Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector.  The Kudankulam power plant will have two reactors.  At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of  total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011.  In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu).  The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12.  The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh.  Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%).  A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators.  To view data in ascending or descending order, simply click the relevant column heading.  (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /]   Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery  

The Chief Minister of Kerala has made a statement in the Assembly this week agreeing to look into the demand to change the name of the state to Keralam to make it conform to the state's name as pronounced in Malayalam.  A few major cities in Kerala have already been renamed in the recent past in an attempt to erase the Anglican influence in their naming. Another proposal to rename the state of Orissa to Odisha has recently been approved by the Union Cabinet. This is part of a trend that gained momentum after the renaming of Bombay, Madras and Calcutta.  Bombay was renamed Mumbai - derived from name of Goddess Mumbadevi - in1995 when the Shiv Sena - BJP combine won the state Assembly elections.  In the following year Madras was renamed to Chennai and in 2001 Calcutta was renamed Kolkata. The renaming of a state requires Parliamentary approval under Article 3 and 4 of the Constitution, and the President has to refer the same to the relevant state legislature for its views. However, the change in name of official language would require a constitutional amendment since it requires a change in the 8th schedule. In the case of Orissa, the state legislature has approved in August 2008, change to the name of Orissa to Odisha and the name of its official language from Oriya to Odia. The central cabinet approved the proposal, and 2 bills The Orissa (Alteration of name) Bill, 2010 and the Constitution (113th Amendment) Bill has been introduced in Parliament.