Applications for LAMP Fellowship 2025-26 are now open. Apply here. The last date for submitting applications is December 21, 2024

On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary.  It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019.  The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management.  In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.

Nation-wide sanitation programmes in past

According to the Census, the rural sanitation coverage in India was only 1% in 1981.  

The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas.  Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC).  While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.

By 2001, only 22% of the rural families had access to toilets.  It increased further to 32.7% by 2011.  In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).

In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation.  In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets.  Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations.  In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.

On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively.  While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs.  In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.

Swachh Bharat Mission – Gramin (SBM-Gramin)

The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live.  Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).

Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22


Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.  Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation. 
Sources: Union Budgets 2014-15 to 2021-22; PRS.

The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years.  Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%.  However, every year since 2018-19, there has been some under-utilisation of the allocated amount. 

As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2).  However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”.  The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.

Figure 2: Toilet coverage for rural households


Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.

The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line.  It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.

In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore.  ODF Plus includes sustaining the ODF status, and solid and liquid waste management.  Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.

Swachh Bharat Mission – Urban (SBM-Urban)

SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country.  One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019.  However, this target was then lowered to 59 lakh IHHLS by 2019.  This target was achieved by 2020 (see Table 1).

Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)

Targets

Original Target

Revised Target  
(revised in 2019)

Actual Constructed

Individual Household Latrines

66,42,000

58,99,637

62,60,606

Community and Public Toilets

5,08,000

5,07,587

6,15,864

Sources: Swachh Bharat Mission Urban - Dashboard; PRS.

Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)

Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. 
Sources: Union Budget 2014-15 to 2021-22; PRS.

The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance.  Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene.  Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme. 

The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing.  The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21.  In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).

Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)

Targets

Target

Progress
as of March 2020

Progress
as of December 2020

Door to Door Waste Collection (Wards)

86,284

81,535 (96%)

83,435 (97%)

Source Segregation (Wards)

86,284

64,730 (75%)

67,367 (78%)

Waste Processing (in %)

100%

65%

68%

Sources: Standing Committee on Urban Development (2021); PRS.

In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched.  Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites.  On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.

On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER).  During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed.  The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region.  In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.  

A new scheme named PM-DevINE announced to boost infrastructure and social development

In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22.  The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme.  A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.  

One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE).  It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region).  PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture.  The scheme will not replace or subsume existing central sector or centrally sponsored schemes.  The Scheme will be given an initial allocation of Rs 1,500 crore.

Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)

Major Heads

2020-21 Actuals

2021-22 BE

2021-22 RE

2022-23 BE

% change from 2021-22 RE to 2022-23 BE

North East Special Infrastructure Development Scheme

446

675

674

1,419

111%

Schemes of North East Council

567

585

585

702

20%

North East Road Sector Development Scheme

416

696

674

496

-26%

Central pool of resources for North East and Sikkim

342

581

581

-

-

Others

270

322

344

241

-30%

Total

1,854

2,658

2,658

2,800

5%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.

Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS. 

Allocation towards capital outlay less than demand

The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore).  Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges.  The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay.  It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.

Underutilisation of funds over the years

Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1).  For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure).  Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.

Figure 1: Underutilisation of funds by the Ministry since 2011-12

image
 Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
 Sources: Union Budget Documents (2011-12 to 2022-23); PRS
.

Delay in project completion

The Ministry implements several schemes for infrastructural projects such as roads and bridges.  The progress of the certain schemes has been inadequate.   The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project.  Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.

Need to address declining forest cover

The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover.  The Committee took note of the declining forest cover in the North East India.  As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km).  The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities.  The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline.  It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.

Key issues raised by Members during discussion in Rajya Sabha

The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022.  One of the issues highlighted by members was about the Ministry not having its own line Department.  This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects.  Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region.  The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.         

Allocation by Union Ministries to the North East 

Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation).  The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries.  In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region.  The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore).   In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.  

Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)

image   

Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.