Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.

The Uttarakhand Assembly concluded a two-day session on November 30, 2022.  The session was scheduled to be held over five days.  In this post we look at the legislative business that was carried out in the Assembly, and the state of state legislatures. 

13 Bills were introduced and passed within two days 

As per the Session Agenda, a total of 19 Bills were listed for introduction in the span of two days.  13 of these were listed to be discussed and passed on the second day.  These included the Uttarakhand Protection of Freedom of Religion (Amendment) Bill, 2022, University of Petroleum and Energy Studies (Amendment), Bill, 2022, and the Uttarakhand Anti-Littering and Anti-Spitting (Amendment) Bill, 2022.

The Assembly had proposed to discuss and pass each Bill (barring two) within five minutes (see Figure 1).  Two Bills were allocated 20 minutes each for discussion and passing - the Haridwar Universities Bill, 2022, and the Public Service (Horizontal Reservation for Women) Bill, 2022.  As per news reports, the Assembly passed all 13 Bills within these two days (this excludes the Appropriation Bills).  This raises the question on the amount of scrutiny that these Bills were subject to, and the quality of such laws when the legislature intends to pass them within mere minutes.

Figure 1: Excerpt of Uttarakhand Assembly's November 2022 Session Agenda

image

Law making requires deliberation, scrutiny

Our law-making institutions have several tools at their disposal to ensure that before a law is passed, it has been examined thoroughly on various aspects such as constitutionality, clarity, financial and technical capacity of the state to implement provisions, among others.  The Ministry/Department piloting a Bill could share a draft of the Bill for public feedback (pre-legislative scrutiny).  While Bills get introduced, members may raise issues on constitutionality of the proposed law.  Once introduced, Bills could be sent to legislative committees for greater scrutiny.   This allows legislators to deliberate upon individual provisions in depth, understand if there may be constitutional challenges or other issues with any provision.  This also allows experts and affected stakeholders to weigh in on the provisions, highlight issues, and help strengthen the law.  

However, when Bills are introduced and passed within mere minutes, it barely gives legislators the time to go through the provisions and mull over implications, issues, or ways to improve the law for affected parties.  It also raises the question of what the intention of the legislature is when passing laws in a hurry without any discussion.  Often, such poorly thought laws are also challenged in Courts.   

For instance, the Uttarakhand Assembly passed the Uttarakhand Freedom of Religion (Amendment) Bill, 2022 in this session (five minutes had been allocated for the discussion and passing of the Bill).  The 2022 Bill amends the 2018 Act which prohibits forceful religious conversions, and provides that conversion through allurement or marriage will be unlawful.  The Bill has provisions such as requiring an additional notice to be sent to the District Magistrate (DM) for a conversion, and that reconversion to one’s immediate previous religion will not be considered a conversion.  Some of these provisions seem similar to other laws that were passed by states and have been struck down by or have been challenged in Courts.  For example, the Madhya Pradesh High Court while examining the Madhya Pradesh Freedom of Religion Act, 2021 noted that providing a notice to the DM for a conversion of religion violates the right to privacy as the right includes the right to remain silent.  It extends that understanding to the right to decide on one’s faith.  The Himachal Pradesh Freedom of Religion Act, 2006 exempted people who reconvert to their original religion from giving a public notice of such conversion.  The Himachal Pradesh High Court had struck down this provision as discriminatory and violative of the right to equality.  The Court also noted that the right to change one’s belief cannot be taken away for maintaining public order.  

Uttarakhand MLAs may not have had an opportunity to think about how issues flagged by Courts may be addressed in a law that regulates religious conversions. 

Most other state Assemblies also pass Bills without adequate scrutiny

In 2021 44% states passed Bills on the day it was introduced or on the next day.  Between January 2018 and September 2022, the Gujarat Assembly introduced 92 Bills (excluding Appropriation Bills).  91 of these were passed in the same day as their introduction.  In the 2022 Monsoon Session, the Goa Assembly passed 28 Bills in the span of two days.   This is in addition to discussion and voting on budgetary allocation to various government departments.  

Figure 2: Time taken by state legislatures to pass Bills in 2021

Note: The chart above does not include Arunachal Pradesh and Sikkim. A Bill is considered passed within a day if it was passed on the day of introduction or on the next day. For states with bicameral legislatures, bills have to be passed in both Houses. This has been taken into account in the above chart for five states having Legislative Councils, except Bihar (information was not available for Council). 
Sources: Assembly websites, E-Gazette of various states and Right to Information requests; PRS.

Occasionally, the time actually spent deliberating upon a Bill is lesser than the allocated time.   This may be due to disruptions in the House.  The Himachal Pradesh Assembly provides data on the time actually spent discussing Bills.   For example, in the August 2022 Session, it spent an average of 12 minutes to discuss and pass 10 Bills.  However, the Uttarakhand Assembly allocated only five minutes to discuss each Bill in its November 2022 Session.  This indicates the lack of intent of certain state legislatures to improve their functioning.

In the case of Parliament, a significant portion of scrutiny is also carried out by the Department Related Standing Committees, even when Parliament is not in session.  In the 14th Lok Sabha (LS), 60% of the Bills introduced were sent to Committees for detailed examination, and in the 15th LS, 71% were sent.  These figures have reduced recently – in the 16th LS 27% of the Bills were sent to Committees, and so far in the 17th LS, 13% have been sent.  However, across states, sending Bills to Committees for detailed examination is often the exception than the norm.  In 2021, less than 10% of the Bills were sent to Committees.  None of the Bills passed by the Uttarakhand Assembly had been examined by a committee.   States that are an exception here include Kerala which has 14 subject Committees, and Bills are regularly sent to these for examination.  However, these Committees are headed by their respective Ministers, which reduces the scope of independent scrutiny that may be undertaken.

In Budget Session 2018, Rajya Sabha has planned to examine the working of four ministries.  The Ministry of Drinking Water and Sanitation is one of the ministries listed for discussion.  In this post, we look at the key schemes being implemented by the Ministry and their status.

What are the key functions of the Ministry of Drinking Water and Sanitation?

As per the Constitution, supply of water and sanitation are state subjects which means that states regulate and provide these services.  The Ministry of Drinking Water and Sanitation is primarily responsible for policy planning, funding, and coordination of programs for: (i) safe drinking water; and (ii) sanitation, in rural areas.  From 1999 till 2011, the Ministry operated as a Department under the Ministry of Rural Development.  In 2011, the Department was made an independent Ministry.  Presently, the Ministry oversees the implementation of two key schemes of the government: (i) Swachh Bharat Mission-Gramin (SBM-G), and (ii) National Rural Drinking Water Programme (NRDWP).

How have the finances and spending priorities of the Ministry changed over time?

In the Union Budget 2018-19, the Ministry has been allocated Rs 22,357 crore.  This is a decrease of Rs 1,654 crore (7%) over the revised expenditure of 2017-18.  In 2015-16, the Ministry over-shot its budget by 178%.  Consequently, the allocation in 2016-17 was more than doubled (124%) to Rs 14,009 crore.

In recent years, the priorities of the Ministry have seen a shift (see Figure 1).  The focus has been on providing sanitation facilities in rural areas, mobilising behavioural change to increase usage of toilets, and consequently eliminating open defecation.  However, this has translated into a decrease in the share of allocation towards drinking water (from 87% in 2009-10 to 31% in 2018-19).  In the same period, the share of allocation to rural sanitation has increased from 13% to 69%.Figure 1

What has been the progress under Swacch Bharat Mission- Gramin?

The Swachh Bharat Mission was launched on October 2, 2014 with an aim to achieve universal sanitation coverage, improve cleanliness, and eliminate open defecation in the country by October 2, 2019.

Expenditure on SBM-G:  In 2018-19, Rs 15,343 crore has been allocated towards SBM-G.  The central government allocation to SBM-G for the five year period from 2014-15 to 2018-19 has been estimated to be Rs 1,00,447 crore.  Of this, up to 2018-19, Rs 52,166 crore (52%) has been allocated to the scheme.  This implies that 48% of the funds are still left to be released before October 2019.  Figure 2

Construction of Individual Household Latrines (IHHLs):  For construction of IHHLs, funds are shared between the centre and states in the 60:40 ratio.  Construction of IHHLs account for the largest share of total expenditure under the scheme (97%-98%).  Although the number of toilets constructed each year has increased, the pace of annual growth of constructing these toilets has come down.  In 2015-16, the number of toilets constructed was 156% higher than the previous year.  This could be due to the fact that 2015-16 was the first full year of implementation of the scheme.  The growth in construction of new toilets reduced to 74% in 2016-17, and further to 4% in 2017-18.Table 1

As of February 2018, 78.8% of households in India had a toilet.  This implies that 15 crore toilets have been constructed so far.  However, four crore more toilets need to be construced in the next 20 months for the scheme to achieve its target by 2019.

Open Defecation Free (ODF) villages:  Under SBM-G, a village is ODF when: (i) there are no visible faeces in the village, and (ii) every household as well as public/community institution uses safe technology options for faecal disposal.  After a village declares itself ODF, states are required to carry out verification of the ODF status of such a village.  This includes access to a toilet facility and its usage, and safe disposal of faecal matter through septic tanks.  So far, out of all villages in the country, 72% have been verified as ODF.  This implies that 28% villages are left to be verified as ODF for the scheme to achieve its target by 2019.Table 2

Information, Education and Communication (IEC) activities:  As per the SBM-G guidelines, 8% of funds earmarked for SBM-G in a year should be utilised for IEC activities.  These activities primarily aim to mobilise behavioural change towards the use of toilets among people.  However, allocation towards this component has remained in the 1%-4% range.  In 2017-18, Rs 229 crore is expected to be spent, amounting to 2% of total expenditure.

What is the implementation status of the National Rural Drinking Water Programme?

The National Rural Drinking Water Programme (NRDWP) aims at assisting states in providing adequate and safe drinking water to the rural population in the country.  In 2018-19, the scheme has been allocated Rs 7,000 crore, accounting for 31% of the Ministry’s finances.Figure 3

Coverage under the scheme:  As of August 2017, 96% of rural habitations have access to safe drinking water.  In 2011, the Ministry came out with a strategic plan for the period 2011-22.  The plan identified certain standards for coverage of habitations with water supply, including targets for per day supply of drinking water.  As of February 2018, 74% habitations are fully covered (receiving 55 litres per capita per day), and 22% habitations are partially covered (receiving less than 55 litres per capita per day).  The Ministry aims to cover 90% rural households with piped water supply and 80% rural households with tap connections by 2022.  The Estimates Committee of Parliament (2015) observed that piped water supply was available to only 47% of rural habitations, out of which only 15% had household tap connections.

Contamination of drinking water:  It has been noted that NRDWP is over-dependant on ground water.  However, ground water is contaminated in over 20 states.  For instance, high arsenic contamination has been found in 68 districts of 10 states.  These states are Haryana, Punjab, Uttar Pradesh, Bihar, Jharkhand, Chhattisgarh, West Bengal, Assam, Manipur, and Karnataka.Table 3

Chemical contamination of ground water has also been reported due to deeper drilling for drinking water sources.  It has been recommended that out of the total funds for NRDWP, allocation for water quality monitoring and surveillance should not be less than 5%.  Presently, it is 3% of the total funds.  It has also been suggested that water quality laboratories for water testing should be set up throughout the country.