Yesterday, Members of Parliament in Lok Sabha discussed the situation of drought and drinking water crisis in many states.  During the course of the discussion, some MPs also raised the issue of ground water depletion.  Last month, the Bombay High Court passed an order to shift IPL matches scheduled for the month of May out of the state of Maharashtra.  The court cited an acute water shortage in some parts of the state for its decision. In light of water shortages and depletion of water resources, this blog post addresses some frequently asked questions on the extraction and use of ground water in the country. Q: What is the status of ground water extraction in the country? A: The rate at which ground water is extracted has seen a gradual increase over time.  In 2004, for every 100 units of ground water that was recharged and added to the water table, 58 units were extracted for consumption.  This increased to 62 in 2011.[1]  Delhi, Haryana, Punjab and Rajasthan, saw the most extraction.  For every 100 units of ground water recharged, 137 were extracted. In the recent past, availability of ground water per person has reduced by 15%.  In India, the net annual ground water availability is 398 billion cubic metre.[2]  Due to the increasing population in the country, the national per capita annual availability of ground water has reduced from 1,816 cubic metre in 2001 to 1,544 cubic metre in 2011. Rainfall accounts for 68% recharge to ground water, and the share of other resources, such as canal seepage, return flow from irrigation, recharge from tanks, ponds and water conservation structures taken together is 32%. Q: Who owns ground water? A: The Easement Act, 1882, provides every landowner with the right to collect and dispose, within his own limits, all water under the land and on the surface.[9] The consequence of this law is that the owner of a piece of land can dig wells and extract water based on availability and his discretion.[10]  Additionally, landowners are not legally liable for any damage caused to  water resources as a result of over-extraction.  The lack of regulation for over-extraction of this resource further worsens the situation and has made private ownership of ground water common in most urban and rural areas. Q: Who uses ground water the most? What are the purposes for which it is used? A: 89% of ground water extracted is used in the irrigation sector, making it the highest category user in the country.[3]  This is followed by ground water for domestic use which is 9% of the extracted groundwater.  Industrial use of ground water is 2%.  50% of urban water requirements and 85% of rural domestic water requirements are also fulfilled by ground water. IMAGEThe main means of irrigation in the country are canals, tanks and wells, including tube-wells.  Of all these sources, ground water constitutes the largest share. It provides about 61.6% of water for irrigation, followed by canals with 24.5%. Over the years, there has been a decrease in surface water use and a continuous increase in ground water utilisation for irrigation, as can be seen in the figure alongside. [4]   Q: Why does agriculture rely most on ground water? A: At present, India uses almost twice the amount of water to grow crops as compared to China and United States.  There are two main reasons for this.  First, power subsidies for agriculture has played a major role in the decline of water levels in India.  Since power is a main component of the cost of ground water extraction, the availability of cheap/subsidised power in many states has resulted in greater extraction of this resource.[5]  Moreover, electricity supply is not metered and a flat tariff is charged depending on the horsepower of the pump.  Second, it has been observed that even though Minimum Support Prices (MSPs) are currently announced for 23 crops, the effective price support is for wheat and rice.[6]  This creates highly skewed incentive structures in favour of wheat and paddy, which are water intensive crops and depend heavily on ground water for their growth. It has been recommended that the over extraction of ground water should be minimized by regulating the use of electricity for its extraction.[7]  Separate electric feeders for pumping ground water for agricultural use could address the issue.  Rationed water use in agriculture by fixing quantitative ceilings on per hectare use of both water and electricity has also been suggested.[8]  Diversification in cropping pattern through better price support for pulses and oilseeds will help reduce the agricultural dependence on ground water.[6]     [1] Water and Related Statistics, April 2015, Central Water Commission, http://www.cwc.gov.in/main/downloads/Water%20&%20Related%20Statistics%202015.pdf. [2] Central Ground Water Board website, FAQs, http://www.cgwb.gov.in/faq.html. [3] Annual Report 2013-14, Ministry of Water Resources, River Development and Ganga Rejuvenation, http://wrmin.nic.in/writereaddata/AR_2013-14.pdf. [4] Agricultural Statistics at a glance, 2014, Ministry of Agriculture; PRS. [5] Report of the Export Group on Ground Water Management and Ownership, Planning Commission, September 2007, http://planningcommission.nic.in/reports/genrep/rep_grndwat.pdf. [6] Report of the High-Level Committee on Reorienting the Role and Restructuring of Food Corporation of India, January 2015, http://www.fci.gov.in/app/webroot/upload/News/Report%20of%20the%20High%20Level%20Committee%20on%20Reorienting%20the%20Role%20and%20Restructuring%20of%20FCI_English_1.pdf. [7] The National Water Policy, 2012, Ministry of Water Resources, http://wrmin.nic.in/writereaddata/NationalWaterPolicy/NWP2012Eng6495132651.pdf. [8] Price Policy for Kharif Crops- the Marketing Season 2015-16, March 2015, Commission for Agricultural Costs and Prices, Department of Agriculture and Cooperation, Ministry of Agriculture, http://cacp.dacnet.nic.in/ViewReports.aspx?Input=2&PageId=39&KeyId=547. [9] Section 7 (g), Indian Easement Act, 1882. [10] Legal regime governing ground water, Sujith Koonan, Water Law for the Twenty-First Century-National and International Aspects of Water Law Reform in India, 2010.

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.