examples include value capture financing through public investments in infrastructure projects, and a credit rating system for cities. In June 2017, the Pune Municipal Corporation raised Rs 200 crore by issuing municipal bonds.
Technical capacity of the ULBs: The Smart Cities Mission seeks to empower ULBs to raise their own revenue, and also lays emphasis on the capacity building of ULBs. The HPEC had observed that municipal administration has suffered due to: (i) presence of untrained and unskilled manpower, and (ii) shortage of qualified technical staff and managerial supervisors. It had recommended improving the technical capacity of ULBs by providing technical assistance to state governments, and ULBs in planning, financing, monitoring, and operation of urban programmes. The central government had allocated Rs 10.5 crore towards the capacity building component of the Mission in 2017-18.
The Ministry of Urban Development has been running several programmes to improve capacity of ULBs. This includes MoUs with 18 states to conduct training programmes for their ULB staff.
Coverage of the Mission: The Mission covers 100 cities, of which 99 have been announced as winners so far. The urban population that will be impacted through the Mission is around 96 million (data for 90 cities excluding the recently announced 9 cities).
As per Census 2011, India’s urban population was 377 million. The Mission impacts about 25% of this population. Further, most of the SCPs approved so far focus on area-based development, thus affecting a particular area of the cities. About 80% of the total project cost proposed is towards this model of development. In each city, this area-based development will cover up to 50 acres of area. The remaining 20% of the project cost is towards pan-city development proposals, which provide smart planning solutions for the entire city. It may be argued that even within the selected cities, the Mission will only impact few selected areas, and not necessarily help with development of the entire city.