Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.

In the recently concluded Monsoon Session of Parliament , the Parliamentary Standing Committee on Rural Development released a report on the implementation of the Mahatma Gandhi National Rural Development Act, 2005 (MGNREGA).  This blog provides a brief introduction to the key provisions of MGNREGA , followed by an overview of the major findings and recommendations of the Standing Committee.

I. MGNREGA: A brief introduction

A. Objectives: MGNREGA, which is the largest work guarantee programme in the world, was enacted in 2005 with the primary objective of guaranteeing 100 days of wage employment per year to rural households.  Secondly, it aims at addressing causes of chronic poverty through the 'works' (projects) that are undertaken, and thus ensuring sustainable development.  Finally, there is an emphasis on strengthening the process of decentralisation through giving a significant role to Panchayati Raj Institutions (PRIs) in planning and implementing these works.

B. Key features:

  • Legal right to work: Unlike earlier employment guarantee schemes, the Act provides a legal right to employment for adult members of rural households.  At least one third beneficiaries have to be women.  Wages must be paid according to the wages specified for agricultural labourers in the state under the  Minimum Wages Act, 1948, unless the central government notifies a wage rate (this should not be less than Rs 60 per day).  At present, wage rates are determined by the central government but vary across states, ranging from Rs 135 per day to Rs 214 per day.
  • Time bound guarantee of work and unemployment allowance: Employment must be provided with 15 days of being demanded failing which an ‘unemployment allowance’ must be given.
  • Decentralised planning: Gram sabhas must recommend the works that are to be undertaken and at least 50% of the works must be executed by them.  PRIs are primarily responsible for planning, implementation and monitoring of the works that are undertaken.
  • Work site facilities: All work sites should have facilities such as crèches, drinking water and first aid.
  • Transparency and accountability: There are provisions for proactive disclosure through wall writings, citizen information boards, Management Information Systems and social audits.  Social audits are conducted by gram sabhas to enable the community to monitor the implementation of the scheme.
  • Funding:  Funding is shared between the centre and the states.  There are three major items of expenditure – wages (for unskilled, semi-skilled and skilled labour), material and administrative costs.  The central government bears 100% of the cost of unskilled labour, 75% of the cost of semi-skilled and skilled labour, 75% of the cost of materials and 6% of the administrative costs.

MGNREGA was implemented in phases, starting from February 2006, and at present it covers all districts of the country with the exception of those that have a 100% urban population.  The Act provides a list of works that can be undertaken to generate employment related to water conservation, drought proofing, land development, and flood control and protection works.  Table 1 provides information regarding employment generation and expenditure under MGNREGA.

Table 1: MGNREGA: Key indicators

Year

Number of households provided employment (in crore)

Average number of person days of work per household

Total Expenditure (in lakh)

2006-07

2.10

43

8823.35

2007-08

3.39

42

15856.88

2008-09

4.51

48

27250.10

2009-10

5.25

54

37905.23

2010-11

5.49

47

39377.27

2011-12*

4.99

43

 38034.69

2012-13**

4.25

36

 28073.51

Source: Standing Committee on Rural Development; PRS. Note: *Provisional ** As on 31.01.2013

II. Findings and Recommendations of the Standing Committee on Rural Development

A. Achievements: The Standing Committee highlighted several achievements of MGNREGA in the seven years of its implementation, especially:

  • Ensuring livelihood for people in rural areas.
  • Large scale participation of women, Scheduled Castes and Scheduled Tribes (SCs/STs) and other traditionally marginalised sections of society.  SCs/STs account for 51% of the total person-days generated and women account for 47% of the total person-days generated.
  • Increasing the wage rate in rural areas and strengthening the rural economy through the creation of infrastructure assets.
  • Facilitating sustainable development, and
  • Strengthening PRIs by involving them in the planning and monitoring of the scheme.

B. Challenges: However, the Committee found several issues with the implementation of the scheme. As Table 1 (above) shows, the average number of days of employment provided to households has been lower than the mandated 100 days, and has been decreasing since 2010-11. Key issues that the Committee raised include

  • Fabrication of job cards: While as many as 12.5 crore households have been issued job cards out of an estimated 13.8 crore rural households ( as per the 2001 census), there are several issues related to existence of fake job cards, inclusion of fictitious names, missing entries and delays in making entries in job cards.
  • Delay in payment of wages: Most states have failed to disburse wages within 15 days as mandated by MGNREGA.  In addition, workers are not compensated for a delay in payment of wages.
  • Non payment of unemployment allowances: Most states do not pay an unemployment allowance when work is not given on demand.  The non-issuance of dated receipts of demanded work prevents workers from claiming an unemployment allowance.
  • Large number of incomplete works: There has been a delay in the completion of works under MGNREGA and inspection of projects has been irregular.  Implementing agencies were able to complete only 98 lakh works out of 296 lakh works.  As Table 2 shows, a large percentage of works remain incomplete under MGNREGA and the work completion rate appears to be decreasing in recent years.

Table 2: Work completion rate

Year

Work completion rate (%)

2006-07

46.34

2007-08

45.99

2008-09

43.76

2009-10

48.94

2010-11

50.86

2011-12*

20.25

2012-13*

15.02

Total                  33.22

Source: Standing Committee on Rural Development. Note: * As on 30.01.2013

  • Other key challenges include poor quality of assets created, several instances of corruption in the implementation of MGNREGA, and insufficient involvement of PRIs.

C. Recommendations: The Committee made the following recommendations, based on its findings:

  • Regulation of job cards: Offences such as not recording employment related information in job cards and unlawful possession of job cards with elected PRI representatives and MGNREGA functionaries should be made punishable under the Act.
  • Participation of women: Since the income of female workers typically raises the standard of living of their households to a greater extent than their male counterparts, the participation of women must be increased through raising awareness about MGNREGA.
  • Participation of people with disabilities: Special works (projects) must be identified for people with disabilities; and  special job cards must be issued and personnel must be employed to ensure their participation.
  • Utilisation of funds:  The Committee found that a large amount of funds allocated for MGNREGA have remained unutilised.  For example, in 2010-11, 27.31% of the funds remained unutilised.  The Committee recommends that the Department of Rural Development should analyse reasons for poor utilisation of funds and take steps to improve the same.  In addition, it should initiate action against officers found guilty of misappropriating funds under MGNREGA.
  • Context specific projects and convergence: Since states are at various stages of socio-economic development, they have varied requirements for development.  Therefore, state governments should be allowed to undertake works that are pertinent to their context.  There should be more emphasis on skilled and semi-skilled work under MGNREGA.  In addition, the Committee recommends a greater emphasis on convergence with other schemes such as the National Rural Livelihoods Mission, National Rural Health Mission, etc.
  • Payment of unemployment allowance: Dated receipts for demanded work should be issued so that workers can claim unemployment allowance.  Funds for unemployment allowance should be met by the central government.
  • Regular monitoring: National Level Monitors (NLMs) are deployed by the Ministry of Rural Development for regular and special monitoring of MGNREGA and to enquire into complaints regarding mis-utilisation of funds, etc.  The Committee recommends that the frequency of monitoring by NLMs should increase and appropriate measures should be taken by states based on their recommendations.  Additionally, social audits must mandatorily be held every six months.  The Committee observes that the performance of MGNREGA is better in states with effective social audit mechanisms.
  • Training of functionaries: Training and capacity building of elected representatives and other functionaries of PRIs must be done regularly as it will facilitate their involvement in the implementation of MGNREGA.

On January 17, 2020, the Ministry of Health and Family Welfare acknowledged the emergence of a new coronavirus (COVID-19) that was spreading across China.[1]  On March 11, 2020, the World Health Organisation declared the COVID-19 disease to be a global pandemic. As of April 7, 2020, there are 4,421 confirmed cases of COVID-19 in India.[2]   Of these, 326 patients have been cured/discharged and 114 have died.1   

As the spread increased and more information about the virus was uncovered, the central government announced several policy decisions to contain it.  Further, measures were also announced to support citizens and businesses who were affected by such containment measures.  In this blog post, we summarise some of the key measures taken by the central government in this regard as of April 7. 

 image

Source: Ministry of Health and Family Welfare, PRS.

Movement restrictions

21-day lockdown in the country

The Ministry of Home Affairs announced a 21-day lockdown to contain the spread of COVID-19 from March 25, 2020 to April 14, 2020.[3]   During the lockdown, all establishments, other than those providing essential goods and services, and those involved in agricultural operations, have been closed.   Essential goods include items such as food, medicine, and electricity.  Essential services include banking services, telecommunications, and pharmaceuticals.  Transportation of all goods (essential or non-essential) will remain functional. [4],[5],[6],[7],[8]   

All state/UT governments have been directed to: (i) arrange for shelter and food for the needy, including migrant workers, (ii) quarantine migrant workers for at least 14 days, (iii) direct employers to pay wages during the lockdown, and (iv) ensure landlords do not demand rent from workers and students for one month.[9]  

Financial aid

Pradhan Mantri Garib Kalyan Yojana to provide relief against COVID-19

On March 26, the Finance Minister announced a relief package of 1.7 lakh crore rupees under the Pradhan Mantri Garib Kalyan Yojana for the poor.[10]  Key features of the package are:10,[11]

  • Insurance cover of Rs 50 lakh will be provided to health workers (such as doctors, nurses, paramedics and ASHA workers) who are treating patients of COVID-19.[12]

  • Five kilograms of wheat or rice and one kilogram of preferred pulses will be provided for free every month to poor families for the next three months.  

  • Women account holders under the Pradhan Mantri Jan Dhan Yojana will get Rs 500 per month between April and June, and poor families will be given three free gas cylinders over the next three months.  

Extension and relaxation in payment of taxes

The Taxation and Other Laws (Relaxation of Certain Provisions) Ordinance, 2020 was promulgated on March 31, 2020.10  The Ordinance provides certain relaxations, such as extension of time limits and waivers of penalties, in relation to specified laws.  These include the Income Tax Act, 1961 (IT Act), some Finance Acts, and the Prohibition of Benami Property Transactions Act, 1988.  Key provisions under the Ordinance include:

  • Extension of time limits:   The Ordinance extends the time limits (for the period between March 20, 2020 to June 29, 2020) for compliance of certain actions such as: (i) issuing notifications, completing proceedings, and passing orders by authorities and tribunals, (ii) filing of appeals, replies, and applications, and furnishing documents, and (iii) making any investment or payment for claiming deductions or allowances under the IT Act.  

  • Interest and penalty:  Payment of any tax, made before June 30, 2020 (or any further date specified by the government), will not be liable for prosecution or penalty.  Also, the rate of interest payable for the delay in payment will not exceed 0.75% per month.

  • Donations to PM CARES Fund:  Donations made by a person to the PM CARES Fund will be eligible for 100% tax deduction.

  • GST compliances:  The central government may notify extension to time limits for various compliances under the Central Goods and Services Tax Act, 2017.

Measures by RBI to address the financial stress caused by COVID-19

The Reserve Bank of India (RBI) also announced several measures to address the stress in the economy caused by COVID-19.[13],[14],[15]  Key measures are detailed below:

  • Cutting Policy Rates:  The repo rate (the rate at which RBI lends money to banks) was reduced from 5.15% to 4.4%.   The reverse repo rate (the rate at which RBI borrows money from banks) was reduced from 4.9% to 4.0%.  

  • Liquidity management: Measures are being taken to expand liquidity in the market to ensure that financial markets and institutions can function normally.  These measures include the reduction of the Cash Reserve Ratio (CRR) for all banks from 4% to 3% till March 26, 2021.  CRR is the amount of liquid cash that banks have to maintain with the RBI, as a percentage of their total deposits.  These steps are expected to inject total liquidity of Rs 3.74 lakh crore. 

  • Relief to borrowers in repayment of loans:  All banks and financial institutions (including NBFCs) are permitted to grant a moratorium of three months on payment of all term loan instalments (including agricultural, retail and crop loans) and interest on working capital loans (such as overdraft facilities), which are due between March 1, 2020 and May 31, 2020.  

Short term credit to states

The Reserve Bank of India (RBI) has constituted an Advisory Committee to review the Ways and Means Advances (WMA) limits for states and UTs. WMA limits refer to temporary loans given by the RBI to state governments. Until the Committee submits its final recommendations, the WMA limit has been increased by 30% from the existing limit, for all states and UTs. The revised limits will be in force between April 1 and September 30, 2020.[16]

PM CARES Fund 

The central government has set up a national fund to deal with emergencies like the COVID-19 pandemic.  The public charitable trust known as the Prime Minister’s Citizen Assistance and Relief in Emergency Situations Fund (PM CARES Fund) will provide relief to those affected by COVID-19.  The trust is chaired by the Prime Minister and includes members such as the Defence Minister, Home Minister, and Finance Minister.[17]

Donations made by a person to the PM CARES Fund are 100% tax deductible.[18]  Non-residents can also contribute to the Fund through foreign inward remittances.[19] 

Health measures

COVID-19 testing 

Currently, government facilities are offering free of cost diagnosis to all individuals with COVID-19 symptoms.[20]  Further, the government has approved certain private laboratories to test individuals for COVID-19.  The cost of screening in private labs may not exceed Rs 4,500.[21]   As of April 7, there are 136 government testing centres for analysing samples of COVID-19 and 3 additional collection centres.[22]   Further, there were 59 private labs offering testing in 12 states.  These states are Delhi, Maharashtra, Kerala, West Bengal, Uttar Pradesh, Telangana, Tamil Nadu, Odisha, Karnataka, Haryana, Uttarakhand and Gujarat.[23]

The Ministry of Health and Family Welfare has also laid down guidelines for those who may be tested at these laboratories.   These include: (i) symptomatic contacts of those who have tested positive for COVID-19, and (ii) symptomatic persons with a travel history to COVID-19 affected countries, (iii) symptomatic healthcare workers, and (iv) persons with severe respiratory diseases.21

Containment plan for large outbreaks

The Ministry of Health and Family Welfare has created a plan to contain the spread of the COVID-19 disease.  Some of the measures suggested in the plan include:[24] 

  • Geographic quarantine:   This strategy requires the restriction of movement of people to and from a defined geographic area where there is a large outbreak.  

  • Cluster Containment:  This strategy will contain the disease within a defined geographic area by early detection of cases.  Cluster containment will include geographic quarantine, social distancing, testing all suspected cases, and awareness amongst the public. 

Restrictions on export of medicines and medical equipment

The central government placed restrictions on the export of certain medical equipment and medication so as to ensure its availability in India.  For example, the export of ventilators, surgical masks, diagnostic kits, and medications such as paracetamol and hydroxychloroquine is restricted.[25],[26],[27],[28]

Travel restrictions

Domestic and international travel banned; issue of visas suspended

Civil Aviation:  All passenger domestic air travel within the country is banned from March 24 till April 14, 2020.[29],[30]  All international commercial passenger travel has been banned till April 14, 2020 (cargo and certain other flights are exempted).[31]  All existing visas issued to nationals of any country except those issued to diplomats, officials, UN/international organisations, employment and project visas are suspended from March 13 till April 15, 2020.[32] 

Railways:  Indian Railways suspended all passenger trains till April 14, 2020.[33]  Transportation of essential commodities will continue.[34]  Railways has also made parcel vans available for quick transportation for e-commerce companies and other customers including state governments to transport certain goods.   These include medical supplies, medical equipment, food, etc. in small parcel sizes.[35]  

For a detailed summary of the main policy decisions taken by the central government with regard to COVID-19, please see here.

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.


[1] Novel coronavirus outbreak in China, Ministry of Health and Family Welfare, January 17, 2020, https://www.mohfw.gov.in/pdf/TraveladvisorytotravelersvisitingChina17012020.pdf.

[2] Ministry of Health and Family Welfare website, last accessed on March 31, 2020, https://www.mohfw.gov.in/index.html.

[3] Order No. 1-29/2020-PP, National Disaster Management Authority, March 24, 2020, https://mha.gov.in/sites/default/files/ndma%20order%20copy.pdf.

[4] Order No. 40-3/2020-DM-I(A), Ministry of Home Affairs, March 24, 2020, https://mha.gov.in/sites/default/files/MHAorder%20copy.pdf.

[5] “Guidelines on measures to be taken by Ministries/Department of Government of India, State/Union Territory Governments and State/Union Territory Authorities for containment of COVID-19 Epidemic in the Country”, Ministry of Home Affairs, March 24, 2020, https://mha.gov.in/sites/default/files/Guidelines.pdf.

[6] Second Addendum to Order No. 40-3/2020-DM-I(A), Ministry of Home Affairs, March 24, 2020, https://mha.gov.in/sites/default/files/PR_SecondAddendum_27032020.pdf.

[7] “Consolidated Guidelines on the measures to be taken by Ministries/Departments of Government of India, State/Union Territory Governments and State/Union Territory Authorities for containment of COVID-10 Epidemic in the Country, as notified by the Ministry of Home Affairs on 24.03.2020 and further modified on 25.03.2020 and 27.03.2020”, Ministry of Home Affairs, https://mha.gov.in/sites/default/files/PR_ConsolidatedGuidelinesofMHA_28032020.pdf.

[8] D.O. No. 40-3/2020-DM-I(A), Ministry of Home Affairs, March 29, 2020, http://164.100.117.97/WriteReadData/userfiles/3rd%20Addendum%20to%20Lockdown%20Guidelines%20on%20exempted%20Goods%20and%20Services.pdf.

[9] Order No. 40-3/2020-DM-I(A), Ministry of Home Affairs, March 29, 2020, https://mha.gov.in/sites/default/files/MHA%20Order%20restricting%20movement%20of%20migrants%20and%20strict%20enforement%20of%20lockdown%20measures%20-%2029.03.2020.pdf.

[10] “Finance Minister announces Rs 1.70 Lakh Crore relief package under Pradhan Mantri Garib Kalyan Yojana for the poor to help them fight the battle against Corona Virus”, Press Information Bureau, Ministry of Finance, March 26, 2020.

[11] “Monetary and Fiscal policy response by Government of Indian and Regulators”, Department of Economic Affairs, Ministry of Finance, March 27, 2020, https://dea.gov.in/sites/default/files/India%20economic%20policy%20response%20on%20%20COVID%2019%20Fiscal%20and%20Monetary%20as%20on%2027032020.pdf.

[12] “Pradhan Mantri Garib Kalyan Package: Insurance Scheme for Health Workers Fighting COVID-19”, Press Information Bureau, Ministry of Health and Family Welfare, March 29, 2020. 

[13] Seventh Bi-Monthly Policy Statement 2019-20”, Press Release, Reserve Bank of India, March 27, 2020, https://rbidocs.rbi.org.in/rdocs/PressRelease/PDFs/PR2129F5E23A447E0F4A00955429716C53F5A2.PDF.

[14] “Statement on Developmental and Regulatory Practices”, Reserve Bank of India, Press Releases, March 27, 2020, https://www.rbi.org.in/Scripts/BS_PressReleaseDisplay.aspx?prid=49582.

[15] “COVID-19 – Regulatory Package”, Notifications, Reserve Bank of India, March 27, 2020, https://www.rbi.org.in/Scripts/NotificationUser.aspx?Id=11835.

[16] RBI announces further measures for dealing with the COVID-19 pandemic, Reserve Bank of India, April 1, 2020, https://rbidocs.rbi.org.in/rdocs/PressRelease/PDFs/PR2167BA409AC37FA8460497BA0C9B283E5DD9.PDF.

[17] Appeal to generously donate to ‘Prime Minister’s Citizen Assistance and Relief in Emergency Situations Fund (PM CARES Fund)’, Press Information Bureau, Prime Minister’s Office, March 28, 2020, https://pib.gov.in/PressReleseDetailm.aspx?PRID=1608851.

[18] The Taxation and Other Laws (Relaxation of Certain Provisions) Ordinance, 2020, Gazette of India, Ministry of Law and Justice, March 31, 2020, http://www.egazette.nic.in/WriteReadData/2020/218979.pdf.

[19] Rupee Drawing Arrangement – Remittance to the Prime Minister’s Citizen Assistance and Relief in Emergency Situations (PM-CARES) Fund, Reserve Bank of India, April 3, 2020, https://rbidocs.rbi.org.in/rdocs/Notification/PDFs/NOT2087A69F5158C174585A46C69B78BD96DBD.PDF.

[20] Strategy for COVID-19 testing in India, India Council for Medical Research, Ministry of Health and Family Welfare, March 17, 2020, https://www.mohfw.gov.in/pdf/LabTestingAdvisory.pdf.

[21] Guidelines for COVID-19 testing in private laboratories in India, Ministry of Health and Family Welfare, March 21, 2002 https://www.mohfw.gov.in/pdf/NotificationofICMguidelinesforCOVID19testinginprivatelaboratoriesiIndia.pdf.

[22] Government Approved Laboratories by ICMR, Ministry of Health and Family Welfare, April 7, 2020.  https://icmr.nic.in/sites/default/files/upload_documents/Govt_Labs_functional_for_COVID19_testing_05042020.pdf.

[23] Private Approved Laboratories by ICMR, Ministry of Health and Family Welfare, April 7, 2020.  https://icmr.nic.in/sites/default/files/upload_documents/Private_Labs_06042020.pdf

[24] Containment Plan for Large Outbreaks, Ministry of Health and Family Welfare, April 4, 2020, https://www.mohfw.gov.in/pdf/3ContainmentPlanforLargeOutbreaksofCOVID19Final.pdf.

[25] S.O. 1171(E), Amendment in Export Policy of Masks, Ventilators and textile raw material for masks and coveralls, Ministry of Commerce and Industry, March 19, 2020, http://egazette.nic.in/WriteReadData/2020/218857.pdf

[26] S.O. 955(E), Amendment in Export Policy of APIs and formulations made from these APIs, Ministry of Commerce and Industry, March 3, 2020, http://egazette.nic.in/WriteReadData/2020/216551.pdf.

[27] Notification no. 01/2015-2020, Amendment in Export Policy of Hydroxychloroquine, Ministry of Commerce and Industry, April 4, 2020, https://prsindia.org/files/covid19/notifications/1492.IND_Export_Restriction_Hydroxychloroquine_Apr_4.pdf

[28] Notification no. 59/2015-2020, Amendment in Export Policy of Diagnostic Kits, April 4, 2020, https://prsindia.org/files/covid19/notifications/1491.IND_Export_Restriction_Diagnostic_Kits_Apr_4.pdf.

[29] AV. 11011/1/2020-US(AG) Office-MOCA, Ministry of Civil Aviation, March 23, 2020, https://www.civilaviation.gov.in/sites/default/files/Revised-%20COVID-19%20-%20Order%20under%20Section%208B.pdf.

[30] No.4/1/2020-IR, Director General of Civil Aviation, March 27, 2020, https://dgca.gov.in/digigov-portal/Upload?flag=iframeAttachView&attachId=130618666

[31] No.4/1/2020-IR, Director General of Civil Aviation, March 26, 2020, https://dgca.gov.in/digigov-portal/Upload?flag=iframeAttachView&attachId=130618625

[32] No.4/1/2020-IR, Director General of Civil Aviation, January 30 to March 17, 2020, https://dgca.gov.in/digigov-portal/Upload?flag=iframeAttachView&attachId=130617742

[33] “Ministry of Railways extends Cancellation of Passenger Train Services till 2400 hrs of 14th April, 2020”, Press Information Bureau, Ministry of Railways, March 25, 2020. 

[34] “Transportation of essential commodities to various parts of the country by Indian Railways continues at full speed”, Press Information Bureau, Ministry of Railways, March 30, 2020.  

[35] “Indian Railways to run Special Parcel Trains for carriage of essential items in small parcel sizes during the complete lockdown in fight against COVID-19”, Press Information Bureau, Ministry of Railways, March 29, 2020.