The Budget session 2013 commenced with the President, Pranab Mukherjee, addressing Parliament on February 21, 2013.  The address is a statement of the policy of the government.  Yesterday a Motion of Thanks was moved in the Lok Sabha and a detailed discussion took place on the President’s address.  (The significance of the President’s speech has been discussed in an article published in the Indian Express.) Below are some legislative and policy items from the agenda of the central government outlined in the speech.

  • Amend the Prevention of Corruption Act to punish the guilty and protect the honest public servants more effectively.
  • The Direct Benefits Transfer system has been launched to enable government sponsored benefits such as scholarships, pensions and maternity benefits to be deposited in the beneficiaries Aadhaar linked accounts. This will be expanded to cover wages and subsidies on food and LPG. This system will not substitute public services and will be complementary to the Public Distribution System.
  • In a bid to promote Micro, Small & Medium Enterprises, 20% of all government procurement is required to be from Micro and Small Enterprises.
  • The coverage under the Mid-day Meal Programme to be expanded to pre-primary schools.
  • Godown storage capacity of 181 lakh tons will be created between 2013 and 2015 across the country with additional storage space of 5.4 lakh tons in the North East.
  • A Rural Water Supply and Sanitation Project for Low Income States, estimated at nearly Rs 5000 crore, is being developed to assist States that are lagging behind in the coverage of piped water supply.
  • Two and a half lakh gram panchayats will be connected with broadband facility under the National Optical Fibre Network project by December 2014.
  • A shift in central funding to states for higher education through a new programme called the Rashtriya Uchchatar Shiksha Abhiyan is being considered.
  • The government proposes to establish two new major ports at Sagar Island, West Bengal and the other in Andhra Pradesh, with a total additional capacity of around 100 Million Tonnes Per Annum (MTPA).  ‘In-principle’ approval has been given for setting up an airport at Aranmula (Kerala) apart from airports at Navi Mumbai, Mopa (Goa) and Kannur (Kerela).
  • In 2012-13, 2600 km of roads are expected to be constructed and contracts for 3000 km of new roads are expected to be awarded. A new approach to road construction, the EPC mode, has been put in place. A length of 2900 km of highways will be put under the Operate, Maintain and Transfer system, which will improve road maintenance.

Legislative and policyagenda outlined in President’s addresses between 2009-2012 and their  status

Legislation/Policy

Status

Legislations mentioned in the President’s Address between 2009-12

  To be introduced
Goods and Services Tax Constitutional Amendment Bill introduced
The National Food Security Bill Introduced
Amend the Land Acquisition Act and enact the Rehabilitation and Resettlement Bill Introduced
Sexual Harassment of Women at Workplace (Prevention Prohibition and Redressal) Bill Passed
The Whistleblower Bill Pending
The Judicial Standards and Accountability Bill Pending
The Lokpal and Lokayuktas Bill Pending
A model Public Services Law (to cover officials providing important social services and commits them to their duties) Two bills introduced: the Electronic Services Delivery Bill and the Citizen’s Charter Bill
The Right to Free and Compulsory Education Bill Passed
The National Council for Higher Education Bill Introduced
Foreign Educational Institutions Bill Introduced
Protection of Children from Sexual Offences Bill Passed
The Women’s Reservation Bill Pending
The Mines and Minerals (Development and Regulation) Bill Introduced
The Public Procurement Bill Introduced
The General Anti-Avoidance Rules Scheduled for 2016[1]
Amend of RTI Act (to provide for disclosure by government in all non-strategic areas) To be introduced

Policy items mentioned in the President’s Addresses between 2009-2012

National Mission for Female Literacy – all women to be literate by 2013-14 National Literacy Mission recast in September 2009 to focus on female literacy; as per 2011 census the female literacy rate in India is 65.46%[2]
Disposal of remaining claims in 2010 under the Scheduled Tribes and Other Traditional Forest Dwellers Act As on February 28, 2010, 27.16 lakh claims had been filed, 7.59 lakh titles had been distributed and 36,000 titles were ready for distribution;[3] as on July 31, 2012, the number of claims filed for the recognition of forest rights and titles distributed are 32.28 lakh and 12.68 lakh respectively[4]
Introduction of Minimum Support Price (MSP) for Minor Forest Produce (MFP) being considered Based on the recommendations of the Committee constituted by Ministry of Panchayati Raj to look into aspects of MSP, Value addition and marketing of MFP in Fifth Schedule Areas, a Central Sector Scheme of MSP for MFP has been contemplated[5]
Voting rights for Indian citizens living abroad Bill passed; NRIs can vote at the place of residence mentioned in their passport
12th Plan target growth 9% with 4% growth for the agricultural sector GDP grew by 5.4% and the agriculture sector by 1.8% in the first half of the current fiscal year (2012-13)
Establish national investment and manufacturing zones to promote growth in manufacturing Under the National Manufacturing Policy, 12 National Investment and Manufacturing Zones are notified, 8 of them along the Delhi Mumbai Industrial Corridor and 4 others at Nagpur, Tumkur, Chittor and Medak
Strengthening public accountability of flagship programmes by the creation of an Independent Evaluation Office. Government has approved setting up of an Independent Evaluation Office and the Governing Board will be chaired by Deputy Chairman, Planning Commission
Unique Identity Card scheme to be implemented by 2011-12 Bill to give statutory status pending in Parliament; enrollment until February 2013 is approximately 28 crore[6]
Establishment of National Counter-Terrorism Centre Proposed launch of NCTC in March 2011 on hold as consultation with states is on; meeting held by the union government with the Chief Ministers of all the States in May 2012
Conversion of analog cable TV system to digital by December 2014 Government has implemented the first phase of digitization in Kolkata, Delhi, Chennai and Mumbai; by March 31, 2013, 38 cities with a population of more than one million will be covered
A roadmap for judicial reform to be outlined by the end of 2009 and implemented in a time-bound manner Vision statement formulated in 2009 outlining road map for improving justice delivery and legal reforms and steps to reduce pendency in Courts; setting up of a National Mission for the Delivery of Justice and Legal Reforms to improve court administration and reduce pendency was approved in June 2011

*Introduced means introduced in one House; Pending means passed by one House and pending in the other House; Passed means passed by both Houses of Parliament.


[1] “Major Recommendations of Expert Committee on GAAR Accepted”, Press Information Bureau, Ministry of Finance, January 14, 2013.

[2] Lok Sabha, Starred Question No. 175, December 5, 2012, Ministry of Human Resource Development.

[3] Lok Sabha, Unstarred Question No. 2672, March 12, 2010, Ministry of Tribal Affairs.

[4] Lok Sabha, Starred Question No. 108, August 17, 2012, Ministry of Tribal Affairs.

[5] “PM approves Constitution of National Council for Senior Citizens”, Press Information Bureau, February 1, 2012, Prime Minister’s Office.

[6] https://portal.uidai.gov.in/uidwebportal/dashboard.do

Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.