The general discussion on the Railway Budget concluded in Parliament this week. During the discussion, several MPs made a reference to two important documents tabled by the Railway Minister in 2009 - the ‘White Paper' on Indian Railways and the 2020 Vision document. The documents provide good insight into the operational and financial performance of Railways over the previous five years. They also throw light on the challenges that confront the Railways today. It emerges that Railways has relied heavily on increasing utilization of existing assets to manage the increase in demand. The system is otherwise severely constrained by lack of adequate capacity. Scenario so far (2004-09) Growth in traffic and earnings Rail transport demand is linked to the growth in GDP. As a result, the two main businesses of Railways – Passenger and Freight – have both seen significant increases in traffic in recent years. Passenger traffic has grown at an average rate of 10% each year. Earnings have increased at a slightly higher pace, implying that most passengers have been spared increases in fare. Standalone, passenger operations have continued to be loss making. Freight traffic has grown too, but at a lower rate of about 7% and unlike the passenger segment, freight fares have increased significantly over these years. Freight forms the backbone of Railways' revenues. Even today, it continues to account for almost two-thirds of total earnings. However, Railways’ market share in freight has decreased steadily over the past few decades - it dropped from 90% in 1950-51 to less than 30% in 2007-08. The main reasons for this decline are high pricing (to subsidize passenger travel) and lack of sufficient infrastructure. Railways are unable to provide time-tabled freight services. In addition, there are no multi-modal logistics parks that could have provided door-to-door cargo services. Infrastructure constraints Since 1950-51, route-kms have increased by just 18% and track-kms by 41%, even though freight and passenger output has gone up almost 12 times. Specific issues include:

  • Common corridor for both freight and passenger traffic - With freight trains on the same corridor, operating fast passenger trains becomes extremely difficult.
  • Concentration of traffic - More than half the total traffic moves on the golden quadrilateral and its diagonals; large parts of these sections are now already saturated.
  • Limited capacity for production of rolling stock, particularly locomotives and EMUs.

The above constraints require investment in network and capacity augmentation, including dedicated freight corridors. Hence, a substantial increase in funding is necessary. The Vision 2020 document planned to deploy Rs 14 lakh crore in the next 10 years towards development of rail infrastructure. Recent trends (as presented in the Budget 2011) This year's budget presented the actual financial performance in 2009-10, the provisional performance in 2010-11 and the targets for 2011-12 (Details can be accessed here). It also highlighted achievements on other metrics, including growth in traffic and augmentation of infrastructure (See 'Status of some key projects proposed in 2010-11'). On financials, 2009-10 was a bad year for Railways. Figures show a high Operating Ratio of 95.3%. Operating Ratio is a metric that compares operating expenses to revenues. A higher ratio indicates lower ability to generate surplus. The 2009-10 Operating Ratio is the highest since 2002. According to the Railways Minister, this can be partly attributed to higher payout in salaries and pension due to implementation of Sixth Pay Commission recommendations. Growth in passenger traffic remained high in 2010-11, at 11%. However, growth in freight traffic slowed down to 2%. Again, passenger fares remained untouched, but freight fares were increased. Railways, in 2011-12, targets an increase of 8% in both passenger and freight traffic. Financials are expected to improve. An amount of Rs. 57,630 crore has been budgeted as net plan outlay for investment in infrastructure. Last year, this figure was Rs 41,426 crore. In her opening remarks during the Budget speech in Parliament, the Minister commented that Railways forms an important backbone of any country. Lets hope it is headed in the right direction!

Recently, the central government launched the Pradhan Mantri Sahaj Bijli Har Ghar Yojana (or Saubhagya).[i],[ii]  The scheme seeks to ensure universal household electrification (in both rural and urban areas) by providing last mile connectivity.  The scheme is expected to cover three crore households.  Note that currently about four crore households are un-electrified.  A rural electrification scheme has also been under implementation since 2005.  In light of this, we discuss the current situation of, and key issues related to rural electrification in the country.

Regulatory and policy framework

Under the Electricity Act, 2003, the central and state governments have the joint responsibility of providing electricity to rural areas.  The 2003 Act also mandates that the central government should, in consultation with the state governments, provide for a national policy on (i) stand-alone power systems for rural areas (systems that are not connected to the electricity grid), and (ii) electrification and local distribution in rural areas.  Consequently, the Rural Electrification Policy was notified in August 2006.[iii]

The Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY), launched in 2005, was the first scheme on rural electrification.  In December 2014, Ministry of Power launched the Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY), which subsumed the RGGVY.[iv]  Components of DDUGJY include: (i) separation of agricultural and non-agricultural electricity feeders to improve supply for consumers in rural areas, (ii) improving sub-transmission and distribution infrastructure in rural areas, and (iii) rural electrification by carrying forward targets specified under the RGGVY.

The total financial outlay for DDUGJY over the implementation period (until 2021-22) is Rs 82,300 crore which includes budgetary support of Rs 68,900 crore.  The central government provides 60% of the project cost as grant, the state power distribution companies (discoms) raise 10% of the funds, and 30% is borrowed from financial institutions and banks.

Status of rural electrification

As of August 2017, about 1% of the villages in India remain un-electrified (3,146 villages).  However, with regard to households, around 23% (4.1 crore households) are yet to be electrified.  Table 1 at the end of this post shows the status of rural electrification across all states.

Issues with rural electrification

Definition of an electrified village

An electrified village is defined as one that has the following: (i) provision of basic infrastructure such as distribution transformers and lines in the inhabited locality, (ii) provision of electricity in public places like schools, panchayat office, health centers, dispensaries, and community centers, and (iii) at least 10% of the total number of households in the village are electrified.[iv]

Therefore, a village is considered to be electrified if 10% of the total number of households in the village have been electrified.  This is apart from the basic infrastructure and electrification of certain public centers in the village.  The Standing Committee on Energy (2013) had observed that according to this definition, a village would be called electrified even if up to 90% of households in it do not have an electricity connection.[v]  It also noted that the infrastructure being provided under the scheme is highly inadequate, unreliable and unsustainable.  The Committee recommended that the actual electrification requirement of villages must be assessed, and it should be ensured that the state discoms provide electricity to the remaining households in the village.

Supply of electricity

The Standing Committee had also noted that while the rural electrification scheme looks at creating infrastructure, the actual supply of electricity to households rests with the state discoms.[v]  These discoms are already facing huge financial losses and hence are unable to supply electricity to the villages.  Discoms continue to supply subsidised power to agricultural and residential consumers, resulting in revenue losses.  Further, the average technical and commercial losses (theft and pilferage of electricity) (AT&C losses) are at around 25%.  While the Ujjwal Discom Assurance Yojana (UDAY) has eased off some of the financial losses of the discoms, it remains to be seen whether discoms are able to reduce the cost-tariff gap and AT&C losses in the future.

It has been recommended that generation capacity should be augmented so that states can meet the additional demand under the rural electrification schemes. Further, the assistance to financially weaker states should be increased so that they can better implement the scheme.[v]

Electricity to below poverty line (BPL) households

Under the rural electrification scheme, the cost for providing free electricity connection per BPL household is Rs 3,000.  It has been observed that this cost per household may be inadequate.[v]  Due to the low cost, the quantity and the quality of work has been getting compromised leading to poor implementation of the scheme.  It has been recommended that the Ministry should revisit the cost provided under the scheme.[v]

The new electrification scheme: Pradhan Mantri Sahaj Bijli Har Ghar Yojana (or Saubhagya)

The new scheme, Saubhagya, seeks to ensure universal household electrification, that is, in both rural and urban areas.  Under Saubhagya, beneficiaries will be identified using the Socio Economic and Caste Census (SECC) 2011 data.  The identified poor households will get free electricity connections.  Other households not covered under the SECC, will be provided electricity connections at a cost of Rs 500.  This amount will be collected by the electricity distribution companies in 10 instalments.

The total outlay of the scheme will be Rs 16,320 crore, of which the central government will provide Rs 12,320 crore.  The outlay for the rural households will be Rs 14,025 crore, of which the centre will provide Rs 10,588 crore.  For urban households the outlay will be Rs 2,295 crore of which the centre will provide Rs. 1,733 crore.

The state discoms will execute the electrification works through contractors or other suitable agencies.  Information technology (mobile apps, web portals) will be used to organise camps in villages to identify beneficiaries.  In order to accelerate the process, applications for electricity connections will be completed on the spot.

So far the focus of electrification schemes has been on rural areas, where typically last mile connectivity has been difficult to provide.  Saubhagya extends the ambit of electrification projects to urban areas as well.  While DDUGJY has focused on the village as the principal unit to measure electrification, the new scheme shifts the targets to household electrification.  While the target for ensuring electricity connection in each household will be a significant step towards ensuring 24×7 power, the question of continuous and quality supply to these households will still rest on the ability of the discoms to provide electricity.  Further, while the scheme provides for free connections, the ability of these households to pay for the electricity they consume may be a concern.

Table 1: Status of rural electrification across states (as of August 2017)

Fig 1 edit

* all villages in Telangana were declared electrified before the bifurcation of the state.
Sources:  Ministry of Power; PRS.

 

[i] “PM launches Pradhan Mantri Sahaj Bijli Har Ghar Yojana “Saubhagya””, Press Information Bureau, Ministry of Power, September 25, 2017.

[ii] “FAQs on Pradhan Mantri Sahaj Bijli Har Ghar Yojana “Saubhagya””, Press Information Bureau, Ministry of Power, September 27, 2017.

[iii].  Rural Electrification Policy, Ministry of Power, August 23, 2006, http://powermin.nic.in/sites/default/files/uploads/RE%20Policy_1.pdf.

[iv].  “Office memorandum: Deendayal Upadhyaya Gram Jyoti Yojana”, Ministry of Power, December 3, 2014, http://powermin.nic.in/rural_electrification/pdf/Deendayal_Upadhyaya_Gram_Jyoti_Yojana.pdf.

[v].  “41st Report: Implementation of Rajiv Gandhi Grameen Vidyutikaran Yojana”, Standing Committee on Energy, December 13, 2013, http://164.100.47.134/lsscommittee/Energy/15_Energy_41.pdf.