The National Telecom Policy was adopted by the cabinet on May 31, 2012.  It was released in public domain later in June.  Among other things, the policy aims to provide a single licence framework, un-bundle spectrum from licences, and liberalise spectrum. Previously, the central government had decided to unbundle spectrum and licenses for all future licences on January 29, 2011.  TRAI too in its recommendation dated May 11, 2010 and April 23, 2012 sought to de-link spectrum from licences.  The Supreme Court in the 2G judgment had held that spectrum should not be allocated on a first-cum-first-serve basis and should instead be auctioned.  In the April 23 recommendations, TRAI has detailed the mechanism for auctioning spectrum. TRAI has also recommended moving to a unified licence framework under which a single licence would be required to provide any telecom service.  It has also recommended that spectrum should be liberalised so that any technology could be used to exploit it. The new policy is in line with the government decisions and TRAI recommendations discussed above.  The policy also aims to achieve higher connectivity and quality of telecommunication services.  Its key features are detailed below.

  • Licensing:  Presently, as per the 2003 Amendment to the 1999 Telecom Policy, there are two forms of licences – Unified Service Licence (to provide any telegraph service in various geographical areas) and Unified Access Service Licence (to provide basic and cellular services in defined service areas).  The new policy targets simplification of licensing framework by establishing a unified license for all telecom services and conversion to a single-license system for the entire country.  It also seeks to remove roaming charges.
  • Spectrum:  As of now spectrum bands are reserved on the basis of technology that may be used to exploit them.  For instance, the 900 and 1800 bands are reserved for GSM technology and 800 for use of CDMA technology.  The new policy seeks to liberalise spectrum.  Further, spectrum would be de-linked from all future licenses.  Spectrum would be refarmed so that it is available to be used for new technology.  The policy aims to move to a system where spectrum can be pooled, shared and traded.  Periodic audits of spectrum usage would be conducted to ensure efficient utilization of spectrum.  The policy aims at making 300 MHz of additional spectrum available for mobile telecom services by the year 2017 and another 200 MHz by 2020.
  • Connectivity: The policy aims to increase rural tele-density from the current level of approximately 39% to 70% by 2017, and 100% by 2020.  It seeks to provide 175 million broadband connections by the year 2017 and 600 million by 2020 at a minimum 2 Mbps download speed.  Higher download speeds of 100 Mbps would be made available on demand.  Broadband access to all village panchayats would be made available by 2014 and to all villages by 2020.  The policy aims to recognise telecom, including broadband connectivity, as a basic necessity like education and health, and work towards the ‘Right to Broadband’.
  • Promotion of domestic industry: The policy seeks to incentivise and give preference to domestic telecom products in procurements that (i) have security implications for India; or (ii) are for the government’s own use.  It also seeks to establish a Telecom Finance Corporation to mobilise and channelise finances for telecom projects.
  • Legislations: The policy seeks to review the TRAI Act to remove impediments to effective functioning of TRAI.  It also seeks to review the Indian Telegraph Act, 1885.  The need to review the Indian Telegraph Act, 1885 was also recognised in the 1999 Telecom Policy.

The policy as adopted can be accessed here.

In Budget Session 2018, Rajya Sabha has planned to examine the working of four ministries.  The Ministry of Drinking Water and Sanitation is one of the ministries listed for discussion.  In this post, we look at the key schemes being implemented by the Ministry and their status.

What are the key functions of the Ministry of Drinking Water and Sanitation?

As per the Constitution, supply of water and sanitation are state subjects which means that states regulate and provide these services.  The Ministry of Drinking Water and Sanitation is primarily responsible for policy planning, funding, and coordination of programs for: (i) safe drinking water; and (ii) sanitation, in rural areas.  From 1999 till 2011, the Ministry operated as a Department under the Ministry of Rural Development.  In 2011, the Department was made an independent Ministry.  Presently, the Ministry oversees the implementation of two key schemes of the government: (i) Swachh Bharat Mission-Gramin (SBM-G), and (ii) National Rural Drinking Water Programme (NRDWP).

How have the finances and spending priorities of the Ministry changed over time?

In the Union Budget 2018-19, the Ministry has been allocated Rs 22,357 crore.  This is a decrease of Rs 1,654 crore (7%) over the revised expenditure of 2017-18.  In 2015-16, the Ministry over-shot its budget by 178%.  Consequently, the allocation in 2016-17 was more than doubled (124%) to Rs 14,009 crore.

In recent years, the priorities of the Ministry have seen a shift (see Figure 1).  The focus has been on providing sanitation facilities in rural areas, mobilising behavioural change to increase usage of toilets, and consequently eliminating open defecation.  However, this has translated into a decrease in the share of allocation towards drinking water (from 87% in 2009-10 to 31% in 2018-19).  In the same period, the share of allocation to rural sanitation has increased from 13% to 69%.Figure 1

What has been the progress under Swacch Bharat Mission- Gramin?

The Swachh Bharat Mission was launched on October 2, 2014 with an aim to achieve universal sanitation coverage, improve cleanliness, and eliminate open defecation in the country by October 2, 2019.

Expenditure on SBM-G:  In 2018-19, Rs 15,343 crore has been allocated towards SBM-G.  The central government allocation to SBM-G for the five year period from 2014-15 to 2018-19 has been estimated to be Rs 1,00,447 crore.  Of this, up to 2018-19, Rs 52,166 crore (52%) has been allocated to the scheme.  This implies that 48% of the funds are still left to be released before October 2019.  Figure 2

Construction of Individual Household Latrines (IHHLs):  For construction of IHHLs, funds are shared between the centre and states in the 60:40 ratio.  Construction of IHHLs account for the largest share of total expenditure under the scheme (97%-98%).  Although the number of toilets constructed each year has increased, the pace of annual growth of constructing these toilets has come down.  In 2015-16, the number of toilets constructed was 156% higher than the previous year.  This could be due to the fact that 2015-16 was the first full year of implementation of the scheme.  The growth in construction of new toilets reduced to 74% in 2016-17, and further to 4% in 2017-18.Table 1

As of February 2018, 78.8% of households in India had a toilet.  This implies that 15 crore toilets have been constructed so far.  However, four crore more toilets need to be construced in the next 20 months for the scheme to achieve its target by 2019.

Open Defecation Free (ODF) villages:  Under SBM-G, a village is ODF when: (i) there are no visible faeces in the village, and (ii) every household as well as public/community institution uses safe technology options for faecal disposal.  After a village declares itself ODF, states are required to carry out verification of the ODF status of such a village.  This includes access to a toilet facility and its usage, and safe disposal of faecal matter through septic tanks.  So far, out of all villages in the country, 72% have been verified as ODF.  This implies that 28% villages are left to be verified as ODF for the scheme to achieve its target by 2019.Table 2

Information, Education and Communication (IEC) activities:  As per the SBM-G guidelines, 8% of funds earmarked for SBM-G in a year should be utilised for IEC activities.  These activities primarily aim to mobilise behavioural change towards the use of toilets among people.  However, allocation towards this component has remained in the 1%-4% range.  In 2017-18, Rs 229 crore is expected to be spent, amounting to 2% of total expenditure.

What is the implementation status of the National Rural Drinking Water Programme?

The National Rural Drinking Water Programme (NRDWP) aims at assisting states in providing adequate and safe drinking water to the rural population in the country.  In 2018-19, the scheme has been allocated Rs 7,000 crore, accounting for 31% of the Ministry’s finances.Figure 3

Coverage under the scheme:  As of August 2017, 96% of rural habitations have access to safe drinking water.  In 2011, the Ministry came out with a strategic plan for the period 2011-22.  The plan identified certain standards for coverage of habitations with water supply, including targets for per day supply of drinking water.  As of February 2018, 74% habitations are fully covered (receiving 55 litres per capita per day), and 22% habitations are partially covered (receiving less than 55 litres per capita per day).  The Ministry aims to cover 90% rural households with piped water supply and 80% rural households with tap connections by 2022.  The Estimates Committee of Parliament (2015) observed that piped water supply was available to only 47% of rural habitations, out of which only 15% had household tap connections.

Contamination of drinking water:  It has been noted that NRDWP is over-dependant on ground water.  However, ground water is contaminated in over 20 states.  For instance, high arsenic contamination has been found in 68 districts of 10 states.  These states are Haryana, Punjab, Uttar Pradesh, Bihar, Jharkhand, Chhattisgarh, West Bengal, Assam, Manipur, and Karnataka.Table 3

Chemical contamination of ground water has also been reported due to deeper drilling for drinking water sources.  It has been recommended that out of the total funds for NRDWP, allocation for water quality monitoring and surveillance should not be less than 5%.  Presently, it is 3% of the total funds.  It has also been suggested that water quality laboratories for water testing should be set up throughout the country.