On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary.  It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019.  The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management.  In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.

Nation-wide sanitation programmes in past

According to the Census, the rural sanitation coverage in India was only 1% in 1981.  

The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas.  Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC).  While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.

By 2001, only 22% of the rural families had access to toilets.  It increased further to 32.7% by 2011.  In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).

In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation.  In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets.  Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations.  In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.

On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively.  While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs.  In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.

Swachh Bharat Mission – Gramin (SBM-Gramin)

The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live.  Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).

Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22


Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.  Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation. 
Sources: Union Budgets 2014-15 to 2021-22; PRS.

The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years.  Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%.  However, every year since 2018-19, there has been some under-utilisation of the allocated amount. 

As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2).  However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”.  The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.

Figure 2: Toilet coverage for rural households


Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.

The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line.  It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.

In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore.  ODF Plus includes sustaining the ODF status, and solid and liquid waste management.  Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.

Swachh Bharat Mission – Urban (SBM-Urban)

SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country.  One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019.  However, this target was then lowered to 59 lakh IHHLS by 2019.  This target was achieved by 2020 (see Table 1).

Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)

Targets

Original Target

Revised Target  
(revised in 2019)

Actual Constructed

Individual Household Latrines

66,42,000

58,99,637

62,60,606

Community and Public Toilets

5,08,000

5,07,587

6,15,864

Sources: Swachh Bharat Mission Urban - Dashboard; PRS.

Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)

Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. 
Sources: Union Budget 2014-15 to 2021-22; PRS.

The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance.  Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene.  Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme. 

The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing.  The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21.  In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).

Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)

Targets

Target

Progress
as of March 2020

Progress
as of December 2020

Door to Door Waste Collection (Wards)

86,284

81,535 (96%)

83,435 (97%)

Source Segregation (Wards)

86,284

64,730 (75%)

67,367 (78%)

Waste Processing (in %)

100%

65%

68%

Sources: Standing Committee on Urban Development (2021); PRS.

In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched.  Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites.  On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.

As of April 22, 2020, Sikkim does not have any confirmed cases of COVID-19.  As of April 21, 2020, 87 samples have been sent for testing from Sikkim.  Of these, 80 have tested negative for COVID-19, and the results of seven samples are awaited.  The state has announced several policy decisions to prevent the spread of the virus and provide relief for those affected by it.  In this blog post, we summarise some of the key measures taken by the Sikkim state government in this regard as of April 22, 2020.  

Response before national lockdown

On March 16, the state government responded to the growing number of suspected cases in India by notifying certain directions to be applicable till April 15, 2020.  These included: (i) banning the entry of all domestic and foreign tourists in to the state, (ii) closing all educational institutes and anganwadis, (iii) prohibiting the use of recreational facilities such as, casinos, gym, and cinemas, (iii) closing three out of five check posts (border opening) for all visitors in to the state and opening the other two only for medical and police teams, and (iv) banning private industries from getting migrant workers from outside the state and avoiding large concentration of workers at one place.

On March 19, assembly of more than five people was prohibited in the state until April 15, 2020.  The government ordered the suspension of all non-essential work on March 19.  The supply of all essential commodities such as food grains, vegetables, sanitisers and masks was allowed.  Further, the formation of a sub-divisional task force to detect suspected cases was ordered.  

On March 22, the government regulated intra-state movement of private vehicles, two-wheelers and taxis on an odd-even basis (allowing plying of vehicles on alternate days as per the number plate) until April 15, 2020.  The government also reduced the budget session of the state to two days on March 23. 

On March 25, the central government announced on a 21-day country-wide lockdown till April 14.  During the lockdown the state government took various steps for physical containment, health, financial and welfare measures.  These are detailed below.

Measures taken during lockdown

Movement Restrictions

Certain movement restrictions were put across the state.   These include:

  • Movement of vehicles: Inter-state movement of vehicles was restricted to vehicles transporting essential goods.  These vehicles need to have a permanent pass for such movement.  On April 5, intra-state movement of vehicles was restricted to government officials, transportation of essential commodities, banks and PSUs, and media and cable networks.   Their passes are valid only from 8am to 5pm.
     
  • Validity of passes:  The state government noted that a large number of vehicle passes were issued due to various reasons.  On April 14, the government ordered that all passes issued by District Magistrates, and other Departmental Authorities (except those issued by the police, health department and forest and environment department) will be invalid from April 14.  New passes will be issued only by Magistrates and Block Development Officers.  
     
  • Securing borders:  In view of the COVID-19 pandemic and to check unauthorised cross-border infiltration from China, Nepal, and Bhutan, the state government secured all porous borders along the Rangpo river and other vulnerable areas.

Essential Goods and Services

On April 5, the state government issued an order requiring establishments such as shops, hotels, private offices, and commercial establishments to remain closed until April 15.  Establishments which were permitted to remain functional include law enforcement agencies, health services, electricity and water services, petrol pumps, and media.  Shops for PDS, groceries, vegetables, milk and, medicines were only allowed remain open from 9 am to 4 pm.

  • Valid prescription and label required:  On March 25, the state prohibited the sale of hand sanitisers without drug manufacturing licence label.  It also prohibited sale of N95 masks to general public without valid prescription. 
     
  • Transit camps:  On April 17, the state government notified that transit camps (temporary accommodation) will be set up for drivers and helpers of vehicles carrying essential goods.

Health Measures

On March 31, the Sikkim government identified and set up dedicated isolation wards and treatment centres in the STNM hospital, Sochakgang as a precautionary measure.  The government also issued directions for citizens to avoid getting infected by coronavirus.  These included social distancing, and maintaining proper hygiene.  

On April 18, the state government made it mandatory for all the public, students, teachers, and government employees, to install the Aarogya Setu application.  The government of India launched a mobile app called ‘Aarogya Setu’ to enable people to assess the risk of catching COVID-19 on April 2, 2020.   The app uses Bluetooth and Global Positioning System (GPS) based device location for contact tracing in order to prevent the spread of COVID-19. 

Welfare Measures

  • Economic relief package:  On March 27, an economic relief package was announced by the state government.   This included free ration in specific quantities (other than the PDS entitlement) to needy families in rural and urban areas, daily wagers, migrant labourers, casual workers, and stranded people.  Further, the government announced an additional incentive wage of Rs 300/day for tea workers at Temi-tea estate. 
     
  • Food distribution:  On April 16, the government announced that Asha workers will be given Rs 5,000 as honorarium for work done during COVID-19.  Further, it ordered the food and civil supply department to compile a list of all the left out beneficiaries for distribution of food relief packages.
     
  • Relief to stranded patients:  On April 16, the government announced that a financial relief of Rs 30,000 will be provided to each patient undergoing treatment and stranded outside Sikkim from the Chief Minister's relief fund.
     
  • Relief for casual workers:  On March 30, the Sikkim government issued directions to all contractors/ employers to pay migrant and casual labourers on the due date without any deductions due to the lockdown.  The state government also provided grants worth Rs 2,000 to the 7,836 registered building and other construction workers in the state.
     
  • Relief for stranded students:  On March 29, the state announced that it will provide Rs 5,000 to each state student stranded outside Sikkim during the nationwide lockdown.

Certain relaxations after 20th April 

On April 14, the nation-wide lockdown was further extended till May 3, 2020.  On April 15, the Ministry of Home Affairs issued guidelines outlining select activities which will be permitted from April 20 onwards.  These activities include health services, agriculture related activities, certain financial sector activities, operation of Anganwadis, MNREGA works, and cargo movement.  Further, subject to certain conditions, commercial and private establishments, industrial establishments, government offices, and construction activities will also be permitted.  The Sikkim government took the following steps in the same line.

  • On April 19, the state government gave directions to all government and PSU offices to work with up to one-third of their actual staff strength from April 20 onwards. 
     
  • On April 19, the state government gave directions and standard operating procedures to be followed at manufacturing establishments, work spaces and public places post April 20.  These include: (i) no overlapping shifts, (ii) staggered lunch breaks, (iii) training on good hygiene practices, (iv) compulsory wearing of face cover, and (v) sanitising workplaces between shifts. 

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.