This post is pursuant to the discussion on population stabilization being held in Parliament currently. India is the second most populous country in the world, sustaining 16.7% of the world's population on 2.4% of the world's surface area. The population of the country has increased from 238 million in 1901 to 1,029 million in 2001. Even now, India continues to add about 26 million people per year. This is because more than 50% of the population is in the reproductive age group. India launched a family planning programme in 1952. Though the birth rate started decreasing, it was accompanied by a sharp decrease in death rate, leading to an overall increase in population. In 1976, the first National Population Policy was formulated and tabled in Parliament.  However, the statement was neither discussed nor adopted. The National Health Policy was then designed in 1983.  It stressed the need for ‘securing the small family norm, through voluntary efforts and moving towards the goal of population stabilization’.  While adopting the Health Policy, Parliament emphasized the need for a separate National Population Policy. This was followed by the National Population Policy in 2000. The immediate objective of the policy was to address the unmet needs for contraception, health care infrastructure and personnel, and to provide integrated service delivery for basic reproductive and child health care. The medium-term objective was to bring TFR (Total Fertility Rate - the average number of children a woman bears over her lifetime) to replacement levels by 2010. In the long term, it targeted a stable population by 2045, ‘at a level consistent with the requirements of sustainable economic growth, social development, and environmental protection.’ (See http://populationcommission.nic.in/npp.htm) Total Fertility Rate India’s TFR was around 6.1 in 1961.  This meant that an average woman bore over 6 children during her lifetime.  Over the years, there has been a noticeable decrease in this figure.  The latest National Family Health Survey (NFHS III, 2005-06) puts it at 2.7.  TFR is almost one child higher in rural areas (3.0) than in urban areas (2.1). TFR also varies widely across states.  The states of Andhra Pradesh, Goa, Himachal Pradesh, Karnataka, Kerala, Maharashtra, Punjab, Sikkim and Tamil Nadu have reached a TFR of 2.1 or less.  However, several other states like UP, Bihar, MP, Rajasthan, Orissa, Uttaranchal, Jharkhand and Chhattisgarh, where over 40% of the population lives, TFR is still high.  (See http://www.jsk.gov.in/total_fertility_rate.asp) Factors that affect population growth The overarching factor that affects population growth is low socio-economic development. For example, Uttar Pradesh has a literacy rate of 56%; only 14% of the women receive complete antenatal care. Uttar Pradesh records an average of four children per couple. In contrast, in Kerala almost every person is literate and almost every woman receives antenatal care. Kerala records an average of two children per couple. Infant mortality In 1961, the Infant Mortality Rate (IMR), deaths of infants per 1000 live births, was 115. The current all India average is much lower at 57. However, in most developed countries this figure is less than 5. IMR is the lowest at 15 in Kerala and the highest at 73 in Uttar Pradesh. Empirical correlations suggest that high IMR leads to greater desire for children. Early marriage Nationwide almost 43% of married women aged 20-24 were married before the age of 18. This figure is as high as 68% in Bihar. Not only does early marriage increase the likelihood of more children, it also puts the woman's health at risk. Level of education Fertility usually declines with increase in education levels of women. Use of contraceptives According to NFHS III (2005-06), only 56% of currently married women use some method of family planning in India. A majority of them (37%) have adopted permanent methods like sterilization. Other socio-economic factors The desire for larger families particularly preference for a male child also leads to higher birth rates. It is estimated that preference for a male child and high infant mortality together account for 20% of the total births in the country. Government initiatives The National Population Policy 2000 gave a focused approach to the problem of population stabilization. Following the policy, the government also enacted the Constitution (84th Amendment) Act, 2002. This Amendment extended the freeze on the state-wise allocation of seats in the Lok Sabha and the Rajya Sabha to 2026. It was expected that this would serve ‘as a motivational measure, in order to enable state governments to fearlessly and effectively pursue the agenda for population stabilization contained in the National Population Policy, 2000’. The National Commission on Population was formed in the year 2000. The Commission, chaired by the Prime Minister, has the mandate to review, monitor and give directions for implementation of the National Population Policy. The Jansankhya Sthirata Kosh (National Population Stabilization Fund) was setup as an autonomous society of the Ministry of Health and Family Welfare in 2005. Its broad mandate is to undertake activities aimed at achieving population stabilization. Programmes like the National Rural Health Mission, Janani Suraksha Yojana, ICDS (Integrated Child Development Services) etc. have also been launched by the government to tackle the healthcare needs of people. This is also expected to contribute to population stabilization. Free contraceptives are also being provided. In addition, monetary incentives are given to couples undertaking permanent family planning methods like vasectomy and tubectomy. Nutritional and educational problems are being targeted through programs like the mid-day meal scheme and the recently enacted Right to Education. ---------------- For more details on the issue, see the website of the National Population Stabilization Fund (http://www.jsk.gov.in/) Sources: Registrar General, India National Population Stabilization Fund National Commission on Population National Family Health Survey III (2005-06)

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.