Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

The Department of Land Resources in the Ministry of Rural Development has released a draft version of The Land Titling Bill, 2011 on its website. This draft is a major revision of the original draft Bill released in 2010. Public comments on this draft are invited before June 24, 2011. A copy of the draft can be found here. The Bill provides for the registration of all immovable property to establish a system of conclusive, electronically recorded titles. It also provides for a mechanism to invite objections and for the resolution of disputes through special tribunals. The property record will be considered as conclusive ownership by the person mentioned. This will help resolve uncertainties in property transactions. Given that land is a state subject, the Bill is meant to be a model law for adoption by the states individually.  The framework of the bill is explained below. I. Land Titling Authority and Preparation of Records The Bill establishes a Land Titling Authority at the State level. The Authority’s task is to prepare a record of all immovable properties in its jurisdiction. These records will contain (a) survey data of boundaries of each property; (b) a unique identification number for each property, which may be linked to a UID number; (c) any record created by an officer of the state or UT government authorised by the laws of that state to make such records; and (d) a record of Title over each property. II. Title Registration Officer and Registration Process The Bill provides for the government to create Title Registration Offices at various places, and for a Title Registration Officer (TRO) to function under the supervision of the Land Titling Authority.  The TRO will have powers of a civil court and is charged with the task of creating e a Register of Titles. Steps for the registering of titles include: (a) notification of available land records data by the TRO, (b) invitation to persons with interest in such properties to make objections to the data, and (c) registration of properties by the TRO for which no dispute is brought to his notice in writing. In the case the absoluteness of the title to a property is disputed, the TRO will make an entry into the Register of Titles to that effect and refer the case to the District Land Titling Tribunal (discussed below) III. District Land Titling Tribunal and State Land Titling Appellate Tribunal The Bill proposes to set up a District Land Titling Tribunal, consisting of one or more serving officers not below the rank of Joint Collector / Sub Divisional Magistrate of the District. The government may also establish one or more State Land Titling Appellate Tribunals, to be presided over by serving Judicial Officers in the rank of District Judge. Revisions to the orders of the State Land Titling Appellate Tribunal may be made by a Special Bench of the High Court. The Bill bars civil courts from having jurisdiction to entertain proceedings in respect to matters that the TRO, District Land Titling Tribunal, and State Land Titling Appellate Tribunal are empowered to determine. IV. Completion of Records and Notification When preparation of the Record for whole or part of a specific are is complete, it will be notified. Any person aggrieved by the notified entry in the Register of Titles may file an objection before the District Land Titling Tribunal within three years of the notification. Additionally, the person may file an application with the TRO for an entry to be made in the Register of Titles. The TRO shall do so when the application has been admitted to the Tribunal. Minor errors in the Title of Registers can be rectified through an application to the TRO. V. Register of Titles After completion of records is notified by the Authority, the Register of Titles is prepared and maintained by the Authority. For each property, the Register will include: (a) general description, map, and locational details of the immovable property; (b) descriptive data such as a unique identification number, plot number, total area, built up and vacant area, address, site area, and undivided share in the land; (c) detail of survey entry, provisional title record, conclusive title record and status, mortgage, charges, other rights and interests in the property; (d) details of transfer of the property and past transactions; and (e) disputes pertaining to the property. Entries in the Register of Titles will serve as conclusive evidence of ownership. These entries shall be maintained in electronic form, indemnified, and kept in the public domain.