The Budget session 2013 commenced with the President, Pranab Mukherjee, addressing Parliament on February 21, 2013.  The address is a statement of the policy of the government.  Yesterday a Motion of Thanks was moved in the Lok Sabha and a detailed discussion took place on the President’s address.  (The significance of the President’s speech has been discussed in an article published in the Indian Express.) Below are some legislative and policy items from the agenda of the central government outlined in the speech.

  • Amend the Prevention of Corruption Act to punish the guilty and protect the honest public servants more effectively.
  • The Direct Benefits Transfer system has been launched to enable government sponsored benefits such as scholarships, pensions and maternity benefits to be deposited in the beneficiaries Aadhaar linked accounts. This will be expanded to cover wages and subsidies on food and LPG. This system will not substitute public services and will be complementary to the Public Distribution System.
  • In a bid to promote Micro, Small & Medium Enterprises, 20% of all government procurement is required to be from Micro and Small Enterprises.
  • The coverage under the Mid-day Meal Programme to be expanded to pre-primary schools.
  • Godown storage capacity of 181 lakh tons will be created between 2013 and 2015 across the country with additional storage space of 5.4 lakh tons in the North East.
  • A Rural Water Supply and Sanitation Project for Low Income States, estimated at nearly Rs 5000 crore, is being developed to assist States that are lagging behind in the coverage of piped water supply.
  • Two and a half lakh gram panchayats will be connected with broadband facility under the National Optical Fibre Network project by December 2014.
  • A shift in central funding to states for higher education through a new programme called the Rashtriya Uchchatar Shiksha Abhiyan is being considered.
  • The government proposes to establish two new major ports at Sagar Island, West Bengal and the other in Andhra Pradesh, with a total additional capacity of around 100 Million Tonnes Per Annum (MTPA).  ‘In-principle’ approval has been given for setting up an airport at Aranmula (Kerala) apart from airports at Navi Mumbai, Mopa (Goa) and Kannur (Kerela).
  • In 2012-13, 2600 km of roads are expected to be constructed and contracts for 3000 km of new roads are expected to be awarded. A new approach to road construction, the EPC mode, has been put in place. A length of 2900 km of highways will be put under the Operate, Maintain and Transfer system, which will improve road maintenance.

Legislative and policyagenda outlined in President’s addresses between 2009-2012 and their  status

Legislation/Policy

Status

Legislations mentioned in the President’s Address between 2009-12

  To be introduced
Goods and Services Tax Constitutional Amendment Bill introduced
The National Food Security Bill Introduced
Amend the Land Acquisition Act and enact the Rehabilitation and Resettlement Bill Introduced
Sexual Harassment of Women at Workplace (Prevention Prohibition and Redressal) Bill Passed
The Whistleblower Bill Pending
The Judicial Standards and Accountability Bill Pending
The Lokpal and Lokayuktas Bill Pending
A model Public Services Law (to cover officials providing important social services and commits them to their duties) Two bills introduced: the Electronic Services Delivery Bill and the Citizen’s Charter Bill
The Right to Free and Compulsory Education Bill Passed
The National Council for Higher Education Bill Introduced
Foreign Educational Institutions Bill Introduced
Protection of Children from Sexual Offences Bill Passed
The Women’s Reservation Bill Pending
The Mines and Minerals (Development and Regulation) Bill Introduced
The Public Procurement Bill Introduced
The General Anti-Avoidance Rules Scheduled for 2016[1]
Amend of RTI Act (to provide for disclosure by government in all non-strategic areas) To be introduced

Policy items mentioned in the President’s Addresses between 2009-2012

National Mission for Female Literacy – all women to be literate by 2013-14 National Literacy Mission recast in September 2009 to focus on female literacy; as per 2011 census the female literacy rate in India is 65.46%[2]
Disposal of remaining claims in 2010 under the Scheduled Tribes and Other Traditional Forest Dwellers Act As on February 28, 2010, 27.16 lakh claims had been filed, 7.59 lakh titles had been distributed and 36,000 titles were ready for distribution;[3] as on July 31, 2012, the number of claims filed for the recognition of forest rights and titles distributed are 32.28 lakh and 12.68 lakh respectively[4]
Introduction of Minimum Support Price (MSP) for Minor Forest Produce (MFP) being considered Based on the recommendations of the Committee constituted by Ministry of Panchayati Raj to look into aspects of MSP, Value addition and marketing of MFP in Fifth Schedule Areas, a Central Sector Scheme of MSP for MFP has been contemplated[5]
Voting rights for Indian citizens living abroad Bill passed; NRIs can vote at the place of residence mentioned in their passport
12th Plan target growth 9% with 4% growth for the agricultural sector GDP grew by 5.4% and the agriculture sector by 1.8% in the first half of the current fiscal year (2012-13)
Establish national investment and manufacturing zones to promote growth in manufacturing Under the National Manufacturing Policy, 12 National Investment and Manufacturing Zones are notified, 8 of them along the Delhi Mumbai Industrial Corridor and 4 others at Nagpur, Tumkur, Chittor and Medak
Strengthening public accountability of flagship programmes by the creation of an Independent Evaluation Office. Government has approved setting up of an Independent Evaluation Office and the Governing Board will be chaired by Deputy Chairman, Planning Commission
Unique Identity Card scheme to be implemented by 2011-12 Bill to give statutory status pending in Parliament; enrollment until February 2013 is approximately 28 crore[6]
Establishment of National Counter-Terrorism Centre Proposed launch of NCTC in March 2011 on hold as consultation with states is on; meeting held by the union government with the Chief Ministers of all the States in May 2012
Conversion of analog cable TV system to digital by December 2014 Government has implemented the first phase of digitization in Kolkata, Delhi, Chennai and Mumbai; by March 31, 2013, 38 cities with a population of more than one million will be covered
A roadmap for judicial reform to be outlined by the end of 2009 and implemented in a time-bound manner Vision statement formulated in 2009 outlining road map for improving justice delivery and legal reforms and steps to reduce pendency in Courts; setting up of a National Mission for the Delivery of Justice and Legal Reforms to improve court administration and reduce pendency was approved in June 2011

*Introduced means introduced in one House; Pending means passed by one House and pending in the other House; Passed means passed by both Houses of Parliament.


[1] “Major Recommendations of Expert Committee on GAAR Accepted”, Press Information Bureau, Ministry of Finance, January 14, 2013.

[2] Lok Sabha, Starred Question No. 175, December 5, 2012, Ministry of Human Resource Development.

[3] Lok Sabha, Unstarred Question No. 2672, March 12, 2010, Ministry of Tribal Affairs.

[4] Lok Sabha, Starred Question No. 108, August 17, 2012, Ministry of Tribal Affairs.

[5] “PM approves Constitution of National Council for Senior Citizens”, Press Information Bureau, February 1, 2012, Prime Minister’s Office.

[6] https://portal.uidai.gov.in/uidwebportal/dashboard.do

By Rohit & Anirudh A modified 'Modernization of State Police Forces' scheme was started by the central government in 2000-01. One of the objectives was to help police forces in meeting the emerging challenges to internal security in the form of terrorism, naxalism etc. The scheme aims to modernize police forces in terms of:

  • Mobility (including purchase of bullet proof and mine proof vehicles)
  • Weaponry
  • Communication Systems
  • Training
  • Forensic Science Laboratory/ Finger Printing Bureau
  • Equipments
  • Buildings

Under this scheme, States have been clubbed into different categories and Centre-State cost sharing is category specific. Since 2005-06, States have been categorized as category ‘A’ and ‘B’ with 100% and 75% Central funding respectively. All the North Eastern States, namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura and Sikkim have been placed in category ‘A’ and thus, are entitled to receive 100% Central assistance for implementation of their annual approved plans. Recently, CAG decided to evaluate the working of the scheme and commissioned ‘performance audit’ reviews covering select general category and special category States. Each review covers a contiguous five year period between 2000 and 2007, but varies across selected states. For the periods under review, each state had a plan outlay (the total amount proposed to be spent in modernizing the state's police forces). However, in most cases, the actual release of funds fell significantly short of this outlay - in some cases the Centre did not contribute its share, in others the States lagged behind. For instance, in the case of Bihar, the Centre released only 56% of its share; while in the case of Rajasthan and West Bengal, the States did not release any funds at all. The graph below shows the actual releases by the Centre and the States (as percentages of their share in the proposed outlays): Further, even the funds that were released were not fully utilized. Thus, the amount finally spent fell significantly short of the initial proposal. The graph below shows the actual expenditure by State: Following are some of the other main findings from the CAG report:

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the MHA were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent money on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan.

c) Jharkhand – District Control rooms remained non-functional because of shortage of manpower.

Weapons

§ Police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the Ministry of Home Affairs (MHA) were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent Rs 32 crore on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones, and no additions were made.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles. 203 ambassador cars were procured, though only 55 were approved by the MHA.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy. Satisfaction levels with the housing provided were also very low.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan, and only 1045 units were completed by 2006.

c) Jharkhand – District Control rooms remained non-functional even after spending Rs 2 crore because of shortage of manpower.

Weapons

§ It was observed that the police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.