The Civil Liability for Nuclear Damage Bill, 2010 was introduced in the Lok Sabha on may 7, 2010.  The following is PRS’s summary of the Bill (The Bill summary and the Bill along with related media articles can also be accessed on the PRS Website):

The main features of the Bill are:

a. It defines nuclear incidents and nuclear damage, nuclear fuel, material and nuclear installations, and also operators of nuclear installations.

b. It lays down who will be liable for nuclear damage, and the financial limit of the liability for a nuclear incident.

c. It creates authorities who will assess claims and distribute compensation in cases of nuclear damage. It also specifies who can claim compensation for nuclear damage, and how compensation can be claimed and distributed.

d. It specifies penalties for not complying with the provisions of the Bill, or any directions issued under it.

Nuclear damage means (a) loss of life or injury to a person, or loss of, or damage to property caused by a nuclear incident (b) economic loss arising out of such damage to person or property, (c) costs of measures to repair the damage caused to the environment, and (d) costs of preventive measures.

The Atomic Energy Regulatory Board has to notify a nuclear incident within 15 days from the date of a nuclear incident occurring.

The operator of a nuclear installation will be liable for nuclear damage caused by a nuclear incident in that installation or if he is in charge of nuclear material. If more than one operator is liable for nuclear damage, all operators shall be jointly, and also individually liable to pay compensation for the damage. The Bill also provides certain exceptions to an operator’s liability.

The operator has a right of recourse against the supplier and other individuals responsible for the damage under certain conditions.

The Bill states that the total liability for a nuclear incident shall not exceed 300 million Special Drawing Rights (Approximately Rs 2100 crore at current exchange rates).

Within this amount, the liability of the operator shall be Rs 500 crore. If the liability exceeds Rs 500 crore, the central government shall be liable for the amount exceeding Rs 500 crore (up to SDR 300 million). If damage is caused in a nuclear installation owned by the central government, the government will be solely liable.

The Bill allows the central government to create two authorities by notification:

a. Claims Commissioner: The Claims Commissioner will have certain powers of a civil court. Once a nuclear incident is notified, the Commissioner will invite applications for claiming compensation.

b. Nuclear Damage Claims Commission: If the central government thinks that with regard to a nuclear incident (a) the amount of compensation may exceed Rs 500 crore, or (b) it is necessary that claims will be heard by the Commission and not the Claims Commissioner, or (c) that it is in public interest, it can establish a Nuclear Damage Claims Commission. The Commission shall have the same powers as that of a Claims Commissioner.

An application for claiming compensation can be made by (a) person sustaining the injury, (b) owner of the damaged property, (c) legal representative of a deceased person, or (d) an authorised agent. An application can be made within three years from the date of the person having knowledge of nuclear damage. This right to make an application is however exhausted after a period of ten years from the date of the notification of the nuclear incident.

he Civil Liability for Nuclear Damage Bill, 2010 was introduced in the Lok Sabha on May 7, 2010. The main features of the Bill are:

a. It defines nuclear incidents and nuclear damage, nuclear fuel, material and nuclear installations, and also operators of nuclear installations.

b. It lays down who will be liable for nuclear damage, and the financial limit of the liability for a nuclear incident.

c. It creates authorities who will assess claims and distribute compensation in cases of nuclear damage. It also specifies who can claim compensation for nuclear damage, and how compensation can be claimed and distributed.

d. It specifies penalties for not complying with the provisions of the Bill, or any directions issued under it.

§ Nuclear damage means (a) loss of life or injury to a person, or loss of, or damage to property caused by a nuclear incident (b) economic loss arising out of such damage to person or property, (c) costs of measures to repair the damage caused to the environment, and (d) costs of preventive measures.

§ The Atomic Energy Regulatory Board has to notify a nuclear incident within 15 days from the date of a nuclear incident occurring.

§ The operator of a nuclear installation will be liable for nuclear damage caused by a nuclear incident in that installation or if he is in charge of nuclear material. If more than one operator is liable for nuclear damage, all operators shall be jointly, and also individually liable to pay compensation for the damage. The Bill also provides certain exceptions to an operator’s liability.

§ The operator has a right of recourse against the supplier and other individuals responsible for the damage under certain conditions.

§ The Bill states that the total liability for a nuclear incident shall not exceed 300 million Special Drawing Rights (Approximately Rs 2100 crore at current exchange rates).

§ Within this amount, the liability of the operator shall be Rs 500 crore. If the liability exceeds Rs 500 crore, the central government shall be liable for the amount exceeding Rs 500 crore (up to SDR 300 million). If damage is caused in a nuclear installation owned by the central government, the government will be solely liable.

§ The Bill allows the central government to create two authorities by notification:

a. Claims Commissioner: The Claims Commissioner will have certain powers of a civil court. Once a nuclear incident is notified, the Commissioner will invite applications for claiming compensation.

b. Nuclear Damage Claims Commission: If the central government thinks that with regard to a nuclear incident (a) the amount of compensation may exceed Rs 500 crore, or (b) it is necessary that claims will be heard by the Commission and not the Claims Commissioner, or (c) that it is in public interest, it can establish a Nuclear Damage Claims Commission. The Commission shall have the same powers as that of a Claims Commissioner.

An application for claiming compensation can be made by (a) person sustaining the injury, (b) owner of the damaged property, (c) legal representative of a deceased person, or (d) an authorised agent. An application can be made within three years from the date of the person having knowledge of nuclear damage. This right to make an application is however exhausted after a period of ten years from the date of the notification of the nuclear incident.

To contain the spread of COVID-19 in India, the central government imposed a nation-wide lockdown on March 24, 2020.  Under the lockdown most economic activities, other than those classified as essential activities, were suspended.  States have noted that this loss of economic activity has resulted in a loss of income for many individuals and businesses.  To allow some economic activities to start, some states have provided relaxations to establishments from their existing labour laws.  This blog explains the manner in which labour is regulated in India, and the various relaxations in labour laws that are being announced by various states. 

How is labour regulated in India?

Labour falls under the Concurrent List of the Constitution.  Therefore, both Parliament and State Legislatures can make laws regulating labour.  Currently, there are over 100 state laws and 40 central laws regulating various aspects of labour such as resolution of industrial disputes, working conditions, social security, and wages.  To improve ease of compliance and ensure uniformity in central level labour laws, the central government is in the process of codifying various labour laws under four Codes on (i) industrial relations, (ii) occupational safety, health and working conditions, (iii) wages, and (iv) social security.  These Codes subsume laws such as the Industrial Disputes Act, 1947, the Factories Act, 1948, and the Payment of Wages Act, 1936.   

How do state governments regulate labour?

A state may regulate labour by: (i) passing its own labour laws, or (ii) amending the central level labour laws, as applicable to the state.   In cases where central and state laws are incompatible, central laws will prevail and the state laws will be void.  However, a state law that is incompatible with central laws may prevail in that state if it has received the assent of the President.  For example: In 2014, Rajasthan amended the Industrial Disputes Act, 1947.  Under the Act, certain special provisions with regard to retrenchment, lay-off and closure of establishments applied to establishments with 100 or more workers.  For example, an employer in an establishment with 100 or more workers required permission from the central or state government prior to retrenchment of workers.  Rajasthan amended the Act to increase the threshold for the application of these special provisions to establishments with 300 workers.  This amendment to the central law prevailed in Rajasthan as it received the assent of the President. 

Which states have passed relaxations to labour laws?

The Uttar Pradesh Cabinet has approved an ordinance, and Madhya Pradesh has promulgated an ordinance, to relax certain aspects of existing labour laws.  Further, Gujarat, Rajasthan, Haryana, Uttarakhand, Himachal Pradesh, Assam, Goa, Uttar Pradesh, and Madhya Pradesh have notified relaxations to labour laws through rules.

Madhya Pradesh:  On May 6, 2020, the Madhya Pradesh government promulgated the Madhya Pradesh Labour Laws (Amendment) Ordinance, 2020.  The Ordinance amends two state laws: the Madhya Pradesh Industrial Employment (Standing Orders) Act, 1961, and the Madhya Pradesh Shram Kalyan Nidhi Adhiniyam, 1982.  The 1961 Act regulates the conditions of employment of workers and applies to all establishments with 50 or more workers.  The Ordinance increases this threshold to 100 or more workers.  Therefore, the Act will no longer apply to establishments with between 50 and 100 workers that were previously regulated.  The 1982 Act provides for the constitution of a Fund that will finance activities related to welfare of labour.  The Ordinance amends the Act to allow the state government to exempt any establishment or class of establishments from the provisions of the Act through a notification.  These provisions include payment of contributions into the Fund by employers at the rate of three rupees every six months. 

Further, the Madhya Pradesh government has exempted all new factories from certain provisions of the Industrial Disputes Act, 1947.  Provisions related to lay-off and retrenchment of workers, and closure of establishments will continue to apply.  However, the other provisions of the Act such as those related to industrial dispute resolution, strikes and lockouts, and trade unions, will not apply.   This exemption will remain in place for the next 1,000 days (33 months).  Note that the Industrial Disputes Act, 1947 allows the state government to exempt certain establishments from the provisions of the Act as long as it is satisfied that a mechanism is in place for the settlement and investigation of industrial disputes.

Uttar Pradesh

The Uttar Pradesh Cabinet has approved the Uttar Pradesh Temporary Exemption from Certain Labour Laws Ordinance, 2020.  According to news reports, the Ordinance seeks to exempt all factories and establishments engaged in manufacturing processes from all labour laws for a period of three years, subject to the fulfilment of certain conditions.  These conditions include:

  • Wages:  The Ordinance specifies that workers cannot be paid below minimum wage.  Further, workers must be paid within the time limit prescribed in the Payment of Wages Act, 1936.  The Act specifies that: (i) establishments with less than 1,000 workers must pay wages before the seventh day after the last day of the wage period and (ii) all other establishments must pay wages before the tenth day after the last day of the wage period.  Wages must be paid into the bank accounts of workers. 

  • Health and safety:   The Ordinance states that provisions of health and safety specified in the Building and Other Construction Workers Act, 1996 and Factories Act, 1948 will continue to apply.  These provisions regulate the usage of dangerous machinery, inspections, and maintenance of factories, amongst others. 

  • Work Hours:  Workers cannot be required to work more than eleven hours a day and the spread of work may not be more than 12 hours a day. 

  • Compensation:  In the case of accidents leading to death or disability, workers will be compensated as per the Employees Compensation Act, 1923. 

  • Bonded Labour: The Bonded Labour System (Abolition) Act, 1976 will continue to remain in force.  It provides for the abolition of the bonded labour system.   Bonded labour refers to the system of forced labour where a debtor enters into an agreement with the creditor under certain conditions such as to repay his or a family members debt, due to his caste or community, or due to a social obligation.  

  • Women and children:  Provisions of labour laws relating to the employment of women and children will continue to apply.  

It is unclear if labour laws providing for social security, industrial dispute resolution, trade unions, strikes, amongst others, will continue to apply to businesses in Uttar Pradesh for the period of three years specified in the Ordinance.  Since the Ordinance is restricting the application of central level labour laws, it requires the assent of the President to come into effect. 

Changes in work hours

The Factories Act, 1948 allows state governments to exempt factories from provisions related to work hours for a period of three months if factories are dealing with an exceptional amount of work.  Further, state governments may exempt factories from all provisions of the Act in the case of public emergencies.  The Gujarat, Himachal Pradesh, Rajasthan, Haryana, Uttar Pradesh, Goa, Assam and Uttarakhand governments passed notifications to increase maximum weekly work hours from 48 hours to 72 hours and daily work hours from 9 hours to 12 hours for certain factories using this provision.  Further, Madhya Pradesh has exempted all factories from the provisions of the Factories Act, 1948 that regulate work hours.  These state governments have noted that an increase in work hours would help address the shortage of workers caused by the lockdown and longer shifts would ensure fewer number of workers in factories allowing for social distancing to be maintained.   Table 1 shows the state-wise increase in maximum work hours. 

Table 1: State-wise changes to work hours

State

Establishments

Maximum weekly work hours

Maximum daily work hours

Overtime Pay (2x ordinary wages)

Time period

Gujarat

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Not required

Three months

Himachal Pradesh

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Required

Three months

Rajasthan

All factories distributing essential goods and manufacturing essential goods and food

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Required

Three months

Haryana

All factories

Not specified  

Increased from 9 hours to 12 hours 

Required

Two months

Uttar Pradesh

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Not required

Three months*

Uttarakhand

All factories and continuous process industries that are allowed to function by government

Maximum 6 days of work a week

Two shifts of 12 hours each.

Required

Three months

Assam

All factories

Not specified

Increased from 9 hours to 12 hours 

Required

Three months

Goa

All factories

Not specified

Increased from 9 hours to 12 hours 

Required

Approximately three months

Madhya Pradesh

All factories

Not specified

Not specified

Not specified

Three months

Note: *The Uttar Pradesh notification was withdrawn