Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified. Last date for submitting the applications is December 21, 2024.

On January 17, 2020, the Ministry of Health and Family Welfare acknowledged the emergence of COVID-19 that was spreading across China. On January 30, 2020, the country’s first COVID-19 positive case was reported in Kerala.  By March 11, 2020, the World Health Organisation declared COVID-19 as a global pandemic.  This blog summarises the key policy measures taken by government of Kerala to respond to the pandemic.  

As on April 22, Kerala has had 427 confirmed cases of COVID-19, of which 307 have recovered (highest rate of recovery in the country). Only three deaths have been recorded in the state so far.

 image

Pre-lockdown period: Early measures for containment

Following the first confirmed case involving a returnee from Wuhan, China, the initial responses by the state were aimed at surveilling, identifying, and conducting risk-based categorisation of all passenger arrivals from China and others who had come in close contact with these travellers. As two more cases were confirmed on February 2 and 3, the state government declared a health emergency in the state. 

Subsequently, a health advisory was issued to track, identify, and test all travellers with a travel history to Wuhan since January 15, 2020.  Such passengers and their close contacts were to be kept in isolation for 28 days.  The advisory also directed all lodging establishments to maintain a register of travellers with travel histories to corona-affected countries. A similar advisory was issued for student returnees as well. With no further confirmed cases being reported immediately, on February 12, the state withdrew the health emergency.  However, a high state of response and surveillance continued to be applied.

Second wave of infections

When a second wave of infections began spreading in early March, the government took several multi-pronged measures to address the threat. The following measures were taken in this regard:

  • Health measures: Revised guidelines for the clinical management of COVID19 patients, covering testing, quarantine, hospital admission, and discharge, were issued.  
     
  • Instructions were issued regarding airport safety protocols as well as testing of foreign nationals entering and exiting the state. All foreign arrivals, even if asymptomatic, were to be kept in isolation until their test reports were available. 
     
  • Further guidelines and precautions on social distancing and various hygiene norms, such as, use of sanitsers, were also issued to malls, shopping centres, and salons
     
  • Movement restrictions: All non-medical educational institutions, including anganwadis and madrassas were immediately shut down till March 31 and exams of classes 1-7 were postponed. Exams for classes 8 and above were to be held as scheduled. University exams were also postponed till March 31.
     
  • Government departments were asked to make temporary arrangements regarding working hours of their employees. Officials were also instructed to look into welfare measures for migrant workers.
     
  • Guidelines were also issued to private establishments regarding working time, safety measures, and leave for employees.
     
  • Administrative Measures: On March 17, COVID19 was declared a notified disaster, thus becoming eligible for funds from the State Disaster Response Fund (SDRF). SDRF is the primary fund available with state governments for responses to notified disasters. Notifying a disaster enables states to spend more from the SDRF to fight the said disaster.
     
  • In order to better coordinate the state’s response, the government issued instructions to constitute COVID-19 cells in all departments. Meetings and inspections by government officials were also to be avoided. 
     
  • Local Self Government institutions were assigned various roles and responsibilities. These include: (i) running awareness programs, such as, ‘Break the Chain’ initiative, (ii) conducting sanitation and cleanliness drives, (iii) regular outreach to home isolated/quarantined persons, (iv) activating committee system to manage responsibilities, (v) ensuring availability of essential commodities, (vi) categorising and ensuring available response mechanisms, such as, material resources, volunteers, medical resources etc, and (vii) ensuring special attention to vulnerable populations, such as senior citizens, and persons with co-morbidities or undergoing special treatments. 

The lockdown period

On March 23, Kerala announced a state-wide lockdown till March 31.  A day later, the central government announced a nation-wide 21-day lockdown.  

Restrictions imposed under the state’s order included: (i) stoppage of all forms of passenger transport services, (ii) prohibition of a gathering of more than five persons, and (iii) closure of all commercial establishments, officers, and factories, except those exempted.  Use of taxis, autos or private vehicles was permitted only for procurement of essential commodities or for medical emergencies. Establishments providing essential goods and services such as banks, media, telecom services, petrol bunks, and hospitals were permitted to operate.  

On April 15, the central government extended the lockdown till May 3.  Some of the key measures undertaken during the lockdown period are: 

Administrative Measures

  • A round-the-clock war room, comprising members of different departments, was set up to monitor and supervise all COVID-19 containment activities. 
     
  • Corona media cell was set up to monitor and tackle the threat of fake news surrounding COVID19.  
     
  • With the legislature not in session, the Kerala Epidemic Diseases Ordinance, 2020 was promulgated by the Governor of Kerala on March 26. The Ordinance empowers the state government to undertake necessary measures and specify regulations to counter the threat of an epidemic disease.  It also specifies a penalty for those who violate orders made under this Ordinance. 

Healthcare Measures

Essential Goods and Services

  • On March 25, the state declared a list of essential services under the Kerala Essential Services Maintenance Act, 1994. 
     
  • Various exemptions from lockdown were issued to services that were later deemed essential. These include: (i) shops and bakeries, including departmental stores, (ii) online food deliveries, (iii) parcel services, for delivery of essential goods, (iv) automobile service workshops, (v) shops and service centres for mobile phones, computers etc, only on Sundays, and (vi) plumbers and electricians to undertake maintenance work in houses and flats. 
     
  • On April 3, orders were issued to set up community kitchens under the aegis of Kudumbasree and Local Self Governments (LSGs). Kudumbasree is the poverty eradication and women empowerment programme implemented by the Kerala government. As on April 20, a total of 339 Community Kitchens have been functioning in 249 panchayats across 14 districts of the state. They have served a total of 5,91,687 meals since April 4, 2020. The government has also instructed LSGs to hire volunteers for the kitchen and pay them an honorarium of Rs. 400 (for one-time service) or Rs. 650 (for the whole-day).

Welfare Measures

  • Under SDRF norms, funds were released to the Health Department for relief and response activities for COVID-19. 
     
  • Each District Collector has been allocated Rs. 50 lakh for carrying out various COVID-19 outbreak-related control and prevention activities.
     
  • Financial assistance has been sanctioned to (i) fishermen, (ii) artists, (iii) lottery agents and sellers, and (iii) elephants and other such animals being looked after. 
     
  • A 2000-crore worth Chief Minister’s Helping Hand Loan Scheme was announced for people facing lockdown-related unemployment and hardships. The scheme will be operationalised through neighbourhood groups under the aegis of Kudumbasree. 

Post-lockdown strategies – Strategies easing lockdown relaxations

  • Expert Committee: On April 4, an Expert Committee was constituted by the government and on April 6, the Committee submitted its Report on the guidelines for post-lockdown regulations. It recommended a conditional, three-phase strategy, with districts being the unit of implementation. Relaxations would be progressively eased in each phase depending on criteria, such as, (i) number of new confirmed cases, (ii) percentage increase/decrease in number of persons under home surveillance, and (iii) no emergence of hotspots.. 
     
  • Containment Guidelines: After the lockdown was extended till May 3, the state released revised guidelines for containment, that recommended classification of districts into four zones, based on number of cases and disease threat. The zones – Red, Orange A, Orange B, and Green – would have different, graded restrictions, with Red having stringent restrictions in the form of a lockdown till May 3. The Orange A and B zones would have a lockdown till April 24 and 20 respectively, followed by a partial relaxation thereafter. Green zone would have a lockdown till April 20 and relaxation in restrictions thereafter.
     
  • Based on the above order, the state issued an advisory for industrial units to follow while resuming operations. Some of the Standard Operating Procedures to be followed include: (i) conducting disinfectation of premises, machinery, and vehicles, (ii) arranging exclusive transportation facilities with vehicles operating at 30-40% capacity, (iii) mandatory thermal scanning of people, (iv) following hygiene and social distancing norms, including a cap on elevator capacities and size of meetings (v) mandatory corona-related insurance cover for workers, (vi) mandatory use of CCTVs, and (vii) preparing a list of nearby COVID-19 hospitals .

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

On March 10, Lok Sabha passed a Bill to amend the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.  The Bill is now pending in Rajya Sabha.  This blog briefly outlines the context and the major legislative changes to the land acquisition law. I. Context Land acquisition, unlike the purchase of land, is the forcible take-over of privately owned land by the government.  Land is acquired for projects which serve a ‘public purpose’.  These include government projects, public-private partnership projects, and private projects.  Currently, what qualifies as ‘public purpose’ has been defined to include defence projects, infrastructure projects, and projects related to housing for the poor, among others. Till 2014, the Land Acquisition Act, 1894 regulated the process of land acquisition.  While the 1894 Act provided compensation to land owners, it did not provide for rehabilitation and resettlement (R&R) to displaced families.  These were some of the reasons provided by the government to justify the need for a new legislation to regulate the process of land acquisition.  Additionally, the Supreme Court had also pointed out issues with determination of fair compensation, and what constitutes public purpose, etc., in the 1894 Act.  To this end, the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 was passed by Parliament, in 2013. II. Current legislative framework for land acquisition The 2013 Act brought in several changes to the process of land acquisition in the country.   Firstly, it increased the compensation provided to land owners, from 1.3 times the price of land to 2 times the price of land in urban areas, and 2-4 times the price of land in rural areas.  Secondly, unlike the earlier Act which did not provide rehabilitation and resettlement, the 2013 Act provided R&R to land owners as well as those families which did not own land, but were dependent on the land for their livelihood.  The Act permits states to provide higher compensation and R&R. Thirdly, unlike the previous Act, it mandated that a Social Impact Assessment be conducted for all projects, except those for which land was required urgently.  An SIA assesses certain aspects of the acquisition such as whether the project serves a public purpose, whether the minimum area that is required is being acquired, and the social impact of the acquisition.  Fourthly, it also mandated that the consent of 80% of land owners be obtained for private projects, and the consent of 70% of land owners be obtained for public-private partnership projects.  However, consent of land owners is not required for government projects.   The 2013 Act also made certain other changes to the process of land acquisition, including prohibiting the acquisition of irrigated multi-cropped land, except in certain cases where the limit may be specified by the government. III. Promulgation of an Ordinance to amend the 2013 Act In addition to the 2013 Act, there are certain other laws which govern land acquisition in particular sectors, such as the National Highways Act, 1956 and the Railways Act, 1989.  The 2013 Act required that the compensation and R&R provisions of 13 such laws be brought in consonance with it, within a year of its enactment, (that is, by January 1, 2015) through a notification.  Since this was not done by the required date, the government issued an Ordinance (as Parliament was not in session) to extend the compensation and R&R provisions of the 2013 Act to these 13 laws.  However, the Ordinance also made other changes to the 2013 Act. The Ordinance was promulgated on December 31, 2014 and will lapse on April 5, 2015 if not passed as a law by Parliament.  Thus, the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Amendment) Bill, 2015 has been introduced in Parliament to replace the Ordinance.  The Bill has been passed by Lok Sabha, with certain changes, and is pending in Rajya Sabha.  The next section outlines the major changes the Bill (as passed by Lok Sabha) proposes to make to 2013 Act. IV. Changes proposed by the 2015 Bill to the 2013 Act Some of the major changes proposed by the 2015 Bill (as passed by Lok Sabha) relate to provisions such as obtaining the consent of land owners; conducting an SIA; return of unutilised land; inclusion of private entities; and commission of offences by the government. Certain exemptions for five categories of projects: As mentioned above, the 2013 Act requires that the consent of 80% of land owners is obtained when land is acquired for private projects, and the consent of 70% of land owners is obtained when land is acquired for public-private partnership projects.  The Bill exempts five categories of projects from this provision of the 2013 Act.  These five categories are: (i) defence, (ii) rural infrastructure, (iii) affordable housing, (iv) industrial corridors (set up by the government/government undertakings, up to 1 km on either side of the road/railway), and (v) infrastructure projects. The Bill also allows the government to exempt these five categories of projects from: (i) the requirement of a Social Impact Assessment, and (ii) the limits that apply for acquisition of irrigated multi-cropped land, through issuing a notification.  Before issuing this notification, the government must ensure that the extent of land being acquired is in keeping with the minimum land required for such a project. The government has stated that these exemptions are being made in order to expedite the process of land acquisition in these specific areas.  However, the opponents of the Bill have pointed out that these five exempted categories could cover a majority of projects for which land can be acquired, and consent and SIA will not apply for these projects. Return of unutilised land: Secondly, the Bill changes the time period after which unutilised, acquired land must be returned.  The 2013 Act states that if land acquired under it remains unutilised for five years, it must be returned to the original owners or the land bank.  The Bill changes this to state that the period after which unutilised land will need to be returned will be the later of: (i) five years, or (ii) any period specified at the time of setting up the project. Acquisition of land for private entities: Under the 2013 Act, as mentioned above, land can be acquired for the government, a public-private partnership, or a private company, if the acquisition serves a public purpose.  The third major change the Bill seeks to make is that it changes the term ‘private company’ to ‘private entity’.  This implies that land may now be acquired for a proprietorship, partnership, corporation, non-profit organisation, or other entity, in addition to a private company, if the project serves a public purpose. Offences by the government: Fourthly, under the 2013 Act, if an offence is committed by a government department, the head of the department will be held guilty unless he can show that he had exercised due diligence to prevent the commission of the offence.  The Bill removes this section.  It adds a provision to state that if an offence is committed by a government employee, he can be prosecuted only with the prior sanction of the government. Acquisition of land for private hospitals and educational institutions: While the 2013 Act excluded acquisition of land for private hospitals and private educational institutions, the Bill sought to include these two within its scope.  However, the Lok Sabha removed this provision of the Bill.  Thus, in its present form, the Bill does not include the acquisition of land for private hospitals and private educational institutions. Other changes proposed in Lok Sabha: In addition to removing social infrastructure from one of the five exempted categories of projects, clarifying the definition of industrial corridors, and removing the provision related to acquisition for private hospitals and private educational institutions, the Lok Sabha made a few other changes to the Bill, prior to passing it.  These include: (i) employment must be provided to ‘one member of an affected family of farm labour’ as a part of the R&R award, in addition to the current provision which specifies that one member of an affected family must be provided employment as a part of R&R; (ii) hearings of the Land Acquisition, Rehabilitation and Resettlement Authority to address grievances related to compensation be held in the district where land is being acquired; and (iii) a survey of wasteland must be conducted and records of these land must be maintained. For more details on the 2015 Bill, see the PRS Bill page, here. A version of this blog appeared on rediff.com on February 27, 2015.