The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19.  During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20.  In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector. 

Power supply saw a decrease of 25% during the lockdown (year-on-year)

As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand.  The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year).  In comparison, the power supply saw a decrease of 3% between March 1 and March 24.  During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).

Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)

Sources: Daily Reports; POSOCO; PRS.

If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes.  As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.

Figure 2: Power consumption by consumer segment in 2018-19

Sources: Central Electricity Authority; PRS.

Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity.  On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.

A nominal increase in energy and peak deficit levels

As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level.  Energy deficit indicates the shortfall in energy supply against the demand during the day.  The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24.  Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.

Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)

Sources: Daily Reports; POSOCO; PRS.

Coal stock with power plants increases

Coal is the primary source of power generation in the country (~71% in March 2020).  During the lockdown period, the coal stock with coal power plants has seen an increase.  As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.

Energy mix changes during the lockdown, power generation from coal impacted

During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%).  As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.

Table 1: Energy Mix during March 1-April 19, 2020

Sources: Daily Reports; POSOCO; PRS.

This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.

This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources.  This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector.  Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle.  Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.

Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)

Sources: Daily Reports; POSOCO; PRS.

Finances of the power sector to be severely impacted

Power distribution companies (discoms) buy power from generation companies and supply it to consumers.  In India, most of the discoms are state-owned utilities.  One of the key concerns in the Indian power sector has been the poor financial health of its discoms.  The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17).  However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses.  Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.

Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector.  Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).

Following are some of the factors which have impacted the financial situation during the lockdown:

  • Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate.  Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.

  • The lockdown has led to a halt on commercial and industrial activities while people are staying indoors.  This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased.  Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms.  States may choose to bridge this gap by providing a higher subsidy.

  • Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as RajasthanUttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.

  • Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.

  • Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.

  • The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21).  As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.

Capacity addition may be adversely impacted

As per the National Electricity Plan,  India’s total capacity addition target is around 176 GW for 2017-2022.  This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).  

India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020).  In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.

Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:

  • construction activities were stopped during the lockdown and will take some time to return to normal,

  • disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and

  • reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.

Key reforms likely to be delayed

Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:

  • The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.

  • UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown. 

  • Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.

For a detailed analysis of the Indian Power Sector, please see here.  For details on the number of daily COVID-19 cases in the country and across states, please see here.  For details on the major COVID-19 related notifications released by the centre and the states, please see here.  

Last week, the Assam Legislative Assembly passed the Assam Cattle Preservation Bill, 2021.  The Bill seeks to regulate the slaughter and transportation of cattle and the sale of beef.   It replaces the Assam Cattle Preservation Act, 1950, which only provided for restrictions on cattle slaughter.  In this post, we examine the Bill and compare it with other state laws on cattle preservation.  For a detailed analysis of the Bill, see here.

Cattle preservation under the Bill

The Bill prohibits the slaughter of cows of all ages.  Bulls and bullocks, on the other hand, may be slaughtered if they are: (i) over 14 years of age, or (ii) permanently incapacitated due to accidental injury or deformity.  Inter-state and intra-state transport of cattle is allowed only for agricultural or animal husbandry purposes.  This requires a permit from the competent authority (to be appointed by the state government).  Further, the Bill allows the sale of beef and beef products only at certain locations as permitted by the competent authority.  No permission for such sale will be granted in areas that are predominantly inhabited by Hindu, Jain, Sikh and other non-beef eating communities, or within a five-kilometre radius of a temple or other Hindu religious institution.

Provisions of the Bill may raise certain issues which we discuss below. 

Undue restriction on cattle transport in the north-eastern region of India

The Bill prohibits the transport of cattle from one state to another (or another country) through Assam, except with a permit that such transport is for agricultural or animal husbandry purposes.  This may lead to difficulties in movement of cattle to the entire north-eastern region of India.  First, the unique geographical location of Assam makes it an unavoidable transit state when moving goods to other north-eastern states.  Second, it is unclear why Assam may disallow transit through it for any purposes other than agriculture or animal husbandry that are allowed in the origin and destination states.  Note that the Madhya Pradesh Govansh Vadh Pratishedh Adhiniyam, 2004 provides for a separate permit called a transit permit for transporting cattle through the state.  Such permit is for the act of transport, without any conditions as to the purpose of transport.

Unrestricted outward transport of cattle to states that regulate slaughter differently from Assam

The Bill restricts the transport of cattle from Assam to any place outside Assam “where slaughter of cattle is not regulated by law”.  This implies that cattle may be transported without any restrictions to places outside Assam where cattle slaughter is regulated by law.  It is unclear whether this seeks to cover any kind of regulation of cattle slaughter, or only regulation that is similar to the regulation under this Bill.  The rationale for restricting inter-state transport may be to pre-empt the possibility of cattle protected under the Bill being taken to other states for slaughter.  If that is the intention, it is not clear why the Bill exempts states with any regulation for cattle slaughter from transport restrictions.  Other states may not have similar restrictions on cattle slaughter as in the Bill.  Note that other states such as Karnataka and Chhattisgarh restrict outgoing cattle transport without making any distinction between states that regulate cattle slaughter and those that do not.

Effective prohibition on sale of beef in Assam 

The Bill prohibits the sale of beef within a five-kilometre radius of a temple (which means an area of about 78.5 square kilometres around a temple).  This threshold may be overly restrictive.  As per the 2011 census, the average town area in Assam is 5.89 square kilometres (sq km) and the average village area is 1.93 sq km.  The three largest towns of Assam by area are: (i) Guwahati (219.1 sq km), (ii) Jorhat (53.5 sq km), and (iii) Dibrugarh (20.8 sq km).  Hence, even if there is only one temple in the middle of a town, no town in Assam – except Guwahati – can have a beef shop within the town area.  Similarly, if a village has even one temple, a beef shop cannot be set up in a large area encompassing several adjoining villages as well.  In this manner, the Bill may end up completely prohibiting sale of beef in the entire state, instead of restricting it to certain places.

Note that certain states such as GujaratRajasthanUttar Pradesh and Haryana completely prohibit the sale or purchase of beef within the state.  However, they also completely prohibit the slaughter of cows, bulls and bullocks.  This is not the case under the Bill, which only places a complete prohibition on slaughter of cows.  Further, in places such as Delhi, municipal regulations prohibit the sale of meat (including beef) within 150 metres from a temple or other religious place.  This minimum distance requirement does not apply at the time of renewal of license for selling meat if the religious place comes into existence after the grant of such license. 

The prohibition on sale of beef in areas predominantly inhabited by communities identified based on religion or food habits (non-beef eating) may also have an unintended consequence.  With the food typically consumed by a community becoming unavailable or available only in select locations, it may lead to the segregation of different communities into demarcated residential areas.  As per the 2011 census, the population of Assam comprises roughly 61% Hindus, 34% Muslims, and 4% Christians.

Onerous requirement for the accused to pay maintenance cost of seized cattle

Cattle rearing is essentially an economic activity.   Under the Bill, cattle may be seized by a police officer on the basis of suspicion that an offence has been or may be committed.  Seized cattle may be handed over to a care institution, and the cost of its maintenance during trial will be recovered from such persons as prescribed by the state government through rules.  Note that there is no time frame for completing a trial under the Bill.  Thus, if the owner or transporter of seized cattle is made liable to pay its maintenance cost, they may be deprived of their source of livelihood for an indefinite period while at the same time incurring a cost.

Cattle preservation laws in other states

The Directive Principles of State Policy under the Constitution call upon the state to prohibit the slaughter of cows, calves, and other milch and draught cattle.  Currently, more than 20 states have laws restricting the slaughter of cattle (cows, bulls, and bullocks) and buffaloes to various degrees.   Table 1 below shows a comparison of such laws in select states of India.  Notably, north-eastern states such as Arunachal Pradesh, Meghalaya, Mizoram and Nagaland do not have any law regulating cattle slaughter.