There has been no resolution so far to the issue of assured fuel supply from Coal India Limited (CIL) to power producers.  According to reports, while CIL released a model supply agreement in April 2012, so far only around 13 Fuel Supply Agreements (FSAs) have been signed.  Originally around 50 power units were expected to sign FSAs with CIL.  Power producers have objected to the model FSA released by CIL, particularly its force majeure provisions and the dilution of financial penalties in case of lower than contracted supply. Background The adverse power supply situation has attracted greater attention in the past few months.  According to Central Electricity Authority's data, the gap between peak demand and peak supply of power in March 2012 was 11 per cent.  The decreasing availability of fuel has emerged as a critical component of the worsening power supply situation.  As of March 31, 2012, there were 32 critical thermal power stations that had a coal stock of less than 7 days.  The gap between demand and supply of coal in the past three years is highlighted below: Table 1: Coal demand/Supply gap (In millions of tonnes)

 

2009-10

2010-11

2011-12

Demand

604

656

696

Supply

514

523

535

Gap

90

133

161

Source: PIB News Release dated May 7, 2012 Coal accounts for around 56 per cent of total installed power generation capacity in India.  Increased capacity in thermal power has also accounted for almost 81 per cent of the additional 62,374 MW added during the 11th Plan period.  Given the importance of coal in meeting national energy needs, the inability of CIL to meet its supply targets has become a major issue.  While the production target for CIL was 486 MT for 2011-12, its actual coal production was 436 MT. Fuel Supply Agreements In March 2012, the government asked CIL to sign FSAs with power plants that have been or would be commissioned by March 31, 2015.  These power plants should also have entered into long term Power Purchase Agreements with distribution companies.  After CIL did not sign FSAs by the deadline of March 31, 2012 the government issued a Presidential Directive to CIL on April 4, 2012 directing it to sign the FSAs.  The CIL board approved a model FSA in April 2012, which has not found acceptance by power producers. According to newspaper reports, many power producers have expressed their dissatisfaction with the model FSA released by CIL.  They have argued that it differs from the 2009 version of FSAs in some major ways.  These include:

  • The penalty for supplying coal below 80 per cent of the contracted amount has been reduced from 10 per cent to 0.01 per cent.  The penalty will be applicable only after three years.
  • The new FSA has extensive force majeure provisions that absolve CIL of non-supply in case of multiple contingencies – including equipment breakdown, power cuts, obstruction in transport, riots, failure to import coal due to “global shortage or delays… or no response to enquiries (by CIL) for supply of coal.”
  • CIL would have the discretion to annually review the supply level that would trigger a financial penalty.  There was no provision for such a review in the earlier FSA.

Most power producers, including NTPC, the country’s biggest power producer, have refused to sign the new FSA.  Reports suggest that the Power Minister has asked the Prime Minister’s Office to mandate CIL to sign FSAs within a month based on the 2009 format.  CIL has received a request from NTPC to consider signing FSAs based on the same parameters as their existing plants, but with the revised trigger point of 80 per cent (down from 90 per cent earlier). Underlying this situation is CIL’s own stagnating production.  Various experts have pointed to the prohibition on private sector participation in coal mining (apart from captive projects) and the backlog in granting environment and forest clearances as having exacerbated the coal supply situation.

In recent public discourse over lobbying, two issues that have underscored the debate are:

  1. Greater transparency in the policymaking process, and
  2. Equality of access for all stakeholders in engaging with the process.

There is a need to build linkages between citizens and the policy making process, especially by strengthening scrutiny before a Bill is introduced in Parliament. Currently, there is no process established to ensure pre-legislative scrutiny by the citizenry. Other democracies incorporate several measures to enhance public engagement in the pre-legislative process. These include:

  • Making all Bills available in the public domain for a stipulated period before introducing them in the legislature. This includes, publishing these Bills in forms (language, medium etc) that are accessible to the general public.
  • Making a report or Green paper on the legislative priorities addressed by the Bill available for citizens.
  • Forming adhoc committees to scrutinise the Bill before it is piloted in the House.
  • Having Standing Committees examine the Bill before introducing it in the House.
  • Providing a financial memorandum for each Bill, which specifies the budgetary allocation for the process/bodies created by the Bill.
  • Creating online fora for discussion. For the sections of the stakeholders who have limited access to the internet, efforts are made to proactively consult them through other media.
  • Expanding the purview of citizens’ right to petition their representatives with legislative proposals.

There are several instances, in the last few years itself, wherein civil society groups have played an active role in the development of pre-legislative scrutiny in India.

  • Public consultation with cross-section of stakeholders when drafting a Bill: The Right to Information Act is seen as a landmark legislation when highlighting the role of civil society actors in the drafting of a Bill.  It also serves as a prime example for how it the movement mobilised widespread public opinion for the Bill, bringing together different sections of the citizenry.
  • Public feedback on draft Bills: In several cases, after a Bill has been drafted the concerned ministry or public body publishes the Bill, inviting public comments. The Right to Education Bill, the National Identification Authority Bill and the Draft Direct Taxes Code Bill 2009 are recent cases in point. These announcements are made through advertisements published in newspapers and other media. For instance, the government has recently proposed to amend the rules of the RTI and has invited public feedback on the rules by December 27.
  • Engaging with legislators: It is important to expand engagement with lawmakers after the Bill has been introduced in Parliament, as they will determine what the law will finally contain.  This is done by approaching individual legislators or members of the committee which is likely to examine the legislation. Standing Committees invite feedback on the Bill through newspaper advertisements.  For instance, the Standing Committee examining the Civil Nuclear Liability Bill heard testimonies from journalists, civil society groups, thinktanks, public bodies and government departments.

The role of the media and channelising the potential of the internet are other key approaches that need to be explored. Other examples and channels of engagement with the legislative process are illustrated in the PRS Primer on Engaging with Policymakers