Applications for LAMP Fellowship 2025-26 are now open. Apply here. The last date for submitting applications is December 21, 2024

Several Rajya Sabha seats go to elections this year. The President and the Vice-President are also due to be elected by August. We analyse the impact of the recent State Assembly elections on the composition of the Rajya Sabha and the outcome of the Presidential polls. Rajya Sabha - How will its composition change? Since Rajya Sabha members are elected by the elected members of State Legislative Assemblies, a change in the composition of State Assemblies can affect the composition of Rajya Sabha.  A total of 61 Rajya Sabha seats are up for election in April and July.  This includes 10 seats from Uttar Pradesh and 1 seat from Uttarakhand. In light of the recent Assembly elections, we work out two scenarios to estimate the composition of Rajya Sabha in 2012. Members of Rajya Sabha are elected through the system of proportional representation by means of the Single Transferable Vote (STV). In an STV election, a candidate is required to achieve a certain minimum number of votes (called the 'quota') to be elected.  (For more details on the STV system, click here) For instance, in the case of Uttar Pradesh (UP) 10 Rajya Sabha seats go to election this year.  Candidates will be elected to these 10 seats by the 403 elected MLAs of the Uttar Pradesh State Assembly.  Each MLA will rank the candidates based on his/ her preference. After successive rounds of elimination, candidates who are able to secure at least 37  {or 403/(10+1) } votes will be declared elected. In the new UP Assembly, Samajwadi  Party (SP) has a total strength of 224 members. As a result, SP can elect at least 6 (or 224/37) Rajya Sabha MPs of its choice.  BSP's strength of 80 will allow it to elect 2 (or 80/37) MPs to Rajya Sabha. Similarily, the BJP with a strength of 47 MLAs can have one candidate of its choice elected to the Rajya Sabha.  This leaves 1 seat.  The fate of this seat depends on the alliances that may be formed since no other party in UP has 37 or more seats in the Assembly.  If the Congress (28 seats) and RLD (9 seats) join hands, they may be able to elect a candidate of their choice. We build two scenarios which give the likely range of seats for the major coalitions and parties. The actual result will likely fall between these scenarios, depending on alliances for each election. Of the two scenarios, Scenario II is better for the UPA. It is based on the assumption that the UPA is able to put together the necessary support/ alliances to get its candidates elected to seats with indeterminate status.  Scenario I is based on the assumption that the UPA is not able to put together the required support. As a result, the seats in question get allocated to candidates from other parties/ coalitions. (See Notes for the composition of the coalitions) Composition of Rajya Sabha

Party/ Coalition Current composition Scenario I Scenario II
Total seats

245

245

245

UPA

93

95

98

NDA

66

67

65

Left

19

14

14

BSP

18

15

15

SP

5

9

9

BJD

6

8

7

AIADMK

5

5

5

Nominated

7

12

12

Others

21

20

20

Vacant

5

0

0

It appears that there would not be a major change in the composition of the Rajya Sabha. Which party's candidate is likely to become the next President? The next Presidential election will be held in June or July.  The electoral college for the Presidential election consists of the elected members of Lok Sabha, Rajya Sabha and all Legislative Assemblies. Each MP/ MLA’s vote has a pre-determined value based on the population they represent. For instance, an MP's vote has a value of 708, an MLA from UP has a vote value of 208 and an MLA from Sikkim has a vote value of 7. (Note that all MPs, irrespective of the constituency or State they represent, have equal vote value) As is evident, changes in the composition of Assemblies in larger States such as UP can have a major impact on the outcome of the Presidential election. The elections to the office of the President are held through the system of proportional representation by means of STV (same as in the case of Rajya Sabha).  The winning candidate must secure at least 50% of the total value of votes polled.  (For details, refer to this Election Commission document). By this calculation, a candidate will need at least 5,48,507 votes to be elected as the President. If the UPA were to vote as a consolidated block, its vote tally would reach 4,50,555 votes under Scenario II (the one that is favourable for the UPA).  Therefore, the UPA will have to seek alliances if it wants a candidate of its choice to be elected to the office of the President. Scenarios for Presidential elections (figures represent the value of votes available with each party/ coalition)

Party/ Coalition Scenario I Scenario II
UPA

4,48,431

4,50,555

NDA

3,05,328

3,03,912

Left

51,574

51,574

BSP

43,723

43,723

SP

69,651

69,651

BJD

30,923

30,215

AIADMK

36,216

36,216

Others

1,11,166

1,11,166

Total

10,97,012

10,97,012

Minimum required to be elected

5,48,507

5,48,507

What about the Vice-President? Elections to the office of the Vice-President (VP) will be held in July or August.  The electoral college will consist of all members of Lok Sabha and Rajya Sabha (i.e. both elected and nominated). Unlike the Presidential elections, all votes will have an equal value of one. Like the President, the VP is also elected through the system of proportional representation by means of STV.  The winning candidate must secure at least 50% of the total value of votes polled. Presently, two seats are vacant in the Lok Sabha. If we exclude these from our analysis, we find that a candidate will need at least 395 votes to be elected as the VP.  Under our best case scenario, the UPA holds 363 votes in the forthcoming VP elections. As is the case with Presidential elections, the UPA will have to seek alliances to get a candidate of its choice elected to the office of the Vice-President. Scenarios for VP elections (figures represent the value of votes available with each party/ coalition)

Party/ Coalition

Scenario I

Scenario II

UPA

360

363

NDA

216

214

Left

38

38

BSP

36

36

SP

31

31

BJD

22

21

AIADMK

14

14

Nominated

14

14

Others

57

57

Total

788

788

Minimum required to be elected

395

395

Notes: [1] UPA: Congress, Trinamool, DMK, NCP,Rashtriya Lok Dal, J&K National Conference, Muslim League Kerala State Committee, Kerala Congress (M), All India Majlis-e-Ittehadul Muslimeen, Sikkim Democratic Front, Praja Rajyam Party, Viduthalai Chiruthaigal Katchi [2] NDA: BJP, JD(U), Shiv Sena, Shiromani Akali Dal [3] Left: CPI(M), CPI, Revolutionary Socialist Party,All India Forward Bloc  

On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER).  During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed.  The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region.  In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.  

A new scheme named PM-DevINE announced to boost infrastructure and social development

In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22.  The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme.  A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.  

One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE).  It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region).  PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture.  The scheme will not replace or subsume existing central sector or centrally sponsored schemes.  The Scheme will be given an initial allocation of Rs 1,500 crore.

Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)

Major Heads

2020-21 Actuals

2021-22 BE

2021-22 RE

2022-23 BE

% change from 2021-22 RE to 2022-23 BE

North East Special Infrastructure Development Scheme

446

675

674

1,419

111%

Schemes of North East Council

567

585

585

702

20%

North East Road Sector Development Scheme

416

696

674

496

-26%

Central pool of resources for North East and Sikkim

342

581

581

-

-

Others

270

322

344

241

-30%

Total

1,854

2,658

2,658

2,800

5%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.

Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS. 

Allocation towards capital outlay less than demand

The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore).  Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges.  The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay.  It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.

Underutilisation of funds over the years

Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1).  For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure).  Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.

Figure 1: Underutilisation of funds by the Ministry since 2011-12

image
 Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
 Sources: Union Budget Documents (2011-12 to 2022-23); PRS
.

Delay in project completion

The Ministry implements several schemes for infrastructural projects such as roads and bridges.  The progress of the certain schemes has been inadequate.   The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project.  Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.

Need to address declining forest cover

The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover.  The Committee took note of the declining forest cover in the North East India.  As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km).  The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities.  The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline.  It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.

Key issues raised by Members during discussion in Rajya Sabha

The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022.  One of the issues highlighted by members was about the Ministry not having its own line Department.  This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects.  Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region.  The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.         

Allocation by Union Ministries to the North East 

Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation).  The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries.  In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region.  The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore).   In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.  

Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)

image   

Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.