Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

We wrote an FAQ on the Lok Pal Bill for Rediff.  See http://www.rediff.com/news/slide-show/slide-show-1-all-you-wanted-to-know-about-the-lokpal-bill/20110808.htm The full text is reproduced below. What is the purpose of the Lok Pal Bill? The Bill seeks to establish an institution that will inquire into allegations of corruption against certain public functionaries.  It establishes the office of the Lok Pal for this purpose.   What is the composition of the Lok Pal? The Lok Pal shall consist of a Chairperson and up to eight members.  The Chairperson, and at least half of the members have to be current or former judges of the Supreme Court or Chief Justices of High Courts.  The other members will have at least 25 years experience in matters related to anti-corruption policy, vigilance, public administration, finance, law and management.   Who selects the Lok Pal? The Selection Committee consists of the Prime Minister, Lok Sabha Speaker, the Leader of Opposition in each House of Parliament, a Union Cabinet Minister, a sitting Supreme Court Judge, a sitting High Court Chief Justice, an eminent jurist, a person of eminence in public life.  The two judges on this Committee will be nominated by the Chief Justice of India.   Who comes under the jurisdiction of the Lok Pal? There are seven categories of persons under the Lok Pal: (a) Prime Minister after demitting office; (b) current and former Ministers; (c) current and former MPs (d) all Group A officers of the central government; (e) all Group A equivalent officers or PSUs and other government bodies; (f) directors and officers of NGOs which receive government financing; (g) directors and officers of NGOs which receive funds from the public, and have annual income above a level to be notified by the government. The speech and vote of MPs in Parliament are exempt from the purview of the Lok Pal.   What are the major powers of the Lok Pal? The Lok Pal has two major wings: investigation wing and prosecution wing.  The Lok Pal can ask the investigation wing to conduct preliminary investigation of any offence alleged to be committed under the Prevention of Corruption Act, 1988.  It can then conduct an inquiry.  If the inquiry concludes that an offence was committed, the Lok Pal can recommend disciplinary action.  It can also file a case in the Special Court.   Does the Lok Pal need any prior sanction to initiate any action? No.  The Bill states that the Lok Pal does not need prior sanction to inquire into an offence, or to initiate prosecution in the special court.   What are special courts under this Bill? The central government is required to constitute special courts to hear and decide cases under this Bill.  The Lok Pal shall recommend the number of such courts.   What are the various time limits for conducting inquiry and trial? All preliminary investigation or inquiry must be completed within 30 days of the complaints (and can be extended for a further three months, with written reasons).  The inquiry is to be completed within six months (extendable by six months).  The trial is to be completed within one year of filing the case.  This time may be extended by three months (and in further periods of three months each time) with written reasons, but the total time should not exceed two years.   How can the Lok Pal be removed from office? The President may make a reference to the Supreme Court, (a) either on his own, or (b) if 100 MPs sign a petition, or (c) if a citizen makes a petition and the President is satisfied that it should be referred.  If the Supreme Court, after an inquiry, finds the charge of misbehaviour was valid against the Chairperson or a Member and recommends removal, he shall be removed by the President.   What are the provisions for the expenses of the Lok Pal? The Bill provides that all expenses will be charged, i.e., the amount will be provided without requiring a vote in Parliament.  The Bill estimates recurring expenditure of Rs 100 crore per annum, and a non-recurring expenditure of Rs 50 crore.  It also estimates a further Rs 400 crore for a building.   What are the major differences from the Jan Lok Pal Bill drafted by Team-Anna? There are several differences.  The composition of the Lok Pal and the selection process are different; the Jan Lok Pal draft included a search committee with civil society members to shortlist the eligible members of the Lok Pal.  The Lok Pal had jurisdiction over the PM, the judiciary and all public servants (only Group A officers in the government Bill); it included the speech and vote of MPs in Parliament; it did not include NGOs.  The Jan Lok Pal Bill provided that the investigation and prosecution wings of the CBI shall report to the Lok Pal for corruption cases.  It also had penalties ranging from six months to life imprisonment (under the government Bill, the maximum imprisonment is derived from the Prevention of Corruption Act, 1988, and is 7 years).