Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
The general discussion on the Railway Budget concluded in Parliament this week. During the discussion, several MPs made a reference to two important documents tabled by the Railway Minister in 2009 - the ‘White Paper' on Indian Railways and the 2020 Vision document. The documents provide good insight into the operational and financial performance of Railways over the previous five years. They also throw light on the challenges that confront the Railways today. It emerges that Railways has relied heavily on increasing utilization of existing assets to manage the increase in demand. The system is otherwise severely constrained by lack of adequate capacity. Scenario so far (2004-09) Growth in traffic and earnings Rail transport demand is linked to the growth in GDP. As a result, the two main businesses of Railways – Passenger and Freight – have both seen significant increases in traffic in recent years. Passenger traffic has grown at an average rate of 10% each year. Earnings have increased at a slightly higher pace, implying that most passengers have been spared increases in fare. Standalone, passenger operations have continued to be loss making. Freight traffic has grown too, but at a lower rate of about 7% and unlike the passenger segment, freight fares have increased significantly over these years. Freight forms the backbone of Railways' revenues. Even today, it continues to account for almost two-thirds of total earnings. However, Railways’ market share in freight has decreased steadily over the past few decades - it dropped from 90% in 1950-51 to less than 30% in 2007-08. The main reasons for this decline are high pricing (to subsidize passenger travel) and lack of sufficient infrastructure. Railways are unable to provide time-tabled freight services. In addition, there are no multi-modal logistics parks that could have provided door-to-door cargo services. Infrastructure constraints Since 1950-51, route-kms have increased by just 18% and track-kms by 41%, even though freight and passenger output has gone up almost 12 times. Specific issues include:
The above constraints require investment in network and capacity augmentation, including dedicated freight corridors. Hence, a substantial increase in funding is necessary. The Vision 2020 document planned to deploy Rs 14 lakh crore in the next 10 years towards development of rail infrastructure. Recent trends (as presented in the Budget 2011) This year's budget presented the actual financial performance in 2009-10, the provisional performance in 2010-11 and the targets for 2011-12 (Details can be accessed here). It also highlighted achievements on other metrics, including growth in traffic and augmentation of infrastructure (See 'Status of some key projects proposed in 2010-11'). On financials, 2009-10 was a bad year for Railways. Figures show a high Operating Ratio of 95.3%. Operating Ratio is a metric that compares operating expenses to revenues. A higher ratio indicates lower ability to generate surplus. The 2009-10 Operating Ratio is the highest since 2002. According to the Railways Minister, this can be partly attributed to higher payout in salaries and pension due to implementation of Sixth Pay Commission recommendations. Growth in passenger traffic remained high in 2010-11, at 11%. However, growth in freight traffic slowed down to 2%. Again, passenger fares remained untouched, but freight fares were increased. Railways, in 2011-12, targets an increase of 8% in both passenger and freight traffic. Financials are expected to improve. An amount of Rs. 57,630 crore has been budgeted as net plan outlay for investment in infrastructure. Last year, this figure was Rs 41,426 crore. In her opening remarks during the Budget speech in Parliament, the Minister commented that Railways forms an important backbone of any country. Lets hope it is headed in the right direction!
On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary. It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019. The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management. In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.
Nation-wide sanitation programmes in past
According to the Census, the rural sanitation coverage in India was only 1% in 1981.
The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas. Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC). While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.
By 2001, only 22% of the rural families had access to toilets. It increased further to 32.7% by 2011. In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).
In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation. In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets. Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations. In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.
On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively. While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs. In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.
Swachh Bharat Mission – Gramin (SBM-Gramin)
The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live. Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).
Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation.
Sources: Union Budgets 2014-15 to 2021-22; PRS.
The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years. Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%. However, every year since 2018-19, there has been some under-utilisation of the allocated amount.
As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2). However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”. The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.
Figure 2: Toilet coverage for rural households
Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.
The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line. It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.
In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore. ODF Plus includes sustaining the ODF status, and solid and liquid waste management. Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.
Swachh Bharat Mission – Urban (SBM-Urban)
SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country. One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019. However, this target was then lowered to 59 lakh IHHLS by 2019. This target was achieved by 2020 (see Table 1).
Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)
Targets |
Original Target |
Revised Target |
Actual Constructed |
Individual Household Latrines |
66,42,000 |
58,99,637 |
62,60,606 |
Community and Public Toilets |
5,08,000 |
5,07,587 |
6,15,864 |
Sources: Swachh Bharat Mission Urban - Dashboard; PRS.
Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)
Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.
Sources: Union Budget 2014-15 to 2021-22; PRS.
The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance. Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene. Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme.
The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing. The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21. In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).
Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)
Targets |
Target |
Progress |
Progress |
Door to Door Waste Collection (Wards) |
86,284 |
81,535 (96%) |
83,435 (97%) |
Source Segregation (Wards) |
86,284 |
64,730 (75%) |
67,367 (78%) |
Waste Processing (in %) |
100% |
65% |
68% |
Sources: Standing Committee on Urban Development (2021); PRS.
In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched. Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites. On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.