Power is under the concurrent list of the Constitution.[1]  Both the central and state governments have the power to regulate the sector.  The Ministry of Power is responsible for policy formulation and implementation for the electricity sector at the central level.[2]  The Ministry of New & Renewable Energy (MNRE) works towards promotion, development, and regulation of renewable sources such as solar and wind.[3]  This note examines the trends in expenditure by the two Ministries and key issues in the electricity sector.

The Electricity Act, 2003 segments the sector into generation, transmission, and distribution for regulation.[4] Generation is a delicensed activity and refers to electricity production.  Transmission refers to carriage of high-voltage power from power plants to sub-stations, while distribution involves carrying electricity from sub-stations to consumers.  Both transmission and distribution are licensed activities and open to private participation.

There is a significant government presence in the sector.  As of June 2024, 23% of the generation capacity is owned by central government-owned entities and another 24% by the state government-owned entities.[5]  In 2022-23, about 92% of the distribution by both volume and value was undertaken by state government-owned entities.[6]

Overview of Finances

Allocation for 2024-25[7],[8]

Ministry of Power:  In 2024-25, the Ministry of Power has been allocated Rs 20,502 crore, an increase of 16% over the revised estimate for   

Key announcements in the 2024-25 Budget Speech[9]

  • Nuclear energy:  The government will partner with the private sector for R&D on small modular reactors and newer technologies for nuclear energy.
  • Pumped Storage Policy:  A policy for promoting pump storage projects will be formulated.
  • Emission targets for industries:  For certain industries, emission targets will be formulated instead of currently applicable energy efficiency targets.
  • Support to micro and small industries:  Energy audit for micro and small industries will be facilitated.  Financial support will be provided for shifting to cleaner forms of energy and improving energy efficiency.

2023-24 (Table 1).  5% of this allocation is towards capital expenditure.  61% of the total expenditure has been allocated towards the Revamped Distribution Sector Scheme (RDSS).  This scheme was launched in 2021 to provide support to distribution companies for improving financial and operational performance.8  A key component of RDSS is the assistance for installation of prepaid smart meters.[10]  Other key heads of allocation are: (i) assistance to central public sector undertakings for power projects (15% of the allocation) and (ii) strengthening of power systems (12%), which mainly includes spending on transmission systems.

MNRE:  In 2024-25, MNRE has been allocated Rs 19,100 crore, an increase of 143% over the revised estimate for 2023-24.  This significant increase is driven by allocation towards PM Surya Ghar Muft Bijli Yojana.  The scheme was approved in February 2024.[11]  It provides financial assistance to households for installing rooftop solar.11 

 Table 1: Allocation towards Ministries of Power and New & Renewable Energy (Rs crore) 

Head

2022-23 Actuals

2023-24

BE

2023-24 RE

% change from 23-24 BE to RE

2024-25 BE

% change from 23-24 RE to 24-25 BE

Share in Ministry Budget in 24-25

Ministry of Power

9,313

20,671

17,635

-15%

20,502

16%

 

of which

             

     Revamped Distribution Sector Scheme

2,738

12,072

10,400

-14%

12,585

21%

61%

     Assistance to PSUs

2,907

3,931

3,019

-23%

3,021

0%

15%

     Strengthening of Power Systems

2,543

2,903

2,562

-12%

2,416

-6%

12%

Ministry of New & Renewable Energy

7,563

10,222

7,848

-23%

19,100

143%

 

of which

             

     Solar Power-Grid

4,280

4,970

4,757

-4%

8,500

79%

45%

     PM Surya Ghar Muft Bijli Yojana

0

0

0

-

6,250

-

33%

     PM-KUSUM

1,325

1,996

1,100

-45%

1,496

36%

8%

     Wind Power-Grid

1,413

1,214

916

-25%

800

-13%

4%

     Green Energy Corridor

250

500

434

-13%

600

38%

3%

     National Green Hydrogen Mission

0

297

100

-66%

600

500%

3%

Note: BE: Budget Estimates; RE: Revised Estimates.
Sources: Demand No. 71 and 79, Expenditure Budget, Union Budget 2024-25; PRS.

Allocation towards grid-connected solar power project is estimated to increase by 79% over the previous year.  In 2024-25, 0.1% of the total allocation towards MNRE has been allocated for capital expenditure.

Trends in fund utilisation over the years

Ministry of Power:  Over the last decade, fund utilisation by the Ministry of Power has seen wide fluctuations (see Figure 1 on next page).  In 2021-22, the actual expenditure was 41% higher than the budget estimate.  This was owing to higher than budgeted expenditure on multiple schemes such as Integrated Power Development Scheme (IPDS), Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGY), and Strengthening of Power Systems. Upon the launch of RDSS scheme in 2021, the ongoing projects under IPDS and DDUGY have been subsumed under RDSS.10  In 2022-23, actual expenditure by the Ministry was 42% lower than budgeted.  Fund utilisation under RDSS was 64% lower than budgeted.  In 2023-24, as per revised estimates, the overall expenditure by the Ministry of Power is estimated to be 15% lower than budgeted.  Expenditure under RDSS in 2023-24 is estimated to be 14% lower.

Figure 1: Fund utilisation by the Ministry of Power

Note: For 2023-24, revised estimate taken as actuals.
Sources: Demands for Grants of Ministry of Power for various years; PRS.

 Figure 2: Funds allocated to RDSS have been undertutilised (in Rs crore) 

Note: #Since scheme was approved after budget presentation for 2021-22, revised estimate taken as budget estimate.  ^For 2023-24, revised estimate taken as actuals.
Sources: Demands for Grants of Ministry of Power for various years; PRS.

Smart metering

Smart metering is a key focus area under the RDSS scheme for more efficient billing and collection by distribution utilities.[12]  It provides for the installation of meters at consumer level as well as system level.12 The scheme is to be implemented between 2021-22 and 2025-26.10  Table 2 provides data on status of metering as of July 2024.  The scheme targets to install 10 crore smart consumer meters by December 2023 in its first phase.10  As of July 24, 2024, 22.2 crore consumer meters have been sanctioned under RDSS and certain schemes subsumed under it.[13]  Contracts have been awarded for 11.8 crore consumer meters and 1.28 crore consumer meters have been installed.13  In 19 states where consumer meters have been sanctioned, deployment is yet to begin.13  In many other states, deployment has started 2023 onward.13

 Table 2: Status of smart metering as of July 24, 2024 

Type

Sanctioned

Achievement

In number

In %

Consumer Meters

22.2 crore

1.28 crore

6%

Distribution Transformer Meters

52.7 lakh

0.83 lakh

2%

Feeder Meters

1.83 lakh

0.19 lakh

10%

Source:  All India Smart Metering Status, Website of National Smart Grid Mission of Ministry of Power, as accessed on July 29, 2024; PRS.

 MNRE:  Over the last decade, actual expenditure by MNRE has generally been lower than the budget estimate, except in 2021-22 and 2022-23.  In 2023-24, as per revised estimates, the overall expenditure by MNRE is estimated to be 23% lower than budgeted.  A key scheme with lower utilisation is PM-KUSUM (45% lower in 2023-24).  The scheme provides for solarisation of agricultural pumps.7  Expenditure towards grid-connected wind power projects in 2023-24 is estimated to be 25% lower than budgeted.

Figure 3: Low fund utilisation by MNRE 

Note: For 2023-24, revised estimate taken as actuals.
Source: Demands for Grants of MNRE for various years; PRS.

Issues for Consideration

Transition to cleaner energy sources

In 2022-23, 95% of India’s energy supply was sourced from fossil fuels– coal, crude oil, and natural gas (Figure 4).[14]  Fossil fuels are the largest contributor of greenhouse gas emissions (about 75% globally), leading to global warming.[15],[16]  Hence, transition to cleaner energy sources is the centrepiece of climate change mitigation.[17]  This transition is envisaged in two key ways: (i) shifting to non-fossil sources for electricity generation, and (ii) shifting to electricity for final consumption.[18]  In 2022-23, about 22% of the energy consumed in India was in the form of electricity; 75% of this electricity was generated from coal.14  The rest came from sources such as hydro, solar, and wind.

Figure 4: 75% of electricity generation in 2022-23 was from coal

Source: India Energy Statistics 2024, MoSPI; PRS.

As part of its climate-related commitments, by 2030, India aims to achieve: (i) 500 GW of non-fossil generation capacity, (ii) meeting at least 50% of its electricity requirement from renewable sources.[19]  The Central Electricity Authority (2023) projected that much of the renewable energy capacity will come from solar and wind.[20]  Solar and wind are projected to have 42% and 14% share in the total installed capacity by 2031-32 (Table 3).20  35% of the total generation is expected to be met from these two sources.20  Nuclear energy capacity is projected to increase from 8 GW as of June 2024 to 20 GW by 2031-32.20

For the same amount of power generation, a higher installed capacity is needed in case of solar and wind as compared to other sources.  For instance, coal capacity can be utilised up to 90% of the time, whereas the highest possible capacity utilisation in case of solar is estimated to be 20%-22% and that of wind power in the range of 30%-40%.[21]

Capacity addition targets missed

India had set a target of achieving installed capacity of 100 GW of solar and 60 GW of wind power by 2022.23  As of June 2024, the installed capacity of solar stood at 85 GW and that of wind at 47 GW.[22]  Key reasons for underachievement on targets include: (i) issues with land acquisition, (ii) delay in clearances, (iii) contractual disputes, (iv) disruption in global supply chain due to COVID-19, and (v) policy uncertainty due to changes in tariff regimes and re-negotiation of power purchase agreements.20,,[23],[24] 

 Table 3: All-India installed capacity (in GW) 

Source

June 2024

March 2032 Projected

Capacity

In %

Capacity

In %

Solar

85

19%

365

42%

Coal

218

49%

260

30%

Wind

47

10%

122

14%

Large Hydro
(>25 MW)

47

11%

62

7%

Gas

25

6%

25

3%

Nuclear

8

2%

20

2%

Biomass

11

2%

16

2%

Small Hydro
(<=25 MW)

5

1%

5

1%

Diesel

1

0%

-

-

Total

446

-

874

-

Pumped Hydro Storage

-

-

27

-

Battery Storage

-

-

47

-

Sources: Installed Capacity Report for June 2024, Central Electricity Authority; National Electricity Plan Generation Vol. I, May 2023, Central Electricity Authority; PRS.

Table 4: Capacity added during 2017-2022 lower than target (in GW)

Source

Target/Scheduled

Actual

Gap

Actual as % of Target

Solar

88

42

46

48%

Coal

48

31

17

65%

Wind

28

8

20

29%

Hydro

7

3

4

43%

Nuclear

3

0

3

0%

Biomass and Gas

2

2

0

100%

Total

176

85

91

48%

Source: Draft National Electricity Plan, Vol I, March 2023, Central Electricity Authority; PRS.

Challenges with financing

The Standing Committee on Energy (2022) noted that there is a huge gap between the required and actual investment for renewable capacity addition.[25]  Against the required annual investment of Rs 1.5-2 lakh crore, the actual annual investment in the last few years was around Rs 75,000 crore.25  It observed that the banking sector has been reluctant towards financing renewable energy projects.25  The Committee recommended the Ministry of New and Renewable Energy to: (i) find alternative financing mechanisms such as green bonds and infrastructure investment trusts, and (ii) explore the possibility of prescribing banks and financial institutions to lend a minimum percentage to renewable energy projects through a Renewable Finance Obligation.25  It recommended the Ministry of New and Renewable Energy to encourage financing projects by public sector lenders such as Power Finance Corporation (PFC) and Indian Renewable Energy Development Agency (IREDA).25  It also recommended that the government should reduce or exempt guarantee fee charged to lenders such as PFC and IREDA.25  The fee is charged at the rate up to 1.2% per annum on funds raised from the international market.25

Availability of solar panels

In the recent years, India has imported more than 75% of its installed solar panels.[26],[27]  To arrest import, the central government has taken several measures.27,[28]  In 2022, import tariffs on solar panels as well as raw material for such panels was increased.27  These policies have led to an increase in price in the short-term.27  At the same time, in 2020, the central government had introduced the production-linked incentive to promote domestic manufacturing.[29]  Annual solar panel manufacturing capacity of 48 GW is expected to be added under this scheme by 2026.[30]

Driven by these incentives, domestic manufacturing capacity for solar panels is expected to rapidly increase over the next five years and be sufficient to meet the domestic demand thereafter.27  However, India may need to continue to import polysilicon and wafer, which are needed to make solar panels.27,[31]

Rooftop solar capacity below target

Through the Rooftop Solar Programme, India had aimed to achieve 40 GW of solar capacity by the end of 2022.[32]  As of December 2023, only 10.4 GW of rooftop solar capacity was added.[33]  The Standing Committee on Energy (2022) observed that roof-top systems are not attractive for consumers due to: (i) non-availability of information at grass root level, (ii) time consuming and complicated procedures for setting up, and (iii) delays in subsidies.[34] 

PM-Surya Ghar Muft Bijli Yojana was approved in February 2024 with the aim of increasing the share of rooftop solar capacity.11  Under this scheme, financial assistance will be provided to one crore households to install rooftop solar.11  This is expected to help them obtain free electricity up to 300 units every month.11

Solarisation of agricultural pumps below target

The PM-KUSUM scheme aims to achieve a solar capacity of 35 GW through solarisation of agricultural pumps and small solar power plants on barren agricultural land.[35],[36]  It aims to add 10 GW of small solar power plants.35,[37]  Originally, this capacity was to be added by 2022.37,[38]  The target has subsequently been revised to 2025-26.[39]  The Ministry of New and Renewable Energy (2023) observed that onset of COVID-19 pandemic affected capacity addition under the scheme during 2020-21 and 2021-22.35  It also observed that access to affordable finance and lack of subsidy from state governments are among key reasons for poor uptake of the scheme.35,[40]

Table 5: Targets vs Achievement under the PM-KUSUM Scheme (as of November 2023)

Parameter

Target

Achievement

In %

Grid-connected Decentralised Solar Plants

10,000 MW

141 MW

1.4%

Stand-alone Solar Pumps

14 lakh

2.8 lakh

20%

Grid-connected Solar Pumps

35 lakh

4,594

0.1%

Source: ‘Progress and Implementation of PM Kusum Scheme’, Press Information Bureau, Ministry of New and Renewable Energy, December 23, 2023; PRS.

Need for storage capacity

Power generation from solar and wind are intermittent in nature.[41]  The variability is due to external factors which are beyond human control.41  There may also be mismatch between demand and supply.  For instance, there may be a higher demand for electricity during the evening hours but solar power cannot be generated at that time.  For their effective integration at large scale, availability of affordable storage systems is crucial.[42]  Battery and pump storage are expected to be two primary options for storage in India.20  In pump storage, water is pumped and stored upstream with surplus energy, which can later be used to run turbines.  CEA has projected that India will aim to add 27 GW of pump storage capacity and 47 GW of battery energy storage system for this purpose.20

In case of solar power in India, IEA (2021) observed that as of 2020, new solar power with battery storage systems were more expensive than new coal power.43  Although, this is expected to change by 2030 (30% lower per unit).[43]  By 2030, solar energy with battery storage is also expected to be competitive with existing coal capacity.43  This is expected to be driven by a consistent decline in prices of batteries as well as solar panels.21,43,[44] [45]

In 2021, the Union Cabinet approved production-linked incentive scheme for domestic manufacturing of advanced batteries.[46]  Under this scheme, annual battery manufacturing capacity of 40 GWh will be added.46  The scheme is administered by the Ministry of Heavy Industries.46  In September 2023, the Cabinet also approved viability gap funding scheme for battery energy storage systems.[47]  It envisages development of 4,000 GWh of storage projects by 2030-31.48

Declining capacity utilisation of coal plants

In 2009-10, plant load factor (PLF) for coal and lignite plants was 84%, which has come down to 57% in 2022-23.[48]  PLF is a measure of the output of a power plant compared to the maximum output it could produce.  This may be due to: (i) availability of surplus capacity in certain regions, (ii) low demand for power, (iii) demand being met from other sources such as renewables, and (iv) unavailability of fuel.  Poorer capacity utilisation may increase the unit cost of electricity generation from these plants and may also present challenge of financial viability before some of them.  CEA has projected that PLF of coal-based power plants will continue to hover around 58-59% till 2031-32.20

Addition of transmission lines

Transmission systems need to be augmented in view of new generation capacity and increase in demand for carrying capacity.[49]  Between 2017-18 and 2021-22, India had targeted to add 1,10,281 circuit kilometre (ckm) of transmission lines.49  However, the achievement was 81% (88,865 ckm).49  CEA observed that reasons for delay include: (i) right-of-way issues, (ii) delay in getting forest clearances, (iii) contractual issues, (iv) delay in land acquisition, and (v) onset of COVID-19 pandemic.49  CEA projects that India will need to add 1,23,577 ckm of transmission lines between 2022-23 and 2026-27.49  Under the Green Energy Corridor, the central government has been funding laying of transmission lines for evacuating power from renewable energy projects.[50]  Phase-II of the project is estimated to provide for evacuation of 33 GW of renewable energy.50 

Availability of power

Over the years, availability of power has considerably improved.[51]  Energy deficit at the national level in 2023-24 was 0.3%.[52]  Energy deficit refers to the percentage of power demanded which was not supplied.  Peak deficit at the national level in 2023-24 was 1.4%.52  Peak deficit refers to the shortfall in supply during the highest consumption period in a day.  However, some states saw relatively higher peak deficits in 2023-24 (see Table 6 in annexure).  These include: (i) Maharashtra (10.2%), (ii) Jharkhand (7.9%), and (ii) Bihar (7.8%).52  Further, availability of 24X7 power supply is yet to be achieved.  In July 2024, the Ministry of Power observed that average power supply in rural areas is 21.9 hours in 2024 and 23.4 hours in urban areas.51  High variance exists across states on these parameters (Table 7 in annexure).[53]  For instance, in 2021-22, average number of hours of power supply in rural areas was 13.3 hours in Himachal Pradesh and 16.3 hours in Haryana.53

Financial health of distribution companies

In almost all parts of the country, electricity distribution is a local monopoly business, i.e., a single company, typically a state government-owned entity, serves all consumers in a given area.  These companies have long-term bilateral contracts with generators which are government as well as private companies, to meet a majority of its expected demand.  Tariffs for power procured from generators are determined by Regulatory Commissions, except where the tie-up is through competitive bidding.  Although private participation is permitted, their presence among discoms is limited.  In 2022-23, the state government-owned enterprises and power departments taken together had a 93% share in the electricity distribution sector by both revenue earned and volume of energy sold.[54]

The distribution segment is the interface between consumers and the entire value chain of the power sector, and thus, is key to revenue realisation for the entire sector.  Discoms have continued to register financial losses and have required government support from time to time to be bailed out from these situations.  For instance, in 2015, under UDAY scheme, state governments had to take over 75% of the debt of their discoms worth Rs 2.3 lakh crore.[55]  They were also required to provide grants for any future losses.  Persistent financial problems result in delays in payments and non-payment of outstanding dues to generators, which in turn also impacts their fuel suppliers, i.e., coal companies.  In six years between 2017-18 and 2022-23, cumulative losses were Rs. 3.6 lakh crore.[56]  In 2022-23, on average, distribution utilities spent Rs 7.1 per unit to earn Rs 6.7, resulting in revenue gap of 39 paise per unit. 56  Persistent losses have also led to a rise in indebtedness for these companies.54  Key reasons for persistent losses by distribution utilities are discussed on next page.

 Figure 5: Discoms continue to make losses (Rs crore) 


Note: Losses above are based on actual subsidy received excluding revenue grant under UDAY, and regulatory income (receivables in future).
Source: Reports on Performance of Power Utilities, Power Finance Corporation; PRS.

 Figure 6: Outstanding debt of discoms has been rising (Rs lakh crore) 

Source: Reports on Performance of Power Utilities, Power Finance Corporation; PRS.

Technical and commercial losses

In 2022-23, on aggregate, distribution utilities could bill only 87% of the electricity they injected into the grid.  Of which, they collected 97% of the amount they billed.54  This amounted to aggregate technical and commercial losses of 15.4%.54  AT&C losses range between as low as 7% in Kerala, and as high as 25% in Bihar, 30% in Jharkhand, and 52% in Arunachal Pradesh, respectively.54  These losses can be attributed to: (i) technical losses which include some unavoidable loss in energy transfer, (ii) inefficiencies in energy transfer due to the sub-optimal condition of the network, and (iii) commercial losses such as theft by tapping in and bypassing metering, inadequate metering, and payment default by consumers.  The Revamped Distribution Sector Scheme, launched in 2021, seeks to bring down AT&C losses to 12%-15% by 2024-25.[57]

Underpricing of tariff

Tariffs charged to consumers are regulated by State Electricity Regulatory Commissions.  Often, tariffs are designed on a multi-year basis.  At times, they are designed such that the tariff is lower than the cost in initial years, and cost recovery is offloaded to upcoming years.  These costs, recoverable in future, are termed regulatory income.  For instance, in 2022-23, Maharashtra discoms booked a regulatory income of Rs 16,614 crore.54  However, non-recovery of costs would add up as annual losses for discoms.  This would also require discoms to incur costs on working capital loans.

Tamil Nadu’s discom TANGEDCO, which observes lower AT&C losses (10%) than the national average, was the among the highest loss-making discoms in the country for a few consecutive years.  This situation has been due to under-pricing of tariffs.  A white paper released by the Tamil Nadu government (2021) had observed that electricity tariffs were not revised in Tamil Nadu for seven years.[58]  The Electricity (Amendment) Bill, 2022, which lapsed with the dissolution of 17th Lok Sabha, sought to provide that tariff should recover all prudent costs.[59]

Power procurement cost

Power procurement costs constitute about 70%-80% of the total costs of discoms.56  Power procurement cost varies significantly across states, from as low as about Rs 2.9-3.1 per kWh in Kerala and Himachal Pradesh, to as high as Rs 5.5-6 per kWh in states such as Delhi and Karnataka.56  For source-wise power purchase cost at the national level, see Table 8 in annexure.  A study report for NITI Aayog (2021) observed that discoms have entered into expensive and long-term thermal PPAs based on incorrect estimates of power demand.[60]  Fixed costs of the excess capacity must be paid, even if power is not generated by the generation company.  In many states, a high percentage of power demand is tied up in long-term contracts.60  Gujarat, Karnataka and Rajasthan have almost 100% of their maximum demand tied up.60  While these arrangements give security in planning supply, they limit the discoms’ ability to take advantage of lower power costs in short-term markets.  Fixed costs, which are roughly 47% of the cost will still have to be paid under these long-term contracts if the discom looks for alternative cheaper sources for procuring power.60

As discussed earlier, about 75% of the electricity is generated from coal.  There is some dependence on import for meeting coal requirement.  In 2022-23, about 5% of the coal requirement for the electricity sector was met from import.[61],[62]  Rise in coal prices in international markets may also raise prices for power.  In 2021-22, India imported coal at an average price of Rs 8,300 per tonne.  This rose to Rs 12,500 per tonne in 2022-23, an increase of 51%.61  Coal was primarily imported from Indonesia, and prices shot up due to the Russia-Ukraine war, and demand surge by countries such as India and China.61  In October 2023, the Ministry of Power directed all generation companies to continue using at least 6% imported coal until March 2024.[63]  The Ministry had observed that due to variability in rainfall, hydro power generation was lower, this had increased the dependence on coal for meeting demand.63  To reduce coal import, the Standing Committee on Coal (2023) recommended: (i) increasing the minimum assured supply of coal from 75% to 80%, (ii) exploring new mining sites and expediting operationalisation of mines, and (iii) augmenting coal washing capacity.[64]

Cross-subsidy in pricing of power

Cross-subsidy is a tariff mechanism where some consumer categories pay a higher price to subsidise the consumption of other consumer categories.  Typically, industrial and commercial consumers cross-subsidise the consumption of residential and agricultural consumers.  NITI Aayog (2019) observed that in many states, cross-subsidies have been higher than the long-term policy goal of limiting it within ± 20% of the average cost of supply.[65]  Higher electricity prices may make industries uncompetitive.  This may create an incentive for them to look for direct procurement from generators or set up their own power plants.  In turn, this may make discoms lose out on consumers with higher consumption levels and higher paying capacity.  This would adversely affect their revenue prospects. 

Cross-subsidy along with explicit government subsidy pay for the provisioning of unmetered free power in many parts of the country.  Not metering consumption may encourage injudicious use of electricity, and also leads to accounting issues for discoms.  NITI Aayog (2019) observed that unmetered free power to farms has had an adverse impact on groundwater levels due to the injudicious use of tube wells.[66]

Compliance with RPO

To spur demand for renewable energy, distribution utilities (discoms) are obligated to procure a minimum percentage of their electricity supply from renewable sources, referred to as renewable purchase obligation (RPO).  In 2022-23, 15 states met their RPO obligation (Table 10 in annexure).[67] The Union Ministry of Power (2022) had observed that discoms perceive renewable energy to be expensive and having additional costs towards integration.23  As per an October 2023 notification, RPO is set at 29.9% for 2024-25 and will progressively rise to 43.3% in 2029-30.[68]

Open Access

As per the Electricity Act, consumers with a demand of 1 MW and above are permitted to procure electricity from sources other than the local discom.[69]  Discoms and transmission companies are mandated to provide such consumers with non- subsidy surcharge are payable for such access.  This mechanism is commonly referred to as open discriminatory access to their network access.  Open access aims to: (i) induce efficiency improvement in electricity distribution companies through healthy competition in the power market, (ii) provide choice to consumers for procuring power from their preferred supplier.[70]  Consumers would opt for open access to benefit from lower prices elsewhere.  In June 2022, the Ministry of Power notified the Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022.[71]  The Rules propose a framework for open access to renewable energy (from sources including solar, wind, hydro, and waste-to-energy).  This framework allows consumers with a demand or sanctioned load of 100 kilowatts and above to access renewable energy through open access.

The Standing Committee on Energy (2022) observed that adoption of open access has been below potential.[72]  One of the key reasons has been high surcharges levied by regulatory commissions to protect the prevailing cross-subsidy level.72  If large consumers move away from the local discom, the cross-subsidy level for other consumers of that discom gets adversely impacted.  Hence, a cross-subsidy surcharge was envisaged under the Electricity Act to protect the subsidy level.  However, these high charges lead to open access becoming financially unattractive.70  A 2019 study for NITI Aayog also highlighted some operational barriers observed with open access: (i) distribution and transmission licensees denying access citing capacity constraints, (ii) onerous conditions regarding the minimum level of drawl and advance scheduling of power despatch (citing grid discipline), and (iii) delay in executing maintenance requests.65

 

Annexure

 Table 6: Energy and peak deficit in 2023-24 (in %) 

State

Energy Deficit

Peak Deficit

Andhra Pradesh

0.1%

0.0%

Arunachal Pradesh

0.0%

0.2%

Assam

0.8%

0.0%

Bihar

1.4%

7.8%

Chhattisgarh

0.1%

0.0%

Delhi

0.0%

0.0%

Goa

0.0%

0.0%

Gujarat

0.0%

1.1%

Haryana

0.5%

1.9%

Himachal Pradesh

0.3%

0.0%

Jammu and Kashmir

1.4%

1.5%

Jharkhand

3.8%

7.9%

Karnataka

0.2%

0.0%

Kerala

0.0%

0.0%

Madhya Pradesh

0.2%

2.4%

Maharashtra

0.1%

10.2%

Manipur

1.5%

3.8%

Meghalaya

7.6%

0.0%

Mizoram

0.0%

0.0%

Nagaland

0.0%

0.1%

Odisha

0.1%

0.0%

Puducherry

0.0%

0.0%

Punjab

0.0%

0.0%

Rajasthan

0.6%

0.0%

Sikkim

0.0%

0.3%

Tamil Nadu

0.0%

0.0%

Telangana

0.0%

0.0%

Tripura

0.0%

0.0%

Uttar Pradesh

0.3%

1.5%

Uttarakhand

0.7%

8.7%

West Bengal

0.1%

0.0%

All-India

0.3%

1.4%

Source: Executive Summary Report for April 2024, Central Electricity Authority; PRS

Table 7: Average number of hours of power supply in 2021-22 

State Name

Urban

Rural

Andhra Pradesh

23.9

23.6

Arunachal Pradesh

22.7

-

Assam

23.7

-

Bihar

23.6

20.4

Chhattisgarh

23.8

21.3

Delhi

24.0

-

Goa

23.7

-

Gujarat

24.0

23.5

Haryana

23.6

16.3

Himachal Pradesh

23.9

13.3

Jammu and Kashmir

22.3

-

Jharkhand

23.3

-

Karnataka

23.6

17.6

Kerala

23.9

19.6

Ladakh

23.8

-

Madhya Pradesh

23.9

19.4

Maharashtra

24.0

23.2

Manipur

23.7

-

Meghalaya

23.9

-

Mizoram

23.9

-

Nagaland

23.5

-

Odisha

23.7

23.0

Punjab

23.7

22.1

Rajasthan

23.9

21.3

Tamil Nadu

24.0

22.2

Telangana

23.9

21.9

Tripura

23.9

19.9

Uttar Pradesh

23.5

15.9

Uttarakhand

23.6

21.6

West Bengal

23.8

23.5

All-India

23.8

20.6

Note: Data not available for states indicated with dash (-).
Source: Unstarred Question No. 1964, Lok Sabha, Ministry of Power, answered on July 28, 2022; PRS.

 Table 8: Weighted Average Power Purchase Cost (Rs per unit) 

Source

2015-16

2016-17

2017-18

2018-19

2019-20

2020-21

2021-22

2022-23

Bio Power

4.45

4.71

5.4

5.53

5.11

4.96

4.96

5.65

Coal

3.50

3.67

3.7

3.82

4.14

4.16

4.29

4.34

Diesel

11.44

12.73

15.9

20.52

16.54

18.32

19.91

30.21

Hydro

2.07

2.28

2.22

2.25

2.28

2.33

2.3

2.45

Nuclear

2.82

2.85

3.27

3.31

3.53

3.49

3.49

3.6

Oil and Gas

4.72

4.46

4.29

4.79

5.04

4.92

5.15

5.35

Small Hydro

3.11

3.19

2.76

2.8

2.85

2.28

2.75

2.84

Solar

6.94

7.13

5.87

5.26

4.7

4.48

4.15

3.97

Wind

4.05

4.27

4.43

4.39

4.2

4.13

3.66

4.04

Source: India Climate and Energy Dashboard, NITI Aayog; PRS.

 Table 9: Performance of distribution utilities in 2022-23 

State/UT

AT&C Losses

ACS

(Rs per unit)

ARR

(Rs per unit)

ACS-ARR Gap

(Rs per unit)

State Sector

15.8%

7.2

6.7

0.47

Andaman & Nicobar Islands

19.8%

34.2

32.0

2.20

Andhra Pradesh

8.0%

7.4

7.6

-0.22

Arunachal Pradesh

51.7%

6.7

6.7

0.00

Assam

16.2%

8.1

7.4

0.62

Bihar

25.0%

6.7

6.8

-0.03

Chhattisgarh

16.1%

5.5

5.2

0.29

Delhi

10.7%

11.2

10.2

0.94

Goa

11.9%

5.9

6.0

-0.14

Gujarat

10.7%

6.2

6.2

-0.02

Haryana

12.0%

6.8

6.9

-0.15

Himachal Pradesh

10.6%

6.6

5.6

0.93

Jharkhand

30.3%

7.4

4.9

2.50

Karnataka

13.9%

8.1

7.7

0.43

Kerala

7.1%

6.6

6.2

0.33

Ladakh

30.3%

7.5

5.3

2.18

Madhya Pradesh

20.6%

6.0

5.7

0.30

Maharashtra

18.6%

7.7

7.3

0.40

Manipur

13.8%

8.3

7.1

1.15

Meghalaya

24.0%

5.6

4.9

0.67

Mizoram

26.3%

9.7

8.0

1.70

Nagaland

45.8%

8.2

8.5

-0.32

Puducherry

17.5%

6.2

5.8

0.39

Punjab

11.3%

6.4

5.7

0.69

Rajasthan

15.9%

6.6

6.4

0.24

Sikkim

36.7%

4.3

4.9

-0.69

Tamil Nadu

10.3%

8.9

8.0

0.89

Telangana

18.7%

7.8

6.4

1.40

Tripura

28.2%

6.3

5.4

0.89

Uttar Pradesh

22.3%

8.1

6.9

1.19

Uttarakhand

15.3%

6.1

5.3

0.72

West Bengal

17.3%

6.1

6.1

-0.01

Private Sector

10.9%

6.7

7.2

-0.49

Dadra & Nagar Haveli and Daman & Diu

3.6%

6.0

6.2

-0.15

Delhi

7.1%

7.6

8.2

-0.62

Gujarat

3.9%

7.7

8.2

-0.50

Maharashtra

6.5%

8.0

9.1

-1.09

Odisha

21.9%

4.9

5.0

-0.10

Uttar Pradesh

8.4%

6.3

6.9

-0.64

West Bengal

8.2%

7.1

8.0

-0.89

All-India

15.4%

7.1

6.7

0.39

Note: AT&C losses: Aggregate Technical and Commercial (AT&C) loss is the ratio of power for which the discom did not receive any payment to the total electricity procured by the utility.  *ACS: Average Cost of Supply; ARR: Average Revenue Realised.  ARR indicated above is on subsidy billed basis.
Source: Report on Performance of Power Utilities 2022-23, Power Finance Corporation; PRS.

 Table 10: Compliance with Renewable Purchase Obligation in 2022-23 

State

Target

Achievement

Wind

Hydro

Other

Total

Wind

Hydro

Other

Total

Andhra Pradesh

0.81%

0.35%

23.44%

24.61%

3.30%

0.00%

25.10%

28.50%

Arunachal Pradesh

0.81%

0.35%

23.44%

24.61%

0.00%

3.50%

15.30%

18.80%

Assam

0.81%

0.35%

23.44%

24.61%

0.00%

2.70%

20.40%

23.20%

Bihar

0.81%

0.35%

23.44%

24.61%

0.10%

0.10%

15.90%

16.00%

Chhattisgarh

0.81%

0.35%

23.44%

24.61%

0.10%

1.20%

11.90%

13.30%

Delhi

0.81%

0.35%

23.44%

24.61%

0.00%

0.60%

23.80%

24.40%

Goa

0.81%

0.35%

23.44%

24.61%

0.80%

0.40%

16.10%

17.30%

Gujarat

0.81%

0.35%

23.44%

24.61%

3.50%

0.20%

16.50%

20.30%

Haryana

0.81%

0.35%

23.44%

24.61%

0.00%

0.90%

20.80%

21.70%

Himachal Pradesh

0.81%

0.35%

23.44%

24.61%

0.00%

2.70%

76.00%

78.70%

Jammu & Kashmir & Ladakh UT

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

56.90%

56.90%

Jharkhand

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

30.00%

30.00%

Karnataka

0.81%

0.35%

23.44%

24.61%

6.40%

0.00%

40.30%

46.70%

Kerala

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

36.30%

36.30%

Madhya Pradesh

0.81%

0.35%

23.44%

24.61%

0.10%

0.00%

22.30%

22.40%

Maharashtra

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

17.10%

17.10%

Manipur

0.81%

0.35%

23.44%

24.61%

0.00%

0.20%

33.80%

34.00%

Meghalaya

0.81%

0.35%

23.44%

24.61%

0.00%

3.20%

56.70%

59.90%

Mizoram

0.81%

0.35%

23.44%

24.61%

0.30%

0.40%

42.10%

42.70%

Nagaland

0.81%

0.35%

23.44%

24.61%

0.00%

5.20%

31.30%

36.50%

Odisha

0.81%

0.35%

23.44%

24.61%

0.10%

0.10%

25.30%

25.40%

Puducherry

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

6.60%

6.60%

Punjab

0.81%

0.35%

23.44%

24.61%

0.20%

0.00%

27.30%

27.60%

Rajasthan

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

18.30%

18.30%

Sikkim

0.81%

0.35%

23.44%

24.61%

0.00%

3.70%

84.70%

88.40%

Tamil Nadu

0.81%

0.35%

23.44%

24.61%

5.80%

0.00%

19.70%

25.50%

Telangana

0.81%

0.35%

23.44%

24.61%

0.00%

0.00%

20.20%

20.20%

Tripura

0.81%

0.35%

23.44%

24.61%

0.00%

0.10%

13.50%

13.60%

Uttar Pradesh

0.81%

0.35%

23.44%

24.61%

0.00%

0.40%

14.80%

15.20%

Uttarakhand

0.81%

0.35%

23.44%

24.61%

0.00%

3.00%

57.40%

60.40%

West Bengal

0.81%

0.35%

23.44%

24.61%

0.10%

0.00%

15.90%

15.90%

Source:  Starred Question No. 122, Rajya Sabha, Ministry of Power, August 1, 2023; PRS.

 

[1] Entry No. 38, List III- Concurrent List, Seventh Schedule, Constitution of India, https://cdnbbsr.s3waas.gov.in/s380537a945c7aaa788ccfcdf1b99b5d8f/uploads/2024/07/20240716890312078.pdf.

[2] “About Ministry”, Website of Ministry of Power as accessed on July 29, 2024, https://powermin.gov.in/en/content/about-ministry.

[5] Installed Capacity Report – June 2024, Central Electricity Authority, https://cea.nic.in/wp-content/uploads/installed/2024/06/IC_June_2024_allocation_wise.pdf.

[7] Demand No. 71, Expenditure Budget, Ministry of New and Renewable Energy, Union Budget 2024-25, https://www.indiabudget.gov.in/doc/eb/sbe71.pdf.

[8] Demand No. 79, Expenditure Budget, Ministry of Power, Union Budget 2024-25, https://www.indiabudget.gov.in/doc/eb/sbe79.pdf.

[9] Budget Speech, Union Budget 2024-25, https://www.indiabudget.gov.in/doc/Budget_Speech.pdf.

[10] “Cabinet approves Revamped Distribution Sector Scheme: A Reforms based and Results linked Scheme”, Press Information Bureau, Union Cabinet, June 30, 2021, https://pib.gov.in/PressReleasePage.aspx?PRID=1731473.

[11] “Cabinet approves PM-Surya Ghar: Muft Bijli Yojana for installing rooftop solar in One Crore households”, Press Information Bureau, Union Cabinet, https://pib.gov.in/PressReleasePage.aspx?PRID=2010130.

[12] Guidelines for Revamped Distribution Sector Scheme, Ministry of Power, https://powermin.gov.in/sites/default/files/uploads/Final_Revamped_Scheme_Guidelines.pdf.

[13] All India Smart Metering Status, Ministry of Power, as accessed on July 30, 2024, https://www.nsgm.gov.in/en/sm-stats-all.

[14] Energy Statistics India – 2023, Ministry of Statistics and Programme Implementation, https://www.mospi.gov.in/sites/default/files/publication_reports/Energy_Statistics_2023/EnergyStatisticsIndia2023.pdf.

[15] “Climate Action”, Website of United Nations Organisation, as accessed on July 15, 2023, https://www.un.org/en/climatechange/science/causes-effects-climate-change.  

[16] Synthesis Report of the Sixth Assessment Report, Intergovernmental Panel on Climate Change, March 2023, https://www.ipcc.ch/assessment-report/ar6/.

[17] “Cabinet approves India’s Updated Nationally Determined Contribution to be communicated to the United Nations Framework Convention on Climate Change”, Press Information Bureau, Union Cabinet, August 3, 2022, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1847812.

[18] Tracking Clean Energy Progress, International Energy Agency, July 2023, https://www.iea.org/reports/tracking-clean-energy-progress-2023.

[19] “India’s Stand at COP-26”, Press Information Bureau, Ministry of Environment, Forest, and Climate Change, February 3, 2022, https://pib.gov.in/PressReleasePage.aspx?PRID=1795071.

[20] National Electricity Plan, Generation Vol-I, Central Electricity Authority, May 2023, https://cea.nic.in/wp-content/uploads/irp/2023/05/NEP_2022_32_FINAL_GAZETTE-1.pdf.

[21] Global Energy and Climate Model, International Energy Agency, October 2022, https://www.iea.org/reports/global-energy-and-climate-model.

[22] All India Installed Capacity (in MW) of Power Stations as on December 31, 2022, Central Electricity Authority, https://cea.nic.in/wp-content/uploads/installed/2022/12/IC_Dec_2022.pdf.

[23] 17th Report: Action Plan for Achievement of 175 GW Renewable Energy Target, Standing Committee on Energy, 17th Lok Sabha, March 2021, https://sansad.in/getFile/lsscommittee/Energy/17_Energy_17.pdf?source=loksabhadocs.

[24] Hemi H. Gandhi, Bram Hoex, Brett Jason Hallam, Strategic investment risks threatening India's renewable energy ambition, Energy Strategy Reviews, Volume 43, 2022, 100921, ISSN 2211-467X, https://doi.org/10.1016/j.esr.2022.100921.

[25] “21st  Report: Financial Constraints in Renewable Energy Sector”; Standing Committee on Energy, January 2022, https://eparlib.nic.in/bitstream/123456789/835464/1/17_Energy_21.pdf.

[27] “India’s PV Manufacturing Capacity set to surge”, JMK Research, Institute for Energy Economics and Financial Analysis, April 2023, https://jmkresearch.com/wp-content/uploads/2023/04/Indias-Photovoltaic-Manufacturing-Capacity-Set-to-Surge-April-2023.pdf.

[28] Photovoltaic Manufacturing Outlook in India, Institute for Energy Economics and Financial Analysis, February 2022, https://ieefa.org/resources/photovoltaic-manufacturing-outlook-india.

[29] “Government allocates 39600 MW of domestic solar PV module manufacturing capacity under PLI (Tranche-II)”, Press Information Bureau, Ministry of Power, March 28, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1911380.

[30] “48 GW of domestic Solar Module manufacturing capacity to be added in next 3 years”, Press Information Bureau, Ministry of Power, March 28, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1911380.

[33] ‘Roof Top Solar Capacity installations growing at Compound annual growth rate of around 46%’, Ministry of New and Renewable Energy, Press Information Bureau, December 23, 2023, https://pib.gov.in/PressReleasePage.aspx?PRID=1989806

[34] “24th Report: Demands for Grants 2022-23 of Ministry of New and Renewable Energy”; Standing Committee on Energy, February 2022, https://loksabhadocs.nic.in/lsscommittee/Energy/17_Energy_24.pdf.

[35] Unstarred Question No. 159, Ministry of New and Renewable Energy, Lok Sabha, July 20, 2023, https://sansad.in/getFile/loksabhaquestions/annex/1712/AU159.pdf?source=pqals.

[36] ‘Progress and Implementation of PM Kusum Scheme’, Ministry of New and Renewable Energy, Press Information Bureau, December 23, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1989815

[37] Annual Report 2022-23, Ministry of New and Renewable Energy, https://mnre.gov.in/img/documents/uploads/file_s-1683099362708.pdf.

[38] No. 32/645/2017-SPV Division, Ministry of New and Renewable Energy, November 4, 2020, https://mnre.gov.in/img/documents/uploads/file_s-1604916676296.pdf.

[39] “PM-KUSUM - Grid-connected solar power plants of 89.45 MW capacity installed; 2.09 lakh agriculture pumps have been solarized; Reduction in carbon dioxide (CO2) emissions by 0.67 million tonnes and diesel consumption by 143 million litres of diesel per annum- Union Power & NRE Minister – Shri R. K. Singh”, Press Information Bureau, Ministry of New and Renewable Energy, March 16, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1907703.

[40] “24th Report: Demands for Grants 2022-23 of Ministry of New and Renewable Energy”; Standing Committee on Energy, March 2022, https://loksabhadocs.nic.in/lsscommittee/Energy/17_Energy_24.pdf.

[41] Integrating Variable Renewable Energy: Challenges and Solutions, National Renewable Energy Laboratory, September 2013, nrel.gov/docs/fy13osti/60451.pdf.

[42] Report on Optimal Generation Mix 2030 Version 2.0, Central Electricity Authority, April 2023, https://cea.nic.in/wp-content/uploads/irp/2023/05/Optimal_mix_report__2029_30_Version_2.0__For_Uploading.pdf.

[44] Electricity Storage and Renewables: Costs and markets to 2030, International Renewable Energy Agency, October 2017, https://www.irena.org/publications/2017/oct/electricity-storage-and-renewables-costs-and-markets.

[45] Global Energy and Climate Model, International Energy Agency, October 2022, https://www.iea.org/reports/global-energy-and-climate-model.

[46] “PLI ACC Scheme promotes manufacturing of technology agnostic Advanced Chemistry Cells in India”, Press Information Bureau, Ministry of Heavy Industries, April 23, 2024, https://pib.gov.in/PressReleasePage.aspx?PRID=2018576.

[47] “Cabinet approves the scheme titled Viability Gap Funding for Development of Battery Energy Storage Systems”, Press Information Bureau, Union Cabinet, September 6, 2023, https://pib.gov.in/PressReleasePage.aspx?PRID=1955112..

[48] “Power Sector at a glance All India”, Ministry of Power, (as accessed on June 5, 2023), https://powermin.gov.in/en/content/power-sector-glance-all-india

[49] Draft National Electricity Plan Vol. II – Transmission, Central Electricity Authority, https://cea.nic.in/wp-content/uploads/psp___a_i/2024/01/Draft_NEP_Vol_II.pdf.

[50] “Cabinet approves Green Energy Corridor (GEC) Phase-II – Inter-State Transmission System (ISTS) for 13 GW Renewable Energy Project in Ladakh”, Press Information Bureau, Cabinet Committee on Economic Affairs, October 18, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1968732.

[51] “Power Supply in Rural Areas”, Press Information Bureau, Ministry of Power, July 25, 2024, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=2037000.

[52] Executive Summary Report, April 2023, Central Electricity Authority, https://cea.nic.in/wp-content/uploads/executive/2023/04/Executive_Summary_Apr_2023-1.pdf.

[53] Unstarred Question No. 1964, Lok Sabha, Ministry of Power, answered on July 28, 2022, https://eparlib.nic.in/bitstream/123456789/1057162/1/AU1964.pdf.

[55] State Finances: A Study of Budgets of 2019-20, Reserve Bank of India, September 30, 2019, https://rbidocs.rbi.org.in/rdocs/Publications/PDFs/STATEFINANCE201920E15C4A9A916D4F4B8BF01608933FF0BB.PDF.

[56] Reports on the Performance of Power Utilities, Power Finance Corporation, https://pfcindia.com/ensite/Home/VS/29.

[57] Revamped Distribution Sector Scheme, Website of REC as accessed on November 20, 2022, https://recindia.nic.in/revamped-distribution-sector-scheme.

[58] White Paper on Tamil Nadu Government’s Finances, Finance Department, Government of Tamil Nadu, https://tnbudget.tn.gov.in/tnweb_files/white_paper_2021_english.pdf.

[59] Clause 14, Electricity (Amendment) Bill, 2022, as introduced in Lok Sabha, https://prsindia.org/files/bills_acts/bills_parliament/2022/Electricity%20(A)%20Bill,%202022.pdf.

[60] Turning Around the Power Distribution Sector, NITI Aayog, August 2021, https://www.niti.gov.in/sites/default/files/2021-08/Electricity-Distribution-Report_030821.pdf.

[61] Resource Adequacy Plan and Load Generation Balance Report, Central Electricity Authority, 2022-23, https://cea.nic.in/wp-

content/uploads/l_g_b_r_reports/2021/LGBR_2022_23.pdf.

[63] “Coal Import for blending at 6% till March 2024, to ensure uninterrupted power supply across the country: Power and New & Renewable Energy Minister R. K. Singh”, Press Information Bureau, Ministry of Power, December 6, 2023, https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1983084.

[64] Report No. 42, Standing Committee on coal, mines and steel (2022-2023), Ministry of Coal, 2023, https://eparlib.nic.in/bitstream/123456789/2504794/1/17_Coal_Mines_and_Steel_42.pdf

[66] “Energy-Water-Agriculture Nexus: Grow Solar, Save Water, Double the Farm Income“, Report on Workshop Organised by NITI Aayog and World Bank, December 2019, https://www.niti.gov.in/sites/default/files/2020-01/NITI-Aayog-%26-World-Bank-Energy-Water-Agriculture-Nexus.pdf.

[67] Starred Question No. 122, Rajya Sabha, Ministry of Power, August 1, 2023, https://powermin.gov.in/sites/default/files/uploads/RS0108.2023_Eng.pdf.

[68] S.O. 4617 (E), The Gazette of India, Ministry of Power, October 20, 2023, https://powermin.gov.in/sites/default/files/Notification_Regarding_Renewable_Purchase_Obligation_RPO.pdf.

[69] Section 42, The Electricity Act, 2003, https://cercind.gov.in/Act-with-amendment.pdf.

[70] Review of Status of Open Access in Distribution, Forum of Regulators, September 2019, http://www.forumofregulators.gov.in/Data/Reports/FOR%20Status%20of%20Open%20Access-13-01-2020.pdf.

[71] G.S.R. 418 (E), The Gazette of India, Ministry of New and Renewable Energy, June 3, 2022, https://egazette.nic.in/WriteReadData/2022/236345.pdf.

[72] 26th Report: Review of Power Tariff Policy, Standing Committee on Energy, August 2022, http://164.100.47.193/lsscommittee/Energy/17_Energy_26.pdf.

DISCLAIMER: This document is being furnished to you for your information.  You may choose to reproduce or redistribute this report for non-commercial purposes in part or in full to any other person with due acknowledgement of PRS Legislative Research (“PRS”).  The opinions expressed herein are entirely those of the author(s).  PRS makes every effort to use reliable and comprehensive information, but PRS does not represent that the contents of the report are accurate or complete.  PRS is an independent, not-for-profit group.  This document has been prepared without regard to the objectives or opinions of those who may receive it.