Over the last few days, the retail prices of petrol and diesel have touched an all-time high.  In Delhi, petrol was selling at 74.6/litre on April 25, 2018, while diesel was at 66/litre.

Petroleum products are used as raw materials in various sectors and industries such as transport and petrochemicals.  These products may also be used in factories to operate machinery or generators.  Any fluctuation in the price of petrol and diesel impacts the production and transport costs of various items.  When compared to other neighbouring countries, India has the highest prices for petrol and diesel.

Note: Prices as on April 1, 2018. Prices for India pertain to Delhi. Sources: Petroleum Planning and Analysis Cell, Ministry of Petroleum and Natural Gas; PRS.

Note: Prices as on April 1, 2018. Prices for India pertain to Delhi.
Sources: Petroleum Planning and Analysis Cell, Ministry of Petroleum and Natural Gas; PRS.

How is the price of petrol and diesel fixed?

Historically, the price of petrol and diesel in India was regulated, i.e. the government was involved in the deciding the retail price.  The government deregulated the pricing of petrol in 2010 and diesel in 2014.  This allowed oil marketing companies to determine the price of these products, and revise them every fortnight.

Starting June 16, 2017, prices for petrol and diesel are revised on a daily basis.  This was done to with the idea that daily revision will reduce the volatility in retail prices, and protect the consumer against sharp fluctuations.  The break-up of retail prices of petrol and diesel in Delhi on April 25, 2018 can be found below.  As seen in the table, over 50% of the retail price of petrol comprises central and states taxes and the dealer’s commission.  In case of diesel, this amount is close to 40%.

Table 1: Break-up of petrol and diesel prices in Delhi (on April 25, 2018)

Component

Petrol

Diesel

Rs/litre % of retail price Rs/litre

% of retail price

Price Charged to Dealers 35.7 48% 38.4 58%
Excise Duty (levied by centre) 19.5 26% 15.3 23%
Dealer Commission 3.6 5% 2.5 4%
VAT (levied by state) 15.9 21% 9.7 15%
Retail Price 74.6 100% 65.9 100%
Source: Price Build-up of Petrol and Diesel at Delhi effective April 25, 2018; Indian Oil Corporation Limited.

 

Does India produce enough petroleum to support domestic consumption?

India imports 84% of the petroleum products consumed in the country.  This implies that any change in the global prices of crude oil has a significant impact on the domestic price of petroleum products.  In 2000-01, net import of petroleum products constituted 75% of the total consumption in the country.  This increased to 95% in 2016-17.  The figure below shows the amount of petroleum products consumed in the country, and the share of imports.

Note: Production is the difference between the total consumption in the country and the net imports. Sources: Petroleum Planning and Analysis Cell; PRS.

Note: Production is the difference between the total consumption in the country and the net imports.
Sources: Petroleum Planning and Analysis Cell; PRS.

What has been the global trend in crude oil prices? How has this impacted prices in India?

Over the last five years, the global price of crude oil (Indian basket) has come down from USD 110 in January 2013 to USD 64 in March 2018, having touched a low of USD 28 in January 2016.

While there has been a 42% drop in the price of global crude over this five-period, the retail price of petrol in India has increased by 8%.  During this period, the retail price of diesel increased by 33%.  The two figures below show the trend in prices of global crude oil and retail price of petrol and diesel in India, over the last five years.

Petrol price

Diesel price

 

Note: Subsidy indicated in the graphs is notional.  While calculating the subsidy amount, other factors such as cost of domestic inputs will also have to be accounted.  Global Crude Oil Price is for the Indian basket.  Figures reflect average monthly retail price of petrol and diesel in Delhi.
Sources: Petroleum Planning and Analysis Cell; Indian Oil Corporation Limited; PRS.

 

How has the excise duty on petrol and diesel changed over the last few years?

Under the Constitution, the central government has the powers to tax the production of petroleum products, while states have the power to tax their sale.  Petroleum has been kept outside the purview of the Goods and Services Tax (GST), till the GST Council decides.

Over the years, the central government has used taxes to prevent sharp fluctuations in the retail price of diesel and petrol.  In the past, when global crude oil prices have increased, duties have been cut.  Since 2014, as global crude oil prices declined, excise duties have been increased.

Sources: Petroleum Planning and Analysis Cell; PRS.

Sources: Petroleum Planning and Analysis Cell; PRS.

 

As a consequence of the increase in duties, the central government’s revenue from excise on petrol and diesel increased annually at a rate of 46% between 2013-14 and 2016-17.  During the same period, the total sales tax collections of states (from petrol and diesel) increased annually by 9%.  The figure below shows the trend in overall collections of the central and state governments from petroleum (including receipts from taxes, royalties, and dividends).

 

Notes: Data includes tax collections (from cesses, royalties, customs duty, central excise duty, state sales tax, octroi, and entry tax, among others), dividends paid to the government, and profit on oil exploration. Data sources: Petroleum and Planning Analysis Cell; Central Board of Excise and Customs; Indian Oil Corporation Limited; PRS.

Notes: Data includes tax collections (from cesses, royalties, customs duty, central excise duty, state sales tax, octroi, and entry tax, among others), dividends paid to the government, and profit on oil exploration.
Data sources: Petroleum and Planning Analysis Cell; Central Board of Excise and Customs; Indian Oil Corporation Limited; PRS.

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.