Speaker Meira Kumar has urged political parties to arrive at a consensus on the women’s reservation bill.  The 2008 Bill has the following main features.  1. It reserves one-third of all seats in Lok Sabha and Legislative Assemblies within each state for women.  2. There is quota-within-quota for SCs, STs and Anglo-Indians.  3. The reserved seats will be rotated after each general elections – thus after a cycle of three elections, all constituencies would have been reserved once.  This reservation will be operational for 15 years.  This Bill has had a chequered history.  A similar Bill was introduced in 1996, 1998 and 1999 – all of which lapsed after the dissolution of the respective Lok Sabhas.  A Joint Parliamentary Committee chaired by Geeta Mukherjee examined the 1996 Bill and made seven recommendations.  Five of these have been included in the latest 2008 Bill.  These are (i) reservation for a period of 15 years; (ii) including sub-reservation for Anglo Indians; (iii) including reservation in cases where the state has less than three seats in Lok Sabha (or less than three seats for SCs/STs); (iv) including reservation for the Delhi assembly; and (v) changing “not less than one-third” to “as nearly as may be, one-third”.  Two of the recommendations are not incorporated in the 2008 Bill.  The first is for reserving seats in Rajya Sabha and Legislative Councils.  The second is for sub-reservation for OBC women after the Constitution extends reservation to OBCs. The 2008 Bill was referred to the Standing Committee on Law and Justice.  This Committee failed to reach a consensus in its final report.  The Committee has recommendedthat the Bill “be passed in Parliament and put in action without further delay.  Two members of the Committee, Virender Bhatia and Shailendra Kumar (both belonging to the Samajwadi Party) dissented stating that they were not against providing reservation to women but disagreed with the way this Bill was drafted.  They had three recommendations:  (i) every political party must distribute 20% of its tickets to women; (ii) even in the current form, reservation should not exceed 20% of seats; and (iii) there should be a quota for women belonging to OBCs and minorities. The Standing committee considered two other methods of increasing representation.  One suggestion (part of election commission recommendations) was to requite political parties to nominate women for a minimum percentage of seats.  The committee felt that parties could bypass the spirit of the law by nominating women to losing seats.  The second recommendation was to create dual member constituencies, with women filling one of the two seats from those constituencies.  The Committee believed that this move could “result in women being reduced to a subservient status, which will defeat the very purpose of the Bill”. It is interesting to note that the Committee did not reject the two recommendations of the Geeta Mukherjee Committee that are not reflected in the Bill.  The Committee concluded that the issue of reservations to Rajya Sabha and Legislative Councils needs to be examined thoroughly as the upper Houses play an equally important role under the Constitution.  Incidentally, it is not possible to reserve seats in Rajya Sabha given the current system of elections to that house (see Appendix below). On the issue of  reservations to OBC women, the Committee said that “all other issues may be considered at an appropriate time by Government without any further delay at the present time in the passage of the Bill”. Though the Bill does not have a consensus – it has been opposed by SP, RJD and JD(U) – most parties have publicly expressed their support for it.  The government will likely not find it difficult to muster two-third support in each House of Parliament were the Bill be taken up for consideration and passing.  It would be interesting to see whether the Bill is brought before Parliament in the upcoming Budget Session. Appendix: Impossibility of Reservation in Rajya Sabha Article 80of the Constitution specifies that members of state assemblies will elect Rajya Sabha MPs through single transferable vote.  This implies that the votes are first allocated to the most preferred candidate, and then to the next preferred candidate, and so on.  This system cannot accommodate the principle of reserving a certain number of seats for a particular group.  Currently, Rajya Sabha does not have reservation for SCs and STs. Therefore, any system that provides reservation in Rajya Sabha implies that the Constitution must be amended to jettison the Single Transferable Vote system.

On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER).  During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed.  The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region.  In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.  

A new scheme named PM-DevINE announced to boost infrastructure and social development

In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22.  The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme.  A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.  

One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE).  It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region).  PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture.  The scheme will not replace or subsume existing central sector or centrally sponsored schemes.  The Scheme will be given an initial allocation of Rs 1,500 crore.

Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)

Major Heads

2020-21 Actuals

2021-22 BE

2021-22 RE

2022-23 BE

% change from 2021-22 RE to 2022-23 BE

North East Special Infrastructure Development Scheme

446

675

674

1,419

111%

Schemes of North East Council

567

585

585

702

20%

North East Road Sector Development Scheme

416

696

674

496

-26%

Central pool of resources for North East and Sikkim

342

581

581

-

-

Others

270

322

344

241

-30%

Total

1,854

2,658

2,658

2,800

5%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.

Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS. 

Allocation towards capital outlay less than demand

The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore).  Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges.  The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay.  It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.

Underutilisation of funds over the years

Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1).  For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure).  Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.

Figure 1: Underutilisation of funds by the Ministry since 2011-12

image
 Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
 Sources: Union Budget Documents (2011-12 to 2022-23); PRS
.

Delay in project completion

The Ministry implements several schemes for infrastructural projects such as roads and bridges.  The progress of the certain schemes has been inadequate.   The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project.  Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.

Need to address declining forest cover

The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover.  The Committee took note of the declining forest cover in the North East India.  As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km).  The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities.  The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline.  It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.

Key issues raised by Members during discussion in Rajya Sabha

The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022.  One of the issues highlighted by members was about the Ministry not having its own line Department.  This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects.  Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region.  The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.         

Allocation by Union Ministries to the North East 

Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation).  The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries.  In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region.  The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore).   In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.  

Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)

image   

Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.