Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector. The Kudankulam power plant will have two reactors. At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011. In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu). The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12. The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh. Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%). A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators. To view data in ascending or descending order, simply click the relevant column heading. (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /] Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery
The Parliamentary Standing Committee on Health and Family Welfare tabled a Report in Parliament on May 8, 2012, on the functioning of the Central Drugs Standard Control Organization (CDSCO). CDSCO is the agency mandated with the regulation of drugs and cosmetics in India. The Report covers various aspects of drug regulation including organizational structure and strength of CDSCO, approval of new drugs, and banning of drugs, among others. Following the Report, the Minister of Health and Family Welfare has constituted a Committee to look into the procedure for drug regulation. The Committee is expected to make its submissions within a period of two months. This post focuses on irregularities in the approval of new drugs by CDSCO. It discusses the regulations relating to drug approval and the Standing Committee's observations on the working of CDSCO. Approval of new drugs Drugs are regulated by the Drugs and Cosmetics Act, 1940 and Drugs and Cosmetic Rules, 1945 [Rules]. The CDSCO, under the Ministry of Health and Family Welfare, is the authority that approves new drugs for manufacture and import. State Drug Authorities are the licensing authorities for marketing drugs. New Drugs are defined as:
The Rules require an applicant for a new drug to conduct clinical trials in India to determine the drug’s safety and efficacy. These trials are necessary for both domestically manufactured and imported drugs. However, the authority can exempt a drug from the requirement of local and clinical trials in the public interest based on data available in other countries. Observations and recommendations of the Committee The Committee found that a total of 31 new drugs were approved between January 2008 and October 2010 without conducting clinical trials on Indian patients. The Report mentioned that drug manufacturers, CDSCO officials and medical experts colluded to approve drugs in violation of laws. Following are some of the Report’s findings: