In the recently concluded Monsoon Session of Parliament , the Parliamentary Standing Committee on Rural Development released a report on the implementation of the Mahatma Gandhi National Rural Development Act, 2005 (MGNREGA).  This blog provides a brief introduction to the key provisions of MGNREGA , followed by an overview of the major findings and recommendations of the Standing Committee.

I. MGNREGA: A brief introduction

A. Objectives: MGNREGA, which is the largest work guarantee programme in the world, was enacted in 2005 with the primary objective of guaranteeing 100 days of wage employment per year to rural households.  Secondly, it aims at addressing causes of chronic poverty through the 'works' (projects) that are undertaken, and thus ensuring sustainable development.  Finally, there is an emphasis on strengthening the process of decentralisation through giving a significant role to Panchayati Raj Institutions (PRIs) in planning and implementing these works.

B. Key features:

  • Legal right to work: Unlike earlier employment guarantee schemes, the Act provides a legal right to employment for adult members of rural households.  At least one third beneficiaries have to be women.  Wages must be paid according to the wages specified for agricultural labourers in the state under the  Minimum Wages Act, 1948, unless the central government notifies a wage rate (this should not be less than Rs 60 per day).  At present, wage rates are determined by the central government but vary across states, ranging from Rs 135 per day to Rs 214 per day.
  • Time bound guarantee of work and unemployment allowance: Employment must be provided with 15 days of being demanded failing which an ‘unemployment allowance’ must be given.
  • Decentralised planning: Gram sabhas must recommend the works that are to be undertaken and at least 50% of the works must be executed by them.  PRIs are primarily responsible for planning, implementation and monitoring of the works that are undertaken.
  • Work site facilities: All work sites should have facilities such as crèches, drinking water and first aid.
  • Transparency and accountability: There are provisions for proactive disclosure through wall writings, citizen information boards, Management Information Systems and social audits.  Social audits are conducted by gram sabhas to enable the community to monitor the implementation of the scheme.
  • Funding:  Funding is shared between the centre and the states.  There are three major items of expenditure – wages (for unskilled, semi-skilled and skilled labour), material and administrative costs.  The central government bears 100% of the cost of unskilled labour, 75% of the cost of semi-skilled and skilled labour, 75% of the cost of materials and 6% of the administrative costs.

MGNREGA was implemented in phases, starting from February 2006, and at present it covers all districts of the country with the exception of those that have a 100% urban population.  The Act provides a list of works that can be undertaken to generate employment related to water conservation, drought proofing, land development, and flood control and protection works.  Table 1 provides information regarding employment generation and expenditure under MGNREGA.

Table 1: MGNREGA: Key indicators

Year

Number of households provided employment (in crore)

Average number of person days of work per household

Total Expenditure (in lakh)

2006-07

2.10

43

8823.35

2007-08

3.39

42

15856.88

2008-09

4.51

48

27250.10

2009-10

5.25

54

37905.23

2010-11

5.49

47

39377.27

2011-12*

4.99

43

 38034.69

2012-13**

4.25

36

 28073.51

Source: Standing Committee on Rural Development; PRS. Note: *Provisional ** As on 31.01.2013

II. Findings and Recommendations of the Standing Committee on Rural Development

A. Achievements: The Standing Committee highlighted several achievements of MGNREGA in the seven years of its implementation, especially:

  • Ensuring livelihood for people in rural areas.
  • Large scale participation of women, Scheduled Castes and Scheduled Tribes (SCs/STs) and other traditionally marginalised sections of society.  SCs/STs account for 51% of the total person-days generated and women account for 47% of the total person-days generated.
  • Increasing the wage rate in rural areas and strengthening the rural economy through the creation of infrastructure assets.
  • Facilitating sustainable development, and
  • Strengthening PRIs by involving them in the planning and monitoring of the scheme.

B. Challenges: However, the Committee found several issues with the implementation of the scheme. As Table 1 (above) shows, the average number of days of employment provided to households has been lower than the mandated 100 days, and has been decreasing since 2010-11. Key issues that the Committee raised include

  • Fabrication of job cards: While as many as 12.5 crore households have been issued job cards out of an estimated 13.8 crore rural households ( as per the 2001 census), there are several issues related to existence of fake job cards, inclusion of fictitious names, missing entries and delays in making entries in job cards.
  • Delay in payment of wages: Most states have failed to disburse wages within 15 days as mandated by MGNREGA.  In addition, workers are not compensated for a delay in payment of wages.
  • Non payment of unemployment allowances: Most states do not pay an unemployment allowance when work is not given on demand.  The non-issuance of dated receipts of demanded work prevents workers from claiming an unemployment allowance.
  • Large number of incomplete works: There has been a delay in the completion of works under MGNREGA and inspection of projects has been irregular.  Implementing agencies were able to complete only 98 lakh works out of 296 lakh works.  As Table 2 shows, a large percentage of works remain incomplete under MGNREGA and the work completion rate appears to be decreasing in recent years.

Table 2: Work completion rate

Year

Work completion rate (%)

2006-07

46.34

2007-08

45.99

2008-09

43.76

2009-10

48.94

2010-11

50.86

2011-12*

20.25

2012-13*

15.02

Total                  33.22

Source: Standing Committee on Rural Development. Note: * As on 30.01.2013

  • Other key challenges include poor quality of assets created, several instances of corruption in the implementation of MGNREGA, and insufficient involvement of PRIs.

C. Recommendations: The Committee made the following recommendations, based on its findings:

  • Regulation of job cards: Offences such as not recording employment related information in job cards and unlawful possession of job cards with elected PRI representatives and MGNREGA functionaries should be made punishable under the Act.
  • Participation of women: Since the income of female workers typically raises the standard of living of their households to a greater extent than their male counterparts, the participation of women must be increased through raising awareness about MGNREGA.
  • Participation of people with disabilities: Special works (projects) must be identified for people with disabilities; and  special job cards must be issued and personnel must be employed to ensure their participation.
  • Utilisation of funds:  The Committee found that a large amount of funds allocated for MGNREGA have remained unutilised.  For example, in 2010-11, 27.31% of the funds remained unutilised.  The Committee recommends that the Department of Rural Development should analyse reasons for poor utilisation of funds and take steps to improve the same.  In addition, it should initiate action against officers found guilty of misappropriating funds under MGNREGA.
  • Context specific projects and convergence: Since states are at various stages of socio-economic development, they have varied requirements for development.  Therefore, state governments should be allowed to undertake works that are pertinent to their context.  There should be more emphasis on skilled and semi-skilled work under MGNREGA.  In addition, the Committee recommends a greater emphasis on convergence with other schemes such as the National Rural Livelihoods Mission, National Rural Health Mission, etc.
  • Payment of unemployment allowance: Dated receipts for demanded work should be issued so that workers can claim unemployment allowance.  Funds for unemployment allowance should be met by the central government.
  • Regular monitoring: National Level Monitors (NLMs) are deployed by the Ministry of Rural Development for regular and special monitoring of MGNREGA and to enquire into complaints regarding mis-utilisation of funds, etc.  The Committee recommends that the frequency of monitoring by NLMs should increase and appropriate measures should be taken by states based on their recommendations.  Additionally, social audits must mandatorily be held every six months.  The Committee observes that the performance of MGNREGA is better in states with effective social audit mechanisms.
  • Training of functionaries: Training and capacity building of elected representatives and other functionaries of PRIs must be done regularly as it will facilitate their involvement in the implementation of MGNREGA.

The budget session of Parliament every year starts with the President’s Address to both Houses.  In this speech, the President highlights the government’s achievements and legislative activities in the last year, and announces its agenda for the upcoming year.   The address is followed by a motion of thanks that is moved in each House by ruling party MPs.  This is followed by a discussion on the address and concludes with the Prime Minister replying to the points raised during the discussion.

Today, the Budget Session 2019 commenced with the President, Mr. Ram Nath Kovind addressing a joint sitting of Parliament.  In his speech, he highlighted some of the objectives that the government has realised in the past year.  The President also highlighted the progress made by the government under various development schemes such as the Swachh Bharat Abhiyan, the Pradhan Mantri Jan Dhan Yojana, and the Pradhan Mantri Gram Sadak Yojana. 

Given that today’s address comes at the end of this government’s term, we examine the status of some key policy initiatives announced by the current government, that have been highlighted in speeches made in the past five years.  

Policy priority stated in President’s Addresses 2014-2018

                                                                       Current Status

Economy and Finance

Despite a global economic downturn, the Indian economy has remained on a high growth trajectory.

 

  • Growth Rate: The GDP is estimated to grow at 7.2% in 2018-19.[i]  In the last five years, GDP growth rate stayed within 7% and 8% per year, with a dip to 6.7% in 2017-18, the year of demonetisation.[ii],[iii]
  • Inflation: A target of 4% for the Consumer Price Index (CPI) inflation was notified by the Ministry of Finance for the period 2016-2021.[iv] CPI stayed within this band for most of the period between 2014 and 2018.
  • Foreign Exchange Reserves stood at USD 397 billion on January 2019, as compared to USD 313 billion in May, 2014.[v],[vi]

Measures to deal with corruption, black money and counterfeit currency will be introduced

 

  • Demonetisation:  On November 8, 2016, the Government announced the demonetisation of Rs 500 and Rs 1000 notes.[vii]  During the period from November 2016 to October 2017, undisclosed income of over Rs 24,800 crore was detected.[viii]
  • The Fugitive Economic Offenders Bill, 2018 was passed in July, 2018.  The Bill seeks to confiscate properties of economic offenders who have left the country to avoid facing criminal prosecution.[ix]
  • The Prevention of Corruption (Amendment) Bill, 2013 amends the Prevention of Corruption Act, 1988.  Under the 1988 Act, taking of a bribe by a public official was an offence.  The Bill also makes the giving of a bribe an offence.[x] 

To promote the concept of cooperative federalism through One Nation-One Tax and One Nation-One Market, the government introduced the Goods and Services Tax

  • Goods and Services Tax was introduced across the country from July 1, 2017.[xi]  

Agriculture

Agriculture is the main source of livelihood for a majority of people.  For holistic development of the agricultural sector, the Pradhan Mantri Fasal Bima Yojana was launched in 2016

  • Pradhan Mantri Fasal Bima Yojana (PMFBY):  PMFBY was launched with the aim of providing insurance coverage and financial support to farmers in the event of crop failure.  The number of farmers enrolled under the scheme declined from 5.7 crore in 2016-17 to 5.2 crore in 2017-18.[xii]  

Employment and Entrepreneurship

The government has continuously worked for reforms of labour laws.  Minimum wages have increased by more than 40%

 

  • Over the last three years, the Ministry of Labour and Employment has introduced three draft Codes to simplify labour laws.  These are: (i) the draft Labour Code on Industrial Relations, (ii) the draft Code on Social Security and (iii) the draft Code on Occupational Safety, Health and Working Conditions.60  Additionally, in 2017, the Code on Wages Bill, 2017 was introduced in the Lok Sabha.
  • In 2017, the central government increased minimum wages by 40% through a gazette notification.  Minimum wages (per day) for non-agricultural workers increased from Rs 250 to Rs 350 for unskilled workers and Rs 523 for skilled workers.[xiii],[xiv],[xv]

Infrastructure

Cities are the engines of economic growth.  The Smart City programme was initiated to build modern amenities and infrastructure.

 

  • Smart Cities and the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) have an outlay of Rs 48,000 crore and Rs 50,000 crore for the period 2015-2020, respectively.[xvi]
  • As of January 19, 2018, 100 smart cities have been selected.  As of 2018, the total proposed investment in these cities is Rs 2,05,018 crore.[xvii],[xviii]

All rural habitations will be connected with all-weather roads. So far, 73,000 kilometres of roads have been laid in rural areas.

 

  • The Pradhan Mantri Gram Sadak Yojana (PMGSY) aims to connect all eligible unconnected habitations in rural areas with all-weather roads by March 2019.[xix],[xx]  As of January 29, 2019, of the target of 1.52 lakh habitations to be covered since the inception of the scheme, 1.46 lakh (96%) habitations have been connected.[xxi]  

Housing is a fundamental right.  All households shall have a dwelling unit under the Mission Housing for All by 2022.

 

  • Pradhan Mantri Awas Yojana (PMAY) was launched in 2015.  The Yojana has two components: rural and urban. 
  • Under PMAY-Urban, 5,33,000 have been completed in 2018-19.  Under PMAY-Rural, 14,21,850 have been built in 2018-19. [xxii],[xxiii]

Health and Sanitation

Poor sanitation weakens the economic wherewithal of a poor household.  The Swachh Bharat Abhiyan aims to ensure health and sanitation. 

  • Swachh Bharat Mission: Swachh Bharat Mission (SBM) was launched on October 2, 2014 to achieve a clean and open defecation free India.  It has two components: SBM Urban and SBM Rural. [xxiv],[xxv]
  • Under SBM Urban, as of January 29, 2019, 24,130 individual household toilets have been constructed.[xxvi]
  • Under SBM Gramin, as of January 30, 2019, 919 lakh individual household toilets have been constructed (98.81% of target). [xxvii],[xxviii]

The government is committed to providing affordable and accessible healthcare to all its citizens, particularly the vulnerable groups.

  • Ayushmaan Bharat: In the General Budget 2018-19, the Government announced two major initiatives in health sector as a part of the Ayushman Bharat program.  These were: Health and Wellness Centres and the Pradhan Mantri Jan Arogya Yojana (PMJAY).[xxix]
  • Ayushmaan Bharat aims to create 1,50,000 health and wellness centres providing comprehensive primary healthcare. Rs 1200 crore has been allocated for this purpose.[xxx] PMJAY will cover over ten crore poor and vulnerable families. [xxxi]  It will provide coverage of up to five lakh rupees per family per year for secondary and tertiary care hospitalisation.  For the year 2018-19, Rs 3,125 crore has been allocated for this scheme.[xxxii]

Source: President’s Addresses 2014-2018; PRS.

For important highlights from the President’s address in 2019, please see here.  For a deeper analysis of the status of implementation of the announcements made in the President’s addresses from 2014 to 2018, please see here.

 

[i] “Press Note on First Advance Estimates of National Income: 2018-19”, Ministry of Statistics and Program Implementation, Press Information Bureau, http://www.mospi.gov.in/sites/default/files/press_release/Presss%20note%20for%20first%20advance%20estimates%202018-19.pdf.

[ii] “Second Advance Estimates of National Income, 2017-18”, Ministry of Statistics and Program Implementation, Press Information Bureau, http://pib.nic.in/newsite/PrintRelease.aspx?relid=176847

[iii] “Second Advance Estimates of National Income, 2016-17”, Ministry of Statistics and Program Implementation, Press Information Bureau, http://pib.nic.in/newsite/PrintRelease.aspx?relid=158734

[iv] Overview-Monetary Policy, Reserve Bank of India, https://www.rbi.org.in/scripts/FS_Overview.aspx?fn=2752

[v] “Foreign Exchange Reserves,”  Reserve Bank of India, January 25, 2019, https://www.rbi.org.in/Scripts/WSSView.aspx?Id=22729.

[vi] RBI Database, https://dbie.rbi.org.in/DBIE/dbie.rbi?site=home.

[vii] Table No.  160, Handbook of Statistics on the Indian Economy, Reserve Bank of India, https://www.rbi.org.in/Scripts/AnnualPublications.aspx?head =Handbook%20of%20Statistics%20on%20Indian%20Economy

[viii] Lok Sabha Unstarred Question No.  1319, Ministry of Finance, December 22, 2017, http://164.100.47.194/Loksabha/Questions/QResult15.aspx?qref=59329&lsno=16.

[ix] “The Fugitive Economic Offenders Bill, 2018”, PRS Legislative Research, March 16, 2018, http://www.prsindia.org/sites/default/files/bill_files/Fugitive%20Economic%20Offenders%20Bill%20-%20Bill%20Summary.pdf.

[x] “The Prevention of Corruption (Amendment) Bill”, PRS Legislative Research, February 12, 2014, http://www.prsindia.org/sites/default/files/bill_files/Bill_Summary-_Prevention_of_Corruption_1.pdf.

[xi] “GST roll-out – Complete transformation of the Indirect Taxation Landscape; Some minute details of how it happened, Ministry of Finance”, Press Information Bureau, June 30, 2017, http://pib.nic.in/newsite/PrintRelease.aspx?relid=167023.

[xii] Lok Sabha Unstarred Question No. 17, Ministry of Agriculture and Farmers Welfare, December 11, 2018, http://164.100.47.190/loksabhaquestions/annex/16/AS17.pdf.

[xiii] “Year End Review, Ministry of Labour and Employment”, December 18, 2017, http://www.pib.gov.in/PressReleseDetail.aspx?PRID=1512998.

[xiv] Rate of Minimum Wages, Ministry of Labour and Employment, March 1 2017, https://labour.gov.in/sites/default/files/MX-M452N_20170518_132440.pdf.

[xv] Gazette Number 173, Ministry of Labour and Employment, January 19, 2017, Gazette of India, http://egazette.nic.in/WriteReadData/2017/173724.pdf.

[xvi] “Union Cabinet approves Atal Mission for Rejuvenation and Urban Transformation and Smart Cities Mission to drive economic growth and foster inclusive urban development”, Press Information Bureau, April 29, 2015, http://pib.nic.in/newsite/PrintRelease.aspx?relid=119925.

[xvii] “Shillong (Meghalaya) gets selected as the 100th Smart City”, Ministry of Housing and Urban Poverty Alleviation, Press Information Bureau, June 20, 2018, http://pib.nic.in/newsite/PrintRelease.aspx?relid=180063

[xviii] “Year Ender- Ministry of Housing and Urban Affairs-2018”, Ministry of Housing and Urban Affairs, Press Information Bureau, December 31, 2018, http://pib.nic.in/PressReleseDetail.aspx?PRID=1557895.

[xix] PMGSY Guidelines, Ministry of Rural Development, last accessed on October 23, 2018. http://pmgsy.nic.in/.

[xx] “Implementation of PMGSY”, Ministry of Rural Development, Press Information Bureau, December 27, 2018, http://pib.nic.in/newsite/PrintRelease.aspx?relid=186837.

[xxi] Online Management, Monitoring and Accounting System (OMMAS), Pradhan Mantri, Gram Sadak Yojana, last accessed on October 23, 2018, http://omms.nic.in/Home/CitizenPage/#.

[xxii] High Level Physical Progress Report, PMAYG, Ministry of Rural Development, last accessed on January 25, 2019, https://rhreporting.nic.in/netiay/PhysicalProgressReport/physicalprogressreport.aspx

[xxiii] “Year Ender-6-PMAY-Ministry of Housing and Urban Affairs, 2018”, Press Information Bureau, December 27, 2018, http://pib.nic.in/PressReleseDetail.aspx?PRID=1557462.

[xxiv] “Swachh Bharat Mission needs to become a Jan Andolan with participation from every stakeholder: Hardeep Puri, 1,789 Cities have been declared ODF conference on PPP model for waste to energy projects”, Ministry of Housing and Urban Affairs, Press Information Bureau, November 30, 2017, http://pib.nic.in/newsite/PrintRelease.aspx?relid=173995.

[xxv] “PM launches Swachh Bharat Abhiyaan”, Prime Minister’s Office, Press Information Bureau, October 2, 2014, http://pib.nic.in/newsite/PrintRelease.aspx?relid=110247.

[xxvi] “Individual Household Latrine Application”, Ministry of Housing and Urban Affairs, last accessed on January 30, 2019, http://swachhbharaturban.gov.in/ihhl/RPTApplicationSummary.aspx.

[xxvii] “Individual Household Latrine Application”, Ministry of Housing and Urban Affairs, last accessed on January 30, 2019, http://swachhbharaturban.gov.in/ihhl/RPTApplicationSummary.aspx.

[xxviii] Swachh Bharat Mission (Gramin), Ministry of Drinking Water and Sanitation, last accessed on January 30, 2019, https://sbm.gov.in/sbmdashboard/Default.aspx.

[xxix] “Ayushman Bharat for a new India -2022, announced”, Ministry of Finance, Press Information Bureau, February 1, 2018,s http://pib.nic.in/newsite/PrintRelease.aspx?relid=176049

[xxx] About NHA, Ayushmaan Bharat, Ministry of Health and Family Welfare, https://www.pmjay.gov.in/about-nha.

[xxxi] “Ayushman Bharat –Pradhan Mantri Jan AarogyaYojana (AB-PMJAY) to be launched by Prime Minister Shri Narendra Modi in Ranchi, Jharkahnd on September 23, 2018”, Ministry of Health and Family Welfare, Press Information Bureau, September 22, 2018, http://pib.nic.in/newsite/PrintRelease.aspx?relid=183624.

[xxxii] National Health Accounts, estimates for 2014-15 Ministry of Health and Family Welfare, https://mohfw.gov.in/newshighlights/national-health-accounts-estimates-india-2014-15.