As of April 22, 2020, Sikkim does not have any confirmed cases of COVID-19.  As of April 21, 2020, 87 samples have been sent for testing from Sikkim.  Of these, 80 have tested negative for COVID-19, and the results of seven samples are awaited.  The state has announced several policy decisions to prevent the spread of the virus and provide relief for those affected by it.  In this blog post, we summarise some of the key measures taken by the Sikkim state government in this regard as of April 22, 2020.  

Response before national lockdown

On March 16, the state government responded to the growing number of suspected cases in India by notifying certain directions to be applicable till April 15, 2020.  These included: (i) banning the entry of all domestic and foreign tourists in to the state, (ii) closing all educational institutes and anganwadis, (iii) prohibiting the use of recreational facilities such as, casinos, gym, and cinemas, (iii) closing three out of five check posts (border opening) for all visitors in to the state and opening the other two only for medical and police teams, and (iv) banning private industries from getting migrant workers from outside the state and avoiding large concentration of workers at one place.

On March 19, assembly of more than five people was prohibited in the state until April 15, 2020.  The government ordered the suspension of all non-essential work on March 19.  The supply of all essential commodities such as food grains, vegetables, sanitisers and masks was allowed.  Further, the formation of a sub-divisional task force to detect suspected cases was ordered.  

On March 22, the government regulated intra-state movement of private vehicles, two-wheelers and taxis on an odd-even basis (allowing plying of vehicles on alternate days as per the number plate) until April 15, 2020.  The government also reduced the budget session of the state to two days on March 23. 

On March 25, the central government announced on a 21-day country-wide lockdown till April 14.  During the lockdown the state government took various steps for physical containment, health, financial and welfare measures.  These are detailed below.

Measures taken during lockdown

Movement Restrictions

Certain movement restrictions were put across the state.   These include:

  • Movement of vehicles: Inter-state movement of vehicles was restricted to vehicles transporting essential goods.  These vehicles need to have a permanent pass for such movement.  On April 5, intra-state movement of vehicles was restricted to government officials, transportation of essential commodities, banks and PSUs, and media and cable networks.   Their passes are valid only from 8am to 5pm.
     
  • Validity of passes:  The state government noted that a large number of vehicle passes were issued due to various reasons.  On April 14, the government ordered that all passes issued by District Magistrates, and other Departmental Authorities (except those issued by the police, health department and forest and environment department) will be invalid from April 14.  New passes will be issued only by Magistrates and Block Development Officers.  
     
  • Securing borders:  In view of the COVID-19 pandemic and to check unauthorised cross-border infiltration from China, Nepal, and Bhutan, the state government secured all porous borders along the Rangpo river and other vulnerable areas.

Essential Goods and Services

On April 5, the state government issued an order requiring establishments such as shops, hotels, private offices, and commercial establishments to remain closed until April 15.  Establishments which were permitted to remain functional include law enforcement agencies, health services, electricity and water services, petrol pumps, and media.  Shops for PDS, groceries, vegetables, milk and, medicines were only allowed remain open from 9 am to 4 pm.

  • Valid prescription and label required:  On March 25, the state prohibited the sale of hand sanitisers without drug manufacturing licence label.  It also prohibited sale of N95 masks to general public without valid prescription. 
     
  • Transit camps:  On April 17, the state government notified that transit camps (temporary accommodation) will be set up for drivers and helpers of vehicles carrying essential goods.

Health Measures

On March 31, the Sikkim government identified and set up dedicated isolation wards and treatment centres in the STNM hospital, Sochakgang as a precautionary measure.  The government also issued directions for citizens to avoid getting infected by coronavirus.  These included social distancing, and maintaining proper hygiene.  

On April 18, the state government made it mandatory for all the public, students, teachers, and government employees, to install the Aarogya Setu application.  The government of India launched a mobile app called ‘Aarogya Setu’ to enable people to assess the risk of catching COVID-19 on April 2, 2020.   The app uses Bluetooth and Global Positioning System (GPS) based device location for contact tracing in order to prevent the spread of COVID-19. 

Welfare Measures

  • Economic relief package:  On March 27, an economic relief package was announced by the state government.   This included free ration in specific quantities (other than the PDS entitlement) to needy families in rural and urban areas, daily wagers, migrant labourers, casual workers, and stranded people.  Further, the government announced an additional incentive wage of Rs 300/day for tea workers at Temi-tea estate. 
     
  • Food distribution:  On April 16, the government announced that Asha workers will be given Rs 5,000 as honorarium for work done during COVID-19.  Further, it ordered the food and civil supply department to compile a list of all the left out beneficiaries for distribution of food relief packages.
     
  • Relief to stranded patients:  On April 16, the government announced that a financial relief of Rs 30,000 will be provided to each patient undergoing treatment and stranded outside Sikkim from the Chief Minister's relief fund.
     
  • Relief for casual workers:  On March 30, the Sikkim government issued directions to all contractors/ employers to pay migrant and casual labourers on the due date without any deductions due to the lockdown.  The state government also provided grants worth Rs 2,000 to the 7,836 registered building and other construction workers in the state.
     
  • Relief for stranded students:  On March 29, the state announced that it will provide Rs 5,000 to each state student stranded outside Sikkim during the nationwide lockdown.

Certain relaxations after 20th April 

On April 14, the nation-wide lockdown was further extended till May 3, 2020.  On April 15, the Ministry of Home Affairs issued guidelines outlining select activities which will be permitted from April 20 onwards.  These activities include health services, agriculture related activities, certain financial sector activities, operation of Anganwadis, MNREGA works, and cargo movement.  Further, subject to certain conditions, commercial and private establishments, industrial establishments, government offices, and construction activities will also be permitted.  The Sikkim government took the following steps in the same line.

  • On April 19, the state government gave directions to all government and PSU offices to work with up to one-third of their actual staff strength from April 20 onwards. 
     
  • On April 19, the state government gave directions and standard operating procedures to be followed at manufacturing establishments, work spaces and public places post April 20.  These include: (i) no overlapping shifts, (ii) staggered lunch breaks, (iii) training on good hygiene practices, (iv) compulsory wearing of face cover, and (v) sanitising workplaces between shifts. 

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

By Rohit & Anirudh A modified 'Modernization of State Police Forces' scheme was started by the central government in 2000-01. One of the objectives was to help police forces in meeting the emerging challenges to internal security in the form of terrorism, naxalism etc. The scheme aims to modernize police forces in terms of:

  • Mobility (including purchase of bullet proof and mine proof vehicles)
  • Weaponry
  • Communication Systems
  • Training
  • Forensic Science Laboratory/ Finger Printing Bureau
  • Equipments
  • Buildings

Under this scheme, States have been clubbed into different categories and Centre-State cost sharing is category specific. Since 2005-06, States have been categorized as category ‘A’ and ‘B’ with 100% and 75% Central funding respectively. All the North Eastern States, namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura and Sikkim have been placed in category ‘A’ and thus, are entitled to receive 100% Central assistance for implementation of their annual approved plans. Recently, CAG decided to evaluate the working of the scheme and commissioned ‘performance audit’ reviews covering select general category and special category States. Each review covers a contiguous five year period between 2000 and 2007, but varies across selected states. For the periods under review, each state had a plan outlay (the total amount proposed to be spent in modernizing the state's police forces). However, in most cases, the actual release of funds fell significantly short of this outlay - in some cases the Centre did not contribute its share, in others the States lagged behind. For instance, in the case of Bihar, the Centre released only 56% of its share; while in the case of Rajasthan and West Bengal, the States did not release any funds at all. The graph below shows the actual releases by the Centre and the States (as percentages of their share in the proposed outlays): Further, even the funds that were released were not fully utilized. Thus, the amount finally spent fell significantly short of the initial proposal. The graph below shows the actual expenditure by State: Following are some of the other main findings from the CAG report:

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the MHA were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent money on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan.

c) Jharkhand – District Control rooms remained non-functional because of shortage of manpower.

Weapons

§ Police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the Ministry of Home Affairs (MHA) were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent Rs 32 crore on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones, and no additions were made.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles. 203 ambassador cars were procured, though only 55 were approved by the MHA.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy. Satisfaction levels with the housing provided were also very low.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan, and only 1045 units were completed by 2006.

c) Jharkhand – District Control rooms remained non-functional even after spending Rs 2 crore because of shortage of manpower.

Weapons

§ It was observed that the police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.