The row over Bt Brinjal, a genetically modified version of the plant, provoked the government into imposing a moratorium on the commercial cultivation of the plant in India. The debate has revolved around issues of economic efficacy, human health, consumer choice and farmers’ rights. Jairam Ramesh, the Minister of State for Environment and Forests, made public his views on the subject, a gist of which is given below:
In order to understand the process followed by GEAC before giving the green signal to Bt Brinjal, we have made a timeline in which the plant was approved and the bodies involved in the process.
2000-2005 | Scientific tests carried out by Mahyco on Bt Brinjal |
2006 | Mahyco submits bio-safety data to GEAC (regulatory body under the Ministry of Environment and Forests). Seeks permission for large scale trials. |
Supreme Court stops ongoing field trials of GM crops due to a PIL filed by civil society representatives. | |
2007 | The expert committee 1 set up by GEAC, submits its report. Recommends seven more studies on bio-safety be repeated for reconfirmation of data generated during confined multi-location trials but approves large scale trials. |
Supreme Court lifts ban on GM crop field trials subject to conditions such as isolation distance etc. | |
As per GEAC direction, Indian Institute of Vegetable Research (IIVR) takes up the responsibility of large scale trails of Mahyco's Bt Brinjal trials at 10 research institutions across the country in 2007 and 11 in 2008. | |
2009 | Jan: IIVR submits the results of the large scale trails. Due to concerns raised by several stakeholders, GEAC constitutes another expert committee to look into adequacy of biosafety data generated as well as the concerns raised by all stakeholders. |
Oct 8: Expert-committee 2 submits its report. States benefits of Bt Brinjal far outweigh the perceived and projected risks. | |
Oct 14: GEAC approves the environmental release of Bt Brinjal containing the event EE1 (with one dissent note from P.M. Bhargava). | |
Oct 15: Jairam Ramesh announces a nationwide consultation in January and February of 2010 pending a final decision on this issue. | |
2010 | Jan 13 to Feb 6: Public meetings were organized on the Bt Brinjal issue. The summary of the consultations is available on the Ministry’s website. |
Many states announce ban on commercial cultivation of Bt Brinjal including Uttarakhand, Himachal Pradesh and Karnataka. | |
Feb 9: Jairam Ramesh decides to halt the commercialization of Bt Brinjal. |
On September 14, 2012 the government announced a new FDI policy for the broadcasting sector. Under the policy, FDI up to 74% has been allowed in broadcasting infrastructure services. Previously the maximum level of FDI permitted in most infrastructure services in the sector was 49% through automatic route. There could be three reasons for the increase in FDI in the sector. First, the broadcasting sector is moving towards an addressable (digital) network. As per Telecom Regulatory Authority of India (TRAI), this upgradation could cost Rs 40,000 crore. Second, the increase in FDI was mandated because a higher FDI was allowed for telecommunication services, which too are utilised for broadcast purposes. In telecommunications 74% FDI is allowed under the approval route. Third, within the broadcasting sector, there was disparity in FDI allowed on the basis of the mode of delivery. These issues were referred to by TRAI in detail in its recommendations of 2008 and 2010. Recent history of FDI in broadcasting services In 2008 and 2010 TRAI had recommended an increase in the level of FDI permitted. A comparison of recommendations and the new policy is provided below. As noted in the table, FDI in services that relate to establishing infrastructure, like setting up transmission hubs and providing services to the customers, is now at 49% under automatic route and 74% with government approval. FDI in media houses, on the other hand, have a different level of FDI permitted. TRAI’s recommendations on the two aspects of FDI in broadcasting Digitisation of cable television network: The Cable Televisions Networks Act, 1995 was amended in 2011 to require cable television networks to be digitised. By October 31, 2012 all cable subscriptions in Delhi, Mumbai, Chennai and Kolkata are required to be digitised. The time frame for digitisation for the entire country is December 31, 2014. However, this requires investment to establish infrastructure. As per the TRAI 2010 report, there are a large number of multi-system operators (who receive broadcasting signals and transmit them further to the cable operator or on their own). As per the regulator, this has led to increased fragmentation of the industry, sub-optimal funding and poor services. Smaller cable operators do not have the resources to provide set-top boxes and enjoy economies of scale. As per news reports, the announcement of higher FDI permission would enable the TV distribution industry to meet the October 31 deadline for mandatory digitisation in the four metros. Diversity in television services: FDI in transmitting signals from India to a satellite hub for further transmission (up-linking services) has not been changed. This varies on the basis of the nature of the channel. For non-news channels, FDI up to 100% with government approval was allowed even under the previous policy. However, the FDI limit for news channels is 26% with government approval. In 2008 TRAI had recommended that this be increased to 49%. However, it reviewed its position in 2010. It argued that since FM and up-linking of news channels had the ability to influence the public, the existing FDI level of 26% was acceptable. It also relied upon the level of FDI permitted in the press, stating that parity had to be maintained between the two modes of broadcast. Under the new policy the level of FDI permitted in these sectors has not been changed.