Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

Recently, Delhi witnessed large scale protests by various groups demanding stricter punishment and speedier trial in cases of sexual assault against women.  In light of the protests, the central government has constituted a Commission (headed by Justice Verma) to suggest possible amendments in the criminal law to ensure speedier disposal of cases relating to sexual assault.  Though the Supreme Court, in 1986, had recognised speedy trial to be a fundamental right, India continues to have a high number of pending cases. In 2012, the net pendency in High Courts and subordinate courts decreased by over 6 lakh cases. However, there is still a substantial backlog of cases across various courts in the country.  As per the latest information given by the Ministry of Law and Justice, there are 43.2 lakh cases pending in the High Courts and 2.69 crore cases pending in the district courts.[1]

After the recent gang-rape of a 23 year old girl, the Delhi High Court directed the state government to establish five Fast Track Courts (FTCs) for the expeditious adjudication of cases relating to sexual assault.   According to a news report, other states such as Maharashtra and Tamil Nadu have also begun the process of establishing FTCs for rape cases.  In this blog, we look at the status of pending cases in various courts in the country, the number of vacancies of judges and the status of FTCs in the country. Vacancies in the High Courts and the Subordinate Courts One of the reasons for the long delay in the disposal of cases is the high number of vacancies in position for judges in the High Courts and the District Courts of the country.  As of December 1, 2012, the working strength of the High Court judges was 613 as against the sanctioned strength of 895 judges.  This reflects a 32% vacancy of judges across various High Courts in the country.  The highest number of vacancies is in the Allahabad High Court with a working strength of 86 judges against the sanctioned strength of 160 judges (i.e. vacancy of 74 judges).   The situation is not much better at the subordinate level.  As on September 30, 2011, the sanctioned strength of judges at the subordinate level was 18,123 judges as against a working strength of 14,287 judges (i.e. 21% vacancy).  The highest vacancy is in Gujarat with 794 vacancies of judges, followed by Bihar with 690 vacancies. Fast Track Courts The 11th Finance Commission had recommended a scheme for the establishment of 1734 FTCs for the expeditious disposal of cases pending in the lower courts.  In this regard, the Commission had allocated Rs 500 crore.   FTCs were to be established by the state governments in consultation with the respective High Courts.  An average of five FTCs were to be established in each district of the country.  The judges for these FTCs were appointed on an adhoc basis.  The judges were selected by the High Courts of the respective states.  There are primarily three sources of recruitment.  First, by promoting members from amongst the eligible judicial officers; second, by appointing retired High Court judges and third, from amongst members of the Bar of the respective state. FTCs were initially established for a period of five years (2000-2005).  However, in 2005, the Supreme Court[2] directed the central government to continue with the FTC scheme, which was extended until 2010-2011.  The government discontinued the FTC scheme in March 2011.  Though the central government stopped giving financial assistance to the states for establishing FTCs, the state governments could establish FTCs from their own funds.  The decision of the central government not to finance the FTCs beyond 2011 was challenged in the Supreme Court.  In 2012, the Court upheld the decision of the central government.[3]  It held that the state governments have the liberty to decide whether they want to continue with the scheme or not.  However, if they decide to continue then the FTCs have to be made a permanent feature. As of September 3, 2012, some states such as Arunachal Pradesh, Assam, Maharashtra, Tamil Nadu and Kerala decided to continue with the FTC scheme.  However, some states such as Haryana and Chhattisgarh decided to discontinue it. Other states such as Delhi and Karnataka have decided to continue the FTC scheme only till 2013.[4]

Table 1: Number of Fast Track Courts and the pending cases in FTCs                     (As on March 31, 2011)

State No of FTC No of cases transferred until March 31, 2011 Pending cases
Arunachal Pradesh 3 4,162 2,502
Bihar` 179 2,39,278 80,173
Assam 20 72,191 16,380
West Bengal 109 1,46,083 32,180
Goa 5 5,096 1,079
Punjab 15 58,570 12,223
Jharkhand 38 1,10,027 22,238
Gujarat 61 5,37.636 1,03,340
Chattisgarh 25 9,4670 18,095
Meghalaya 3 1,031 188
Rajasthan 83 1,49,447 26,423
Himachal Pradesh 9 40,126 6,699
Karnataka 87 2,18,402 34,335
Andhra Pradesh 108 2,36,928 36,975
Nagaland 2 845 129
Kerala 38 1,09,160 13,793
Mizoram 3 18,68 233
Haryana 6 38,359 4,769
Madhya Pradesh 84 3,60,602 43,239
UP 153 4,64,775 53,117
Maharashtra 51 4,23,518 41,899
Tamil Nadu 49 4,11,957 40,621
Uttarakhand 20 98,797 9006
Orissa 35 66,199 5,758
Manipur 2 3,059 198
Tripura 3 5,812 221
Total 1192 3898598 6,05,813

Sources:  Lok Sabha Unstarred Question No.498, March 3, 2012; PRS

 


[1].  Rajya Sabha Starred Question no 231 dated December 10, 2012.

[2].  Brij Mohan Lal v Union of India (2005) 3 SCR 103.

[3].  Brij Mohan Lal v Union of India (2012) 6 SCC 502. [4].  Rajya Sabha Unstarred Question no 2388 dated September 3, 2012.