Recently the government released draft rules under the Right to Information Act for consultation before it finalised them.  This process of public consultation on draft rules is a welcome step which is not often followed. Many Acts passed by Parliament 'delegate' the power to make rules and regulations to the executive (government and regulatory bodies such as RBI and TRAI).  The reason is that these rules may need to be changed at frequent intervals (such as, say specifications on food labels), and may not need the time and expense required for amendment to the Act by Parliament.  However, Parliament retains for itself the power to examine these rules.  Most Acts passed by Parliament provide that rules framed under them will be laid before the Parliament.  Any Member of Parliament may demand a discussion on the rules and a vote to modify or nullify them. In practice, a large number of rules are laid before Parliament, making it very difficult for Parliamentarians to examine them effectively.  In the last session of Parliament, more than 1500 documents were laid before Parliament.  No discussion on specific rules has taken place in Parliament in the 14th and 15th Lok Sabha (2004-10). Both the Lok Sabha and Rajya Sabha also have Committees on Subordinate Legislation to examine these rules.  Out of 1515 rules, regulations, circulars and schemes laid before Lok Sabha between 2008 and 2010, the Committee has examined 44 documents.  This amounts to only 3% of the afore-mentioned documents laid before the Lok Sabha. It is important that Parliament oversee the power to make rules that it has delegated to the government.  For that, it needs to invest in strengthening the research staff of the committee on subordinate legislation as well as provide research stafff to MPs.

Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector.  The Kudankulam power plant will have two reactors.  At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of  total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011.  In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu).  The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12.  The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh.  Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%).  A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators.  To view data in ascending or descending order, simply click the relevant column heading.  (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /]   Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery