Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

The Union government’s Cabinet Committee on Security recently gave clearance to the Home Ministry’s NATGRID project.  The project aims to allow investigation and law enforcement agencies to access real-time information from data stored with agencies such as the Income Tax Department, banks, insurance companies, Indian Railways, credit card transactions, and more.  NATGRID, like a number of other government initiatives (UIDAI), is being established through governmental notifications rather than legislation passed in Parliament.  The examination of this issue requires an assessment of the benefits of legislation vis-a-vis government notifications. Government notifications can be issued either under a specific law, or independent of a parent law, provided that the department issuing such notification has the power to do so.  Rules, regulations which are notified have the advantage of flexibility since they can be changed without seeking Parliamentary approval. This advantage of initiating projects or establishing institutions through government notifications is also potentially of detriment to the system of checks and balances that a democracy rests on.  For, while legislation takes a longer time to be enacted (it is discussed, modified and debated in Parliament before being put to vote), this also enables elected representatives to oversee various dimensions of such projects.  In the case of NATGRID, the process would provide Parliamentarians the opportunity to debate the conditions under which private individual information can be accessed, what information may be accessed, and for what purpose.  This time consuming process is in fact of valuable import to projects such as NATGRID which have a potential impact on fundamental rights. Finally, because changing a law is itself a rigorous process, the conditions imposed on the access to personal information attain a degree of finality and cannot be ignored or deviated from.  Government rules and regulations on the other hand, can be changed by the concerned department as and when it deems necessary.  Though even governmental action can be challenged if it infringes fundamental rights, well-defined limits within laws passed by Parliament can help provide a comprehensive set of rules which would prevent their infringement in the first place. The Parliamentary deliberative process in framing a law is thus even more important than the law itself.  This is especially so in cases of government initiatives affecting justiciable rights.  This deliberative process, or the potential scrutiny of government drafted legislation on the floor of Parliament ensures that limitations on government discretion are clearly laid down, and remedies to unauthorised acts are set in stone.  This also ensures that the authority seeking to implement the project is The other issue pertains to the legal validity of the project itself.  Presently, certain departmental agencies maintain databases of personal information which helps them provide essential services, or maintain law and order.  The authority to maintain such databases flows from the laws which define their functions and obligations.  So the power of maintaining legal databases is implicit because of the nature of functions these agencies perform.  However, there is no implicit or explicit authorization to the convergence of these independent databases. One may argue that the government is not legally prevented from interlinking databases.  However, the absence of a legal challenge to the creation of NATGRID does not take away from the importance of establishing such a body through constitutionally established deliberative processes.  Therefore, the question to be asked is not whether NATGRID is legally or constitutionally valid, but whether it is important for Parliament to oversee the establishment of NATGRID. In October 2010, the Ministry of Personnel circulated an “Approach paper for a legislation on privacy”.  The paper states: “Data protection can only be ensured under a formal legal system that prescribes the rights of the individuals and the remedies available against the organization that breaches these rights. It is imperative, if the aim is to create a regime where data is protected in this country, that a clear legislation is drafted that spells out the nature of the rights available to individuals and the consequences that an organization will suffer if it breaches these rights.” As the lines above exemplify, it is important for a robust democracy to codify rights and remedies when such rights may be potentially affected.  The European Union and the USA, along with a host of other countries have comprehensive privacy laws, which also lay down conditions for access to databases, and the limitations of such use.  The UIDAI was established as an executive authority, and still functions without statutory mandate.  However, a Bill seeking to establish the body statutorily has been introduced, and its contents are being debated in the Parliamentary Standing Committee on Finance and the Bill has also been deliberated on by civil society at large. A similar approach is imperative in the case of NATGRID to uphold the sovereign electorate’s right to oversee institutions that may affect it in the future.