Safety has been one of the biggest concerns in the Indian Railways system.  While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year.  In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.

Causes of rail accidents

The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1]  The number of rail accidents as per the cause are shown in the graph below.  In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1  In the last decade, accidents caused due to both these causes have reduced by about half.  According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.

1

Derailments

Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2  The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches.  Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2  However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2  The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2

Un-manned level crossings

Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents.  Currently there are 14,440 UMLCs in the railway network.  In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2  Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs.  Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2  Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2  These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2  The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.

Casualties and compensation

In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]

2

Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.

Consequential train accidents

Accidents in railways may or may not have a significant impact on the overall system.  Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic.  These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property.  These exclude cases of trespassing at unmanned railway crossings.

As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents.  The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.

3

Accidents due to failure of railway staff

It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2  Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures.  To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2

Accidents due to loco-pilots2,[3]

Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible.  With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert.  Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours.  This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2  It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2

Actions taken by Railways with regard to the recent train accident

According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4]  It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).

The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5]  However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5

While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them.  As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5

The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5  Zonal Railways should also have full power for expenditure and re-appropriations and sanctions.  This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.

Under-investment in railways leading to accidents

In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore.  In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety.  It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).

The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2  Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2  This suggests that railway lines are severely congested.  Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2  Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2

Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train

[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.

[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.

[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.

[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.

[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.

The row over Bt Brinjal, a genetically modified version of the plant, provoked the government into imposing a moratorium on the commercial cultivation of the plant in India.  The debate has revolved around issues of economic efficacy, human health, consumer choice and farmers’ rights. Jairam Ramesh, the Minister of State for Environment and Forests, made public his views on the subject, a gist of which is given below:

  • The Genetic Engineering Approvals Committee (GEAC) report recommended commercial cultivation of Bt Brinjal but qualified it by stating that since the issue has important policy implications at the national level, the government should take a final view on the matter.
  • Most of the state governments have expressed concern and have sought to ban the use of Bt Brinjal, or all GM crops.
  • Pesticides have harmful effect on human health and Bt technology is one way of reducing pesticide use.  However, other routes such as non-pesticide pest management can be explored.  For example, about 6 lakh farmers in Andhra Pradesh practice non-pesticide pest management over an area of about 20 lakh acres.
  • Safety is a concern since the kind of tests that have been done is not specific or stringent enough to detect toxins.  Also, tests have only been carried out by the developers of the product, Maharashtra Hybrid Seeds Company Ltd. (Mahyco).  (The results of the biosafety tests are available on the GEAC website).
  • There is no large-scale public funded biotechnology effort toward agriculture, which could compete with Mahyco.  Monsanto is the main producer of Bt Brinjal, and Mahyco is owned to the extent of 26% by Monsanto.
  • While two government owned agricultural universities -- University of Agricultural Sciences, Dharwad and Tamil Nadu Agricultural University (TNAU), Coimbatore – have produced Bt Brinjal along with Mahyco, doubts have been raised about how Bt related research in these universities have been funded.
  • There are apprehensions that there will be diversity loss in the variety of Brinjal if Bt Brinjal is introduced, and this fear cannot be glossed over.
  • While Bt Cotton and Bt Brinjal are not comparable, the introduction of Bt Cotton in India has made India the second largest grower of cotton in the world.  Over 90% of cotton farmers in India cultivate Bt Cotton.  Many farmers support Bt Cotton on economic grounds but some did express doubts.
  • The Central Institute of Cotton Research, Nagpur has developed a Bt cotton variety (Bikaneri Nerma) whose seeds can be kept by farmers for planting during the next season.  The Director of the Institute while expressing support for Bt Brinjal has mentioned that resistance development is a serious issue.  Therefore, more tests that are well-designed, widely-accepted and independently conducted are necessary.
  • The GEAC process has been questioned by  Dr P.M. Bhargava, the Supreme Court nominee on GEAC.  He opposed the recommendation on the ground that all necessary tests had not been carried out before coming to a decision.  The 2006 committee of the GEAC had asked for several tests to be conducted which were not taken into account by the second expert committee.  All GEAC reports (including additional tests) of tests conducted with regard to Bt Brinjal are in the public domain.
  • There is some evidence that the GEAC not followed global regulatory norms of which India is a party.  For example, the Cartagena Protocol on Biosafety, Rio Declaration on Environment and Development etc.
  • Some international scientists have raised doubts about Bt Brinjal and the way the tests were conducted.
  • Many Indian scientists have supported commercialization of Bt Brinjal such as Dr G. Padmanabhan of the Indian Institute of Science; Dr Deepak Pental, Vice Chancellor of Delhi University; and Dr Raj Bhatnagar of the International Centre for Genetic Engineering and Biotechnology, New Delhi.  However, even they have mentioned the need for a statutory body with regulatory powers and R&D capabilities to govern all aspects of GM crops.
  • The Indian Council of Agricultural research and a number of farmer’s groups have come out in support of the move to introduce Bt Brinjal.

In order to understand the process followed by GEAC before giving the green signal to Bt Brinjal, we have made a timeline in which the plant was approved and the bodies involved in the process.

2000-2005 Scientific tests carried out by Mahyco on Bt Brinjal
2006 Mahyco submits bio-safety data to GEAC (regulatory body under the Ministry of Environment and Forests). Seeks permission for large scale trials.
  Supreme Court stops ongoing field trials of GM crops due to a PIL filed by civil society representatives.
2007 The expert committee 1 set up by GEAC, submits its report.  Recommends seven more studies on bio-safety be repeated for reconfirmation of data generated during confined multi-location trials but approves large scale trials.
  Supreme Court lifts ban on GM crop field trials subject to conditions such as isolation distance etc.
  As per GEAC direction, Indian Institute of Vegetable Research (IIVR) takes up the responsibility of large scale trails of Mahyco's Bt Brinjal trials at 10 research institutions across the country in 2007 and 11 in 2008.
2009 Jan: IIVR submits the results of the large scale trails. Due to concerns raised by several stakeholders, GEAC constitutes another expert committee to look into adequacy of biosafety data generated as well as the concerns raised by all stakeholders.
  Oct 8: Expert-committee 2 submits its report. States benefits of Bt Brinjal far outweigh the perceived and projected risks.
  Oct 14: GEAC approves the environmental release of Bt Brinjal containing the event EE1 (with one dissent note from P.M. Bhargava).
  Oct 15: Jairam Ramesh announces a nationwide consultation in January and February of 2010 pending a final decision on this issue.
2010 Jan 13 to Feb 6: Public meetings were organized on the Bt Brinjal issue. The summary of the consultations is available on the Ministry’s website.
  Many states announce ban on commercial cultivation of Bt Brinjal including Uttarakhand, Himachal Pradesh and Karnataka.
  Feb 9: Jairam Ramesh decides to halt the commercialization of Bt Brinjal.