Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

Listed below are some key Bills pending in Parliament that are expected to address various aspects of corruption in India. These Bills need to be scrutinized carefully by both lawmakers and citizens alike, so as the strengthen them. Citizen groups can engage in a variety of ways to get their views heard, which have been described in the primer on Engaging with Policy Makers. Some of these anti-corruption Bills are listed in the current Winter Session for consideration and passing. These are marked in red below. (The full list of all Bills being considered in the Winter Session can be accessed here.) Each Bill below has been hyperlinked to a page which has the text of the Bill, the report of the Standing Committee, PRS analysis, and other relevant documents, all in one place. Spreading this message to a number of interested people will be a very useful contribution by all those interested in building greater engagement of people with what happens in Parliament.  

Bill

Date of introduction

Status

Brief description

The Lokpal and Lokayuktas Bill, 2011 (Listed for passing) December 22, 2011 Passed by Lok Sabha on 27 Dec 2011. Report of Rajya Sabha Select Committee submitted on November 23, 2012. It seeks to establish the office of the Lok Pal at the centre and Lokayuktas in states for inquiring into complaints against certain public servants.The Bill once passed shall be applicable to states if they give their consent to its application.
The Whistle Blowers Protection Bill, 2011 (Listed for passing) August 26, 2010 Passed by Lok Sabha on December 27, 2011. Pending in Rajya Sabha It seeks to protect whistleblowers (person making a disclosure related to acts of corruption, misuse of power or criminal offence).Under the Bill any person including a public servant may make such a disclosure to the Central or State Vigilance Commission.The identity of the complainant shall not be disclosed.
The Benami Transactions (Prohibition) Bill, 2011 August 18, 2011 Standing Committee submitted its Report on June 26, 2012 The Bill prohibits all persons from entering into benami transactions (property transactions in the name of another person).Any benami property shall be confiscated by the central government.It seeks to replace the existing Benami Transactions (Prohibition) Act, 1988.
The Prevention of Bribery of Foreign Public Officials and Officials of Public International Organisations Bill, 2011 (Listed for passing) March 25, 2011 Standing Committee  submitted its Report on March 29, 2012 Indiais a signatory to the UN Convention against corruption. The Bill is necessary for India to ratify the Convention.The Bill makes it an offence to accept or offer a bribe to foreign public officials and officials of public international organizations in order to obtain or retain international business
The Right of Citizens for Time Bound Delivery of Goods and Services and Redressal of their Grievances Bill, 2011 December 20, 2011 Standing Committee submitted its Report on August 28, 2012 It requires every public authority to publish a citizen charter within six months of commencement of the Act.The charter should detail the goods and services to be provided and the timeline for their delivery.
The Electronic Delivery of Services Bill, 2011 December 27, 2011 Standing Committee submitted its Report on August 30, 2012 The Bill requires all public authorities to deliver all public services electronically within a maximum period of eight years.There are two exceptions to this requirement: (a) service which cannot be delivered electronically; and (b) services that the public authorities in consultation with the respective Central and State EDS Commissions decide not to deliver electronically.
The Prevention of Money-Laundering (Amendment) Bill, 2011 (Listed for passing) December 27, 2011 Standing Committee submitted its Report on May 9, 2012 The Bill Amends the Prevention of Money Laundering Act, 2002.This Bill widens the definition of offences under money laundering to include activities like concealment, acquisition, possession and use of proceeds of crime.It provides for the provisional attachment and confiscation of property (for a maximum period of 180 days).
The National Identification Authority of India Bill, 2010 December 3, 2010 Standing Committee  submitted its Report on December 13,  2011 The Bill seeks to establish the National Identification Authority of India to issue unique identification numbers (called ‘Aadhaar’) to residents ofIndia.Every person residing inIndia(regardless of citizenship) is entitled to obtain an Aadhaar number after furnishing the required information.The number shall serve as an identity proof.  But not as a citizenship proof.
The Judicial Standards and Accountability Bill, 2010 December 1, 2010 Passed by Lok Sabha on March 29, 2012; Pending in Rajya Sabha It replaces the Judges (Inquiry) Act, 1968.  It provides for enforceable standards for the conduct of High Court and Supreme Court judges.The Bill requires judges and their spouses and children to declare their assets and liabilities.  It also establishes a process for the removal of judges of Supreme Court and High Court
The Public Procurement Bill, 2012 May 14, 2012 Standing Committee Report pending The Bill seeks to regulate and ensure transparency in the procurement process.  It applies to procurement processes above Rs 50 lakh.The procuring entity shall adhere to certain standards such as (a) ensuring efficiency and economy; and (b) provide fair and equitable treatment to bidders.

Sources: Respective Bills, PRS Legislative Research