On January 17, 2020, the Ministry of Health and Family Welfare acknowledged the emergence of COVID-19 pandemic that was spreading across China.  Tamil Nadu reported its first confirmed case of COVID-19 on March 7, 2020.   As of April 28, the state has 1,937 confirmed cases of COVID-19 (seventh highest in the country).  Of these, 1,101 have recovered (third highest rate of recovery in the country among states with 100 or more cases) and 24 have died.  The state government has taken several actions to contain the spread and impact of COVID-19.  In this blog, we look at the key measures taken by the Tamil Nadu government between January 19 and April 28, 2020. 

 image

Initial phase

The Tamil Nadu government came out with a series of responses between January 19 and February 1.  These included: (i) readying Rapid Response Teams (RRTs) at state and district levels, (ii) setting up of a 24/7 control room, (iii) thermal scanning of air travellers from China, (iv) creating isolation wards in the General Hospitals of four major cities, and (v) running appropriate awareness campaigns. 

Some of the other early measures are summarised below:

Health measures

  • On March 13, the Governor declared COVID-19 to be a notified disease in the state of Tamil Nadu, under the Tamil Nadu Public Health Act, 1939.  Notifying a disease allows for incidences of the disease to be mandatorily reported to the government and in turn, helps authorities to respond with appropriate measures to prevent the spread of the disease. 

  • On March 15, the government prescribed the Tamil Nadu COVID-19 Regulations, 2020.  These regulations detail the responsibilities of hospitals and individuals, and the powers of officials in relation to the diagnosis, treatment, and containment of COVID-19. These include (i) creation of isolation wards in hospitals, (ii) containment measures in an area once positive cases are detected, and (iii) mandatory 14-day home isolation for asymptomatic air travellers from COVID-19 affected countries.

  • On March 15, the government also mandated a 14-day institutional isolation for all air travellers to prevent import of infections from other states.  The state also initiated setting up of testing camps and conducting disinfectation drives in the border districts. 

Travel and Movement

  • On March 15, the government notified a series of instructions that restricted the movement of people in the state.  These include (i) shutting down of establishments, such as, educational institutions (up to Class 5), theatres, malls etc, and (ii) banning of inter-state travel for 15 days. 

  • On March 16, the government announced additional restrictions till Mar 31, such as, closure of: (i) anganwadis and making alternate provision of dry ration for children at their homes, (ii) swimming pools, amusement parks, gyms, zoos, museums, bars, clubs etc, and (iii) all educational institutions, except the conduct of practical exams for class 10 and 12, and various entrance exams.  

  • State borders were sealed off for road traffic, except for movement of essential commodities, from March 20 to March 31.  Public transportation services, such as metro rail and inter-state private buses, were also suspended till March 31. 

  • The Prime Minister asked the country to observe a Janta Curfew from 7 am to 9 pm on March 22,. The state government further extended this curfew to 5 am on March 23.  Following this, the government immediately announced a state-wide lockdown from March 24 up to April 1. 

  • On April 5, the government issued an advisory for the quarantine of migrant workers and the conduct of health camps for them. 

Welfare Measures

  • On March 15, the government announced financial assistance of a total of Rs 60 crore to various departments, such as, health, transport etc, to take precautionary measures to combat COVID-19.

  • On March 24, the government announced the distribution of cash support of Rs 1,000 to all entitled family cardholders.  Further, they were also eligible for free supply of essential commodities such as rice, dal, sugar, etc, during the month of April, through the Public Distribution System (PDS). 

During the lockdown

A state-wide lockdown was announced from March 24 to April 1, followed by a nation-wide lockdown between March 25 and April 14.  On April 13, the state-wide lockdown was extended up to April 30. This was followed by the extension of the nation-wide lockdown from April 15 to May 3. Under this, certain activities could be resumed after April 20. 

Some of the key measures undertaken during the lockdown period are: 

Travel and movement

  • Amidst the lockdown, on March 25, the government notified that establishments providing essential goods and services, which were allowed to operate.  These included establishments such as  (i) police forces, (ii) treasury, (iii) public utilities, (iv) banks, (v) media, (vi) telecommunications, and (vii) shops dealing with food, groceries etc.  Further, on March 28, the government permitted a few agriculture-related establishments to operate, such as, Mandis, fertiliser shops, and agencies involved in procurement of agriculture products. 

  • An Expert Committee formed by the state government to formulate guidelines for phased exit from lockdown after April 20, recommended the extension of the lockdown till May 3.  Certain select activities were, however, permitted to resume operations from April 20 onwards. These include (i) MNREGA works related to irrigation and water conservation, (ii) rural construction projects on irrigation, dam safety, hospital buildings, roads and bridges, and (iii) state and central government offices at one-third capacity.  

  • In view of rising number of cases, on April 24, stringent curfew orders were passed in the districts of (i) Chengalpattu, (ii) Kancheepuram, and (iii) Thiruvallur. The curfew will be imposed between April 26 and April 29, from 6 am to 9 pm, and with more stringent restrictions than under the ongoing nation-wide lockdown, such as, (i) petrol bunks to operate only between 8 am and 12 noon, and (ii) supermarkets and shops to remain shut. 

  • Curfew orders were passed in 5 more districts.  In Chennai, Coimbatore and Madurai, curfew is imposed between 6 am and 9 pm from April 26 to April 29.  In Salem and Tiruppur, curfew was imposed from April 26 to April 28. 

Welfare Measures

  • On March 30,   the government announced a cash assistance of Rs 1,500 per month to be credited into the bank accounts of differently-abled persons.  It also announced that transgenders without ration cards, were eligible to receive 12kg of rice, 1kg of dal, and 1 litre of cooking oil, from fair price shops (FPS).

  • On April 2, the government announced a concession package to manufacturers of COVID-19 related medical equipment, who will commence production before July 31, 2020. The package applied to both MSMEs and large manufacturers of equipment, such as, ventilators, Personal Protection Equipment (PPE) kits and medicines.  Some of the concessions include: (i) 30% capital subsidy, upto Rs 20 crore, (ii) 100% stamp duty waiver, (iii) 6% interest subvention for capital loans for two quarters, (iv) commencement of manufacturing without prior approval, and (v) provision of necessary land on priority basis for short-term/long-term leases, etc. 

  • Rs 50 lakh grant was announced to the families of frontline workers in the event of their unfortunate demise.  If infected by COVID-19, they are eligible for Rs 2 lakh assistance towards treatment costs.  In certain cases, if eligible, their kin would also receive a government job offer. 

  • On April 7, the government announced that MLALAD funds could be utilised for COVID-19 prevention and containment activities. A total of Rs 1.25 crore can be utilised towards prevention, containment, treatment, and purchase of medical equipment, PPEs etc.

Health Measures

  • On April 2, the government released a list of designated COVID-19 hospitals in the state. Instructions were issued to refer all COVID-19 positive cases exclusively to these designated hospitals. However, willing citizens were also permitted to approach private hospitals, at their own cost. Private hospitals were further instructed to establish dedicated fever clinics to cope with the increasing load of flu and fever cases.

  • Amidst a rise in the number of cases, on April 4, the government issued instructions to: (i) avoid all kinds of religious gatherings, (ii) hospitals to not show religious bias in treating patients, and (iii) doctors to coordinate with the government and check in on the mental health of quarantined patients via video conferencing facilities such as Skype.

  • On April 5, the government issued cluster containment measures to stop the transmission, morbidity, and mortality associated with the further spread of COVID-19. This was in response to the large number of imported infections from the attendees of the Nizamuddin conference in Delhi. 

  • Resource Management: On March 27, the Chief Minister announced an additional COVID-19 related recruitment of doctors and lab technicians. The recruited members were to join within three days of the notification. On April 25, an additional 1,323 nurses were also recruited.

  • A two-month extension was announced to the tenures of medical professionals retiring on March 31 and April 30.

  • The government also instructed District Authorities to ensure the protection of doctors and other hospital staff who are being forcefully evicted from their houses by landlords. As a measure to develop immunity against COVID-19, the government, on April 25, also recommended providing Zinc and Vitamin tablets, and herbal powder to all personnel on frontline duty in containment areas. 

Other Measures

  • Administrative: Eleven committees have been formed to coordinate implementation of various welfare programmes. In all districts, Crisis Management Committees have been formed under the district collector. 

  • Education: The conduct of semester examinations in universities and colleges is postponed to the beginning of the next academic year, as and when the institutions reopen. Private colleges and schools were also instructed to not compel students/parents to pay pending dues for 2019-20 or advance fees for 2020-21. 

  • Industry: On April 22, the government released a list of industries classified as continuous process industries. These are companies where the production lines are functioning 24/7. The list includes (i) refineries, (ii) large steel plants, (iii) large cement plants, (iv) sugar mills, (v) large paper mills, (vi) tyre manufacturers etc. 

  • Technology: The government launched a Whatsapp Chat Bot for providing latest information and guidance related to COVID-19 in both Tamil & English.

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.