In Budget Session 2018, Rajya Sabha has planned to examine the working of four ministries.  The Ministry of Drinking Water and Sanitation is one of the ministries listed for discussion.  In this post, we look at the key schemes being implemented by the Ministry and their status.

What are the key functions of the Ministry of Drinking Water and Sanitation?

As per the Constitution, supply of water and sanitation are state subjects which means that states regulate and provide these services.  The Ministry of Drinking Water and Sanitation is primarily responsible for policy planning, funding, and coordination of programs for: (i) safe drinking water; and (ii) sanitation, in rural areas.  From 1999 till 2011, the Ministry operated as a Department under the Ministry of Rural Development.  In 2011, the Department was made an independent Ministry.  Presently, the Ministry oversees the implementation of two key schemes of the government: (i) Swachh Bharat Mission-Gramin (SBM-G), and (ii) National Rural Drinking Water Programme (NRDWP).

How have the finances and spending priorities of the Ministry changed over time?

In the Union Budget 2018-19, the Ministry has been allocated Rs 22,357 crore.  This is a decrease of Rs 1,654 crore (7%) over the revised expenditure of 2017-18.  In 2015-16, the Ministry over-shot its budget by 178%.  Consequently, the allocation in 2016-17 was more than doubled (124%) to Rs 14,009 crore.

In recent years, the priorities of the Ministry have seen a shift (see Figure 1).  The focus has been on providing sanitation facilities in rural areas, mobilising behavioural change to increase usage of toilets, and consequently eliminating open defecation.  However, this has translated into a decrease in the share of allocation towards drinking water (from 87% in 2009-10 to 31% in 2018-19).  In the same period, the share of allocation to rural sanitation has increased from 13% to 69%.Figure 1

What has been the progress under Swacch Bharat Mission- Gramin?

The Swachh Bharat Mission was launched on October 2, 2014 with an aim to achieve universal sanitation coverage, improve cleanliness, and eliminate open defecation in the country by October 2, 2019.

Expenditure on SBM-G:  In 2018-19, Rs 15,343 crore has been allocated towards SBM-G.  The central government allocation to SBM-G for the five year period from 2014-15 to 2018-19 has been estimated to be Rs 1,00,447 crore.  Of this, up to 2018-19, Rs 52,166 crore (52%) has been allocated to the scheme.  This implies that 48% of the funds are still left to be released before October 2019.  Figure 2

Construction of Individual Household Latrines (IHHLs):  For construction of IHHLs, funds are shared between the centre and states in the 60:40 ratio.  Construction of IHHLs account for the largest share of total expenditure under the scheme (97%-98%).  Although the number of toilets constructed each year has increased, the pace of annual growth of constructing these toilets has come down.  In 2015-16, the number of toilets constructed was 156% higher than the previous year.  This could be due to the fact that 2015-16 was the first full year of implementation of the scheme.  The growth in construction of new toilets reduced to 74% in 2016-17, and further to 4% in 2017-18.Table 1

As of February 2018, 78.8% of households in India had a toilet.  This implies that 15 crore toilets have been constructed so far.  However, four crore more toilets need to be construced in the next 20 months for the scheme to achieve its target by 2019.

Open Defecation Free (ODF) villages:  Under SBM-G, a village is ODF when: (i) there are no visible faeces in the village, and (ii) every household as well as public/community institution uses safe technology options for faecal disposal.  After a village declares itself ODF, states are required to carry out verification of the ODF status of such a village.  This includes access to a toilet facility and its usage, and safe disposal of faecal matter through septic tanks.  So far, out of all villages in the country, 72% have been verified as ODF.  This implies that 28% villages are left to be verified as ODF for the scheme to achieve its target by 2019.Table 2

Information, Education and Communication (IEC) activities:  As per the SBM-G guidelines, 8% of funds earmarked for SBM-G in a year should be utilised for IEC activities.  These activities primarily aim to mobilise behavioural change towards the use of toilets among people.  However, allocation towards this component has remained in the 1%-4% range.  In 2017-18, Rs 229 crore is expected to be spent, amounting to 2% of total expenditure.

What is the implementation status of the National Rural Drinking Water Programme?

The National Rural Drinking Water Programme (NRDWP) aims at assisting states in providing adequate and safe drinking water to the rural population in the country.  In 2018-19, the scheme has been allocated Rs 7,000 crore, accounting for 31% of the Ministry’s finances.Figure 3

Coverage under the scheme:  As of August 2017, 96% of rural habitations have access to safe drinking water.  In 2011, the Ministry came out with a strategic plan for the period 2011-22.  The plan identified certain standards for coverage of habitations with water supply, including targets for per day supply of drinking water.  As of February 2018, 74% habitations are fully covered (receiving 55 litres per capita per day), and 22% habitations are partially covered (receiving less than 55 litres per capita per day).  The Ministry aims to cover 90% rural households with piped water supply and 80% rural households with tap connections by 2022.  The Estimates Committee of Parliament (2015) observed that piped water supply was available to only 47% of rural habitations, out of which only 15% had household tap connections.

Contamination of drinking water:  It has been noted that NRDWP is over-dependant on ground water.  However, ground water is contaminated in over 20 states.  For instance, high arsenic contamination has been found in 68 districts of 10 states.  These states are Haryana, Punjab, Uttar Pradesh, Bihar, Jharkhand, Chhattisgarh, West Bengal, Assam, Manipur, and Karnataka.Table 3

Chemical contamination of ground water has also been reported due to deeper drilling for drinking water sources.  It has been recommended that out of the total funds for NRDWP, allocation for water quality monitoring and surveillance should not be less than 5%.  Presently, it is 3% of the total funds.  It has also been suggested that water quality laboratories for water testing should be set up throughout the country.

The increasing Non-Performing Assets (NPAs) in the Indian banking sector has recently been the subject of much discussion and scrutiny.  Yesterday, the Supreme Court struck down a circular dated February 12, 2018 issued by the Reserve Bank of India (RBI).  The RBI circular laid down a revised framework for the resolution of stressed assets.  In this blog, we examine the extent of NPAs in India, and recent events leading up to the Supreme Court judgement.

What is the extent and effect of the NPA problem in India?

Banks give loans and advances to borrowers. Based on the performance of the loan, it may be categorised as: (i) a standard asset (a loan where the borrower is making regular repayments), or (ii) a non-performing asset. NPAs are loans and advances where the borrower has stopped making interest or principal repayments for over 90 days.

As of 2018, the total NPAs in the economy stand at Rs 9.6 lakh crore.  About 88% of these NPAs are from loans and advances of public sector banks.  Banks are required to lend a certain percentage of their loans to priority sectors.  These sectors are identified by the RBI and include agriculture, housing, education and small scale industries.[1]  In 2018, of the total NPAs, 22% were from priority sector loans, and 78% were from non-priority sector loans. 

In the last few years, gross NPAs of banks (as a percentage of total loans) have increased from 2.3% of total loans in 2008 to 9.3% in 2017 (see Figure 1). This indicates that an increasing proportion of a bank’s assets have ceased to generate income for the bank, lowering the bank’s profitability and its ability to grant further credit.

Figure 1: Gross NPAs (% of total loans)

Source: Reserve Bank of India; PRS

What has been done to address the problem of growing NPAs?

The measures taken to resolve and prevent NPAs can broadly be classified into two kinds – first, remedial measures for banks prescribed by the RBI for internal restructuring of stressed assets, and second, legislative means of resolving NPAs under various laws (like the Insolvency and Bankruptcy Code, 2016).

Remedial Measures

Over the years, the RBI has issued various guidelines for banks aimed at the resolution of stressed assets in the economy. These included introduction of certain schemes such as: (i) Strategic Debt Restructuring (which allowed banks to change the management of the defaulting company), and (ii) Joint Lenders’ Forum (where lenders evolved a resolution plan and voted on its implementation).   A summary of the various schemes implemented by the RBI is provided in Table 1. 

Table 1: Non-legislative loan recovery framework

Loan restructuring

  • Banks internally undertake restructuring of loans, if the borrower is unable to repay the amount.  This involves changing the terms of repayment, which includes altering the payment schedule of loans or interest rates.

Corporate Debt Restructuring

  • Allows for restructuring of a borrower’s outstanding loans from more than one bank.  This mechanism is available if the borrower’s outstanding loans are more than Rs 10 crore.[2]

Joint Lender's Forum

  • Lenders evolve an action plan to resolve the NPA of a defaulter.[3]  If 60% of the creditors by value, and 50% of the creditors by number agree, a recovery plan will be implemented.[4]

5:25 Scheme

  • Banks can extend loan term to 25 years based on cash flow of projects for which the loan was given.  Interest rates and other terms of the loans may be readjusted every five years.[5]

Strategic Debt Restructuring

  • Banks convert their debt into equity to hold a majority of shares in a company.  This allows banks to change the management of the defaulting company.[6]

Sustainable Structuring of Stressed Assets

  • Allows for conversion of a part of the outstanding debt to equity or preference shares if: (i) project for which loan was taken has commenced operations, and (ii) borrower can repay over 50% of the loan.[7]

Sources: RBI scheme guidelines; Economic Survey 2016-17; PRS.

Legislative Measures

  • The Insolvency and Bankruptcy Code (IBC) was enacted in May 2016 to provide a time-bound 180-day recovery process for insolvent accounts. When a default occurs, the creditors or debtor may apply to the National Company Law Tribunal for initiating the resolution process. Once the application is approved, the resolution process will have to be completed within 180 days (extendable by 90 days) from the date of approval.  The resolution process will be presided over by an insolvency professional to decide whether to restructure the loan, or to sell the defaulter’s assets to recover the outstanding amount.  If a timely decision is not arrived at, the defaulter’s assets are liquidated.
  • The Banking Regulation (Amendment) Act, 2017: The amendment allows RBI to direct banks to initiate recovery proceedings against defaulting accounts under the IBC.  Further, under Section 35AA of the Act, RBI may also issue directions to banks for resolution of specific stressed assets. 

In June 2017, an internal advisory committee of RBI identified 500 defaulters with the highest value of NPAs.[8]  The committee recommended that 12 largest non-performing accounts, each with outstanding amounts greater than Rs 5,000 crore and totalling 25% of the NPAs of the economy, be referred for resolution under the IBC immediately.  Proceedings against the 12 largest defaulters have been initiated under the IBC. 

What was the February 12 circular issued by the RBI?

Subsequent to the enactment of the IBC, the RBI put in place a framework for restructuring of stressed assets of over Rs 2,000 crore on or after March 1, 2018.  The resolution plan for such restructuring must be unanimously approved by all lenders and implemented within 180 days from the date of the first default.  If the plan is not implemented within the stipulated time period, the stressed assets are required to be referred to the NCLT under IBC within 15 days.  Further, the framework introduced a provision for early identification and categorisation of stressed assets before they are classified as NPAs.

On what grounds was the RBI circular challenged?

Borrowers whose loans were tagged as NPAs before the release of the circular recently crossed the 180-day deadline for internal resolution by banks. Some of these borrowers, including various power producers and sugar mills, had appealed against the RBI circular in various High Courts. A two-judge bench of the Allahabad High Court ruled in favour of the RBI’s powers to issue these guidelines, and refused to grant interim relief to power producers from being taken to the NCLT for bankruptcy. These batch of petitions against the circular were transferred to the Supreme Court, which issued an order in September 2018 to maintain status quo on the same.

What did the Supreme Court order?

The Court held the circular issued by RBI was outside the scope of the power given to it under Article 35AA of the Banking Regulation (Amendment) Act, 2017.  The Court reasoned that Section 35AA was proposed by the 2017 Act to authorise the RBI to issues directions only in relation to specific cases of default by specific debtors.  It held that the RBI circular issued directions in relation to debtors in general and this was outside their scope of power.  The court also held that consequently all IBC proceedings initiated under the RBI circular are quashed. 

During the proceedings, various companies argued that the RBI circular applies to all corporate debtors alike, without looking into each individual’s sectors problems and attempting to solve them.  For instance, several power companies provided sector specific reasons for delay in payment of bank dues.  The reasons included: (i) cancellation of coal blocks by the SC leading to non-availability of fuel, (ii) lack of enough power purchase agreements by states, (iii) non-payment of dues by DISCOMs, and (iv) delays in project implementation leading to cost overruns.  Note that, in its 40th report, the Parliamentary Standing Committee on Energy analysed the impact of the RBI circular on the power sector and noted that the ‘one size fits all’ approach of the RBI is erroneous. 

 

 

[1] ‘Priority Sector Lending – Targets and Classification’ Reserve Bank of India, July 2012, https://rbi.org.in/scripts/NotificationUser.aspx?Id=7460&Mode=0

[2] Revised Guidelines on Corporate Debt Restructuring Mechanism, Reserve Bank of India, https://www.rbi.org.in/upload/notification/pdfs/67158.pdf

[3] ‘Framework for Revitalising Distressed Assets in the Economy – Guidelines on Joint Lenders’ Forum (JLF) and Corrective Action Plan (CAP)’, Reserve Bank of India, February 26, 2016, https://www.rbi.org.in/scripts/NotificationUser.aspx?Id=8754&Mode=0

[4] Timelines for Stressed Assets, Press Release, Reserve Bank of India, May 5, 2017, https://www.rbi.org.in/Scripts/NotificationUser.aspx?Id=10957&Mode=0

[5] Flexible Structuring of Long Term Project Loans to Infrastructure and Core Industries, RBI, July 15, 2014, https://www.rbi.org.in/scripts/NotificationUser.aspx?Id=9101&Mode=0

[6] Chapter 4, The Economic Survey 2016-17, http://unionbudget.nic.in/es2016-17/echap04.pdf

[7] ‘RBI introduces a ‘Scheme for Sustainable Structuring of Stressed Assets’’ Press Release, Reserve Bank of India, June 13, 2016, https://www.rbi.org.in/Scripts/BS_PressReleaseDisplay.aspx?prid=37210

[8] RBI identifies Accounts for Reference by Banks under the Insolvency and Bankruptcy Code (IBC), Reserve Bank of India, June 13, 2017, https://www.rbi.org.in/scripts/BS_PressReleaseDisplay.aspx?prid=40743