Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector.  The Kudankulam power plant will have two reactors.  At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of  total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011.  In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu).  The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12.  The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh.  Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%).  A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators.  To view data in ascending or descending order, simply click the relevant column heading.  (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /]   Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery  

The Lokpal and Lokayuktas Bill, 2011 was passed by Lok Sabha yesterday. The Bill will be discussed next by Rajya Sabha. Unlike the Lok Sabha, where the UPA government holds a majority in the House, the composition is different in Rajya Sabha. As on 28th December 2011, the total strength of Rajya Sabha is 243 members . The UPA has a combined strength of 95 members in the House, well below the 50% mark.  (Of course, there will be some absent members which will change the arithmetic a bit.)  The passage of the Bill thus depends on the stand taken by other political parties and their numbers in the House. Here's how the figures stack up:

Party Numbers
Indian National Congress (INC) 71
Dravida Munnetra Kazhagam (DMK) 7
Nationalist Congress Party (NCP) 7
All India Trinamool Congress (AITC) 6
Jammu and Kashmir National Conference 2
Sikkim Democratic Front (SDF) 1
Rashtriya Lok Dal (RLD) 1
Total UPA 95
   
Bharatiya Janata Party (BJP) 51
Janata Dal (United) 8
Shiv Sena (SS) 4
Shiromani Akali Dal (SAD) 3
Total NDA 66
   
Communist Party of India (Marxist) 13
Communist Party of India (CPI) 5
All India Forward Bloc (AIFB) 1
Total Left 19
   
Bahujan Samaj Party (BSP ) 18
Biju Janata Dal (BJD ) 6
All India Anna Dravida Munnetra Kazagham (AIADMK ) 5
Samajwadi Party (SP ) 5
Rashtriya Janata Dal (RJD ) 4
   
Asom Gana Parishad (AGP ) 2
Bodoland People's Front (BPF ) 1
Indian National Lok Dal (INLD ) 1
Lok Janasakti Party (LJP ) 1
Mizo National Front (MNF ) 1
Nagaland People's Front (NPF ) 1
Telugu Desam Party (TDP ) 4
   
Nominated 8
Independent and others 6
   
Total 243