Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector.  The Kudankulam power plant will have two reactors.  At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of  total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011.  In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu).  The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12.  The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh.  Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%).  A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators.  To view data in ascending or descending order, simply click the relevant column heading.  (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /]   Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery  

Criminal laws in India by way of “sanctions” allow for protective discrimination in favour of public officials.[1]  Under various laws, sanctions are required to investigate and prosecute public officials.  Over the past 15 years these provisions of law have been revisited by the judiciary and the legislature.  Recently the Supreme Court in the Subramanian Swamy Case has suggested the concept of a deemed sanction.  We look at the history of the requirement of sanction under criminal laws. Requirement of sanction to investigate certain public servants of the union government was introduced through a government notification[2].   The Criminal Procedure Code 1973 and the Prevention of Corruption Act 1988 provide that to prosecute a public servant, permission or sanction has to be secured from the government (central or state) for which the official works. Arguments that are often advanced in favour of such sanctions are that these ensure that (a) frivolous and vexatious cases are not filed, (b) public officials are not harassed, and (c) the efficacy of administrative machinery is not tampered with.  Further, the requirement of sanction to investigate was also defended by the government before the Supreme Court in certain cases.  In Vineet Narain vs. Union of India 1997[3], the government had argued that the CBI may not have the requisite expertise to determine whether the evidence was sufficient for filing a prima facie case.  It was also argued that the Act instituting the CBI, Delhi Special Police Establishment Act 1946 (DSPE Act), granted the power of superintendence, and therefore direction, of the CBI to the central government.   The Court in this case struck down the requirement of sanction to investigate.  It held that “supervision” by the government could not extend to control over CBI’s investigations.  As for prosecution, the Court affixed a time frame of three months to grant sanction.  However, there was no clarity on what was to be done if sanction was not granted within such time. Following that judgment, the DSPE Act was amended in 2003, specifically requiring the CBI to secure a sanction before it investigated certain public servants.  More recently, the Lokpal and Lokayukta Bill, 2011 that is pending before the Rajya Sabha, removed the requirement of sanction to investigate and prosecute public servants in relation to corruption. Recently, Mr. Subramanian Swamy approached the Supreme Court for directions on his request for sanction to prosecute Mr. A Raja in relation to the 2G Scam.  As per the Supreme Court, judgment in Subramanian Swamy vs. Dr. Manmohan Singh & Anr, Mr. Swamy’s request was pending with the department for over 16 months.  The Supreme Court held that denial of a timely decision on grant of sanction is a violation of due process of law (Right to equality before law read with Right to life and personal liberty).  The Court reiterated the three month time frame for granting sanctions.  It suggested that Parliament consider that in case the decision is not taken within three months, sanction would be deemed to be granted.  The prosecution would then be responsible for filing the charge sheet within 15 days of the expiry of this period.


[1] Subramanian Swamy vs. Dr. Manmohan Singh & Anr. Civil Appeal No. 1193 of 2012 dated January 31, 2012

[2] Single Directive, No. 4.7.3

[3] AIR 1998 SC 889