Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.

On January 17, 2020, the Ministry of Health and Family Welfare acknowledged the emergence of COVID-19 that was spreading across China. On January 30, 2020, the country’s first COVID-19 positive case was reported in Kerala.  By March 11, 2020, the World Health Organisation declared COVID-19 as a global pandemic.  This blog summarises the key policy measures taken by government of Kerala to respond to the pandemic.  

As on April 22, Kerala has had 427 confirmed cases of COVID-19, of which 307 have recovered (highest rate of recovery in the country). Only three deaths have been recorded in the state so far.

 image

Pre-lockdown period: Early measures for containment

Following the first confirmed case involving a returnee from Wuhan, China, the initial responses by the state were aimed at surveilling, identifying, and conducting risk-based categorisation of all passenger arrivals from China and others who had come in close contact with these travellers. As two more cases were confirmed on February 2 and 3, the state government declared a health emergency in the state. 

Subsequently, a health advisory was issued to track, identify, and test all travellers with a travel history to Wuhan since January 15, 2020.  Such passengers and their close contacts were to be kept in isolation for 28 days.  The advisory also directed all lodging establishments to maintain a register of travellers with travel histories to corona-affected countries. A similar advisory was issued for student returnees as well. With no further confirmed cases being reported immediately, on February 12, the state withdrew the health emergency.  However, a high state of response and surveillance continued to be applied.

Second wave of infections

When a second wave of infections began spreading in early March, the government took several multi-pronged measures to address the threat. The following measures were taken in this regard:

  • Health measures: Revised guidelines for the clinical management of COVID19 patients, covering testing, quarantine, hospital admission, and discharge, were issued.  
     
  • Instructions were issued regarding airport safety protocols as well as testing of foreign nationals entering and exiting the state. All foreign arrivals, even if asymptomatic, were to be kept in isolation until their test reports were available. 
     
  • Further guidelines and precautions on social distancing and various hygiene norms, such as, use of sanitsers, were also issued to malls, shopping centres, and salons
     
  • Movement restrictions: All non-medical educational institutions, including anganwadis and madrassas were immediately shut down till March 31 and exams of classes 1-7 were postponed. Exams for classes 8 and above were to be held as scheduled. University exams were also postponed till March 31.
     
  • Government departments were asked to make temporary arrangements regarding working hours of their employees. Officials were also instructed to look into welfare measures for migrant workers.
     
  • Guidelines were also issued to private establishments regarding working time, safety measures, and leave for employees.
     
  • Administrative Measures: On March 17, COVID19 was declared a notified disaster, thus becoming eligible for funds from the State Disaster Response Fund (SDRF). SDRF is the primary fund available with state governments for responses to notified disasters. Notifying a disaster enables states to spend more from the SDRF to fight the said disaster.
     
  • In order to better coordinate the state’s response, the government issued instructions to constitute COVID-19 cells in all departments. Meetings and inspections by government officials were also to be avoided. 
     
  • Local Self Government institutions were assigned various roles and responsibilities. These include: (i) running awareness programs, such as, ‘Break the Chain’ initiative, (ii) conducting sanitation and cleanliness drives, (iii) regular outreach to home isolated/quarantined persons, (iv) activating committee system to manage responsibilities, (v) ensuring availability of essential commodities, (vi) categorising and ensuring available response mechanisms, such as, material resources, volunteers, medical resources etc, and (vii) ensuring special attention to vulnerable populations, such as senior citizens, and persons with co-morbidities or undergoing special treatments. 

The lockdown period

On March 23, Kerala announced a state-wide lockdown till March 31.  A day later, the central government announced a nation-wide 21-day lockdown.  

Restrictions imposed under the state’s order included: (i) stoppage of all forms of passenger transport services, (ii) prohibition of a gathering of more than five persons, and (iii) closure of all commercial establishments, officers, and factories, except those exempted.  Use of taxis, autos or private vehicles was permitted only for procurement of essential commodities or for medical emergencies. Establishments providing essential goods and services such as banks, media, telecom services, petrol bunks, and hospitals were permitted to operate.  

On April 15, the central government extended the lockdown till May 3.  Some of the key measures undertaken during the lockdown period are: 

Administrative Measures

  • A round-the-clock war room, comprising members of different departments, was set up to monitor and supervise all COVID-19 containment activities. 
     
  • Corona media cell was set up to monitor and tackle the threat of fake news surrounding COVID19.  
     
  • With the legislature not in session, the Kerala Epidemic Diseases Ordinance, 2020 was promulgated by the Governor of Kerala on March 26. The Ordinance empowers the state government to undertake necessary measures and specify regulations to counter the threat of an epidemic disease.  It also specifies a penalty for those who violate orders made under this Ordinance. 

Healthcare Measures

Essential Goods and Services

  • On March 25, the state declared a list of essential services under the Kerala Essential Services Maintenance Act, 1994. 
     
  • Various exemptions from lockdown were issued to services that were later deemed essential. These include: (i) shops and bakeries, including departmental stores, (ii) online food deliveries, (iii) parcel services, for delivery of essential goods, (iv) automobile service workshops, (v) shops and service centres for mobile phones, computers etc, only on Sundays, and (vi) plumbers and electricians to undertake maintenance work in houses and flats. 
     
  • On April 3, orders were issued to set up community kitchens under the aegis of Kudumbasree and Local Self Governments (LSGs). Kudumbasree is the poverty eradication and women empowerment programme implemented by the Kerala government. As on April 20, a total of 339 Community Kitchens have been functioning in 249 panchayats across 14 districts of the state. They have served a total of 5,91,687 meals since April 4, 2020. The government has also instructed LSGs to hire volunteers for the kitchen and pay them an honorarium of Rs. 400 (for one-time service) or Rs. 650 (for the whole-day).

Welfare Measures

  • Under SDRF norms, funds were released to the Health Department for relief and response activities for COVID-19. 
     
  • Each District Collector has been allocated Rs. 50 lakh for carrying out various COVID-19 outbreak-related control and prevention activities.
     
  • Financial assistance has been sanctioned to (i) fishermen, (ii) artists, (iii) lottery agents and sellers, and (iii) elephants and other such animals being looked after. 
     
  • A 2000-crore worth Chief Minister’s Helping Hand Loan Scheme was announced for people facing lockdown-related unemployment and hardships. The scheme will be operationalised through neighbourhood groups under the aegis of Kudumbasree. 

Post-lockdown strategies – Strategies easing lockdown relaxations

  • Expert Committee: On April 4, an Expert Committee was constituted by the government and on April 6, the Committee submitted its Report on the guidelines for post-lockdown regulations. It recommended a conditional, three-phase strategy, with districts being the unit of implementation. Relaxations would be progressively eased in each phase depending on criteria, such as, (i) number of new confirmed cases, (ii) percentage increase/decrease in number of persons under home surveillance, and (iii) no emergence of hotspots.. 
     
  • Containment Guidelines: After the lockdown was extended till May 3, the state released revised guidelines for containment, that recommended classification of districts into four zones, based on number of cases and disease threat. The zones – Red, Orange A, Orange B, and Green – would have different, graded restrictions, with Red having stringent restrictions in the form of a lockdown till May 3. The Orange A and B zones would have a lockdown till April 24 and 20 respectively, followed by a partial relaxation thereafter. Green zone would have a lockdown till April 20 and relaxation in restrictions thereafter.
     
  • Based on the above order, the state issued an advisory for industrial units to follow while resuming operations. Some of the Standard Operating Procedures to be followed include: (i) conducting disinfectation of premises, machinery, and vehicles, (ii) arranging exclusive transportation facilities with vehicles operating at 30-40% capacity, (iii) mandatory thermal scanning of people, (iv) following hygiene and social distancing norms, including a cap on elevator capacities and size of meetings (v) mandatory corona-related insurance cover for workers, (vi) mandatory use of CCTVs, and (vii) preparing a list of nearby COVID-19 hospitals .

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER).  During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed.  The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region.  In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.  

A new scheme named PM-DevINE announced to boost infrastructure and social development

In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22.  The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme.  A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.  

One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE).  It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region).  PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture.  The scheme will not replace or subsume existing central sector or centrally sponsored schemes.  The Scheme will be given an initial allocation of Rs 1,500 crore.

Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)

Major Heads

2020-21 Actuals

2021-22 BE

2021-22 RE

2022-23 BE

% change from 2021-22 RE to 2022-23 BE

North East Special Infrastructure Development Scheme

446

675

674

1,419

111%

Schemes of North East Council

567

585

585

702

20%

North East Road Sector Development Scheme

416

696

674

496

-26%

Central pool of resources for North East and Sikkim

342

581

581

-

-

Others

270

322

344

241

-30%

Total

1,854

2,658

2,658

2,800

5%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.

Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS. 

Allocation towards capital outlay less than demand

The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore).  Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges.  The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay.  It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.

Underutilisation of funds over the years

Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1).  For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure).  Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.

Figure 1: Underutilisation of funds by the Ministry since 2011-12

image
 Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
 Sources: Union Budget Documents (2011-12 to 2022-23); PRS
.

Delay in project completion

The Ministry implements several schemes for infrastructural projects such as roads and bridges.  The progress of the certain schemes has been inadequate.   The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project.  Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.

Need to address declining forest cover

The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover.  The Committee took note of the declining forest cover in the North East India.  As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km).  The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities.  The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline.  It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.

Key issues raised by Members during discussion in Rajya Sabha

The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022.  One of the issues highlighted by members was about the Ministry not having its own line Department.  This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects.  Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region.  The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.         

Allocation by Union Ministries to the North East 

Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation).  The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries.  In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region.  The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore).   In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.  

Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)

image   

Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.