Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.